All Locations
730 unique locations (4248 components) - Page 1 of 30
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (31 components)
Wytch Farm, Wareham BH20 5JR (4 components)
Two gas turbines (CX501-KB7) rated at 5.3MW each. (4)
Wormald Green, Land North of Sunnyside Gardens, Harrogate HG3 3RX (6 components)
8MW Energy Storage facility located in Harrogate. (4)
Woodlands Centre, Composting Facility, Whitesmith, Lewes, East Sussex, BN8 6JD (7 components)
In- vessel composting facility. Heavy plant used to produce animal feed and garden compost that can be turned down for DSR. (5)
Woodend Farm, Bigrigg, Cumbria, CA22 2TA (5 components)
Lithium Ion battery storage system capable of importing, storing and exporting electricity. (4)
Wolverhampton EfW Crown Street West Midlands WV1 1QB (3 components)
Woburn Sands HL, WOBURN SANDS HL, Off Woburn Sands Road, Woburn Sands, MILTON KEYNES, MK17 8RR, (3 components)
The CMU Component reduces import demand by turning on back up generation. (2)
Wixoe BS, WIXOE BS, Off Church Terrace, Wixoe, HALSTEAD Essex, CO10 8UA, (3 components)
The CMU Component reduces import demand by turning on back up generation. (2)
Winteringham STW, INTERINGHAM STW, Ermine Street, Winteringham, LINCOLN, DN15 0AA, (3 components)
The CMU Component reduces import demand by turning on back up generation. (2)
Windsor Road, Redditch, Worcestershire, B97 6EF (5 components)
The CMU is composed of two CHPs (ECOMAX® 15 NGS) with an electrical output capacity of 1.501 MWe each. The CMU will supply electricty on site to METTIS AEROSPACE LIMITED. (4)
Wincham Lane, Wincham, Northwich, CW9 6DE (9 components)
New build power station comprised of multiple reciprocating engines. (5)
Wimbourne Bournemouth BH21 5EP (4 components)
Water treatment centre (3)
Willows Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9TQ (3 components)
Willow Farm Doncaster Road Tadcaster LS24 9PA (2 components)
New build power station comprised of multiple reciprocating engines. (2)
Willand reserve Power EX15 2PJ (1 component)
16MW gas fired engines provide back up power to the local grid
Whitton WTW, Whitton WTW, Thurleston Lane, IPSWICH, IP1 6TG, (3 components)
The CMU Component reduces import demand by turning on back up generation. (2)
Whittington Rd, Barrow Hill, Chesterfield S43 2PW (2 components)
New reciprocating genset in acoustic enclosure (2)
Whilton STW, Anglian Water WRC, Whilton Locks, Whilton, NORTHAMPTON, NN11 2NH (3 components)
The CMU Component reduces import demand by turning on back up generation. (2)
Wherstead WR, WHERSTEAD-WB, Track off 137 (op The Street), Wherstead, IPSWICH, IP9 2AP, (3 components)
The CMU Component reduces import demand by turning on back up generation. (2)
Wheldale 2 Wheldale Road Castleford West Yorkshire WF10 2RT (2 components)
Gas reciprocating engines (2)
West Thurrock London Road, W THURROCK-LONDON RD SP, London Road, West Thurrock, GRAYS Essex, RM20 3LG (3 components)
The CMU Component reduces import demand by turning on back up generation. (2)
West Pinchbeck WTW, WEST PINCHBECK WTW, Parsons Drove, West Pinchbeck, SPALDING Lincolnshire, PE11 3QW, (3 components)
The CMU Component reduces import demand by turning on back up generation. (2)
Weston WB, WESTON WB, High Road, Weston, SPALDING Lincolnshire, PE12 6RA, (3 components)
The CMU Component reduces import demand by turning on back up generation. (2)
Weston Point CHP, INEOS Salt Works, Mersey View Road, Weston Point, Runcorn, WA7 4HB (11 components)
1 x OCGT (5)