Home Technologies Companies Locations Map Explorer FAQ Trading Board Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Capacity Market Search
Menu
Home
  • Technologies
  • Companies
  • Locations
  • Map Explorer
  • FAQ
  • Trading Board
  • Buy Me A Coffee
  • Help

  • Login
  • Register

  • Theme
  • Light
  • Dark
  • Auto
  • Welcome to Capacity Market Search
    🗺️ 1 week free trial to explore all features!

    You can explore the basic features, but will need to register for continued access to premium features like the interactive map.

    Choose your contribution amount
    Unlimited access to all premium features

    Secure payment • No subscription • Lifetime access

    Understanding AuctionsSearch ResultsComponent GroupingSortingMap ViewContact Us

    Search Guide

    This registry provides comprehensive search capabilities across all Capacity Market components:

    • Company Search: Enter a company name (e.g., "Drax", "EDF") to see all their components
    • Location Search: Search by city, region, or postcode (e.g., "Manchester", "SW1")
    • CMU ID Search: Enter a specific CMU ID to find exact components
    • Technology Search: Enter technology types like "Hydro", "OCGT", or "Battery"

    The search is intelligent and will try to determine what you're looking for based on your query.

    You can combine search terms to narrow results, such as "London Battery" to find battery storage in London.

    Searches are not case-sensitive, and partial matches are supported (e.g., "Manch" will find "Manchester").

    Understanding Auctions

    The Capacity Market runs regular auctions where providers compete to secure agreements. There are two main types:

    • T-4 auctions: Held 4 years ahead of the delivery year
    • T-1 auctions: Held 1 year ahead to fine-tune capacity requirements

    Each auction results in agreements that specify how much capacity providers must deliver and the payment they'll receive.

    Auction years are displayed as badges (e.g., 2023-24) that you can click to view details for that specific auction year.

    The Capacity Market ensures the UK has sufficient electricity supply during periods of high demand or system stress.

    Providers receive payments for ensuring their capacity is available, creating a more stable and resilient electricity market.

    Search Results

    Search results are grouped by location and show important details about each component:

    • Active Components with auction years 2024-25 or later
    • In-Active Components with only auction years before 2024-25
    • Company Name Click to view all components for this company
    • Technology Click to search for this technology type
    • CMU: XXX Click to search for this CMU ID
    • Auction Year Click to view details for this specific auction

    Each result shows the component's capacity, location details, and participation in specific auction years.

    You can sort results by relevance, location, or date using the sort options.

    Pagination controls appear at the bottom when there are multiple pages of results.

    Component Grouping

    Components at the same location with the same description are grouped together to reduce duplication.

    Each group shows:

    • All CMU IDs for components at that location
    • All auction years, sorted with newest first
    • An Active/Inactive status based on auction years

    Grouping helps identify multi-year contracts and related components at the same site.

    The total capacity shown combines all components in the group.

    Components can be expanded to show individual details by clicking the expand icon.

    Sorting and Filtering

    You can sort search results by:

    • Relevance: Most relevant matches first
    • Location: Alphabetical order by location name
    • Date: By auction year (newest or oldest first)
    • Capacity: Highest or lowest capacity first

    Click the column headers to change sort order.

    You can filter results using the search refinements at the top of the results page:

    • Filter by technology type (e.g., only show batteries)
    • Filter by active status (show only active or inactive components)
    • Filter by auction year (show only components from specific auctions)

    Map Explorer & Map View

    We provide two map-based tools for exploring capacity market data:

    Map Explorer

    The Map Explorer is our advanced interactive mapping tool, specifically designed for comprehensive data exploration with:

    • Mobile-Optimized Interface: Responsive design that works perfectly on phones and tablets
    • Advanced Filtering: Filter by technology type, company, delivery year, and active status
    • Smart Sidebar: Desktop users get a dedicated filter panel, mobile users get collapsible filters
    • Full-Screen Map: Maximizes map space for detailed geographical analysis
    Search Map View

    The Search Map View combines search functionality with map visualization, offering:

    • Search-First Approach: Start with text searches, then visualize results on the map
    • Integrated Results: Search results and map display work together
    • Performance Optimized: Streamlined for fast search result mapping

    Both tools provide a visual representation of capacity distribution across the UK, but serve different exploration needs.

    Map Features:
    • Technology Colors: Different technology types are shown with distinct colors on the map for easy identification:
      GasDSRNuclearCHPSolarWind
      BatteryBiomassHydroInterconnectorCoalOther
    • Technology Legend: The map legend shows all available technologies with their corresponding colors and component counts
    • Search Results on Map: You can view any search results on the map by clicking "View on Map" from search results pages
    • Smart Clustering: Areas with multiple components are automatically grouped into clusters - click clusters to zoom in and see individual components
    • Interactive Markers: Click on individual markers to see detailed information about components at that location

    Use the map controls to zoom in on specific regions or areas of interest. The map automatically adjusts clustering based on your zoom level to provide the clearest view of capacity distribution.

    Contact Us

    We're here to help with any questions about the Capacity Market Registry.

    Email

    For general inquiries and support:

    For LLMs

    Complete programmatic access guide for LLMs:

    Loading...
    Loading...

    Search Results for "YO8"

    63 unique locations (329 components) - Page 1 of 2

    All
  • Active
  • Inactive
  • All Markets
  • Capacity Market
  • SFFR
  • Sort by: Relevance A-Z Components MW Date
    All
  • Active
  • Inactive
  • All Markets
  • Capacity Market
  • SFFR
  • Sort:
    ABBOTS MEWS SELBY YO8(4 components)

    EV charging at residential premises (3)

    DSREV ChargingPlutus Energy LTDYO8
    Active • 2027-28 (T-4), 2026-27 (T-4) ...
    ANDREW CHAPEL COURT SELBY YO8(4 components)

    EV charging at residential premises (3)

    DSREV ChargingPlutus Energy LTDYO8
    Active • 2027-28 (T-4), 2026-27 (T-4) ...
    BAFFAM COURT BAFFAM LANE BRAYTON SELBY YO8(1 component)

    EV charging at residential premises

    DSREV ChargingPlutus Energy LTDYO8
    Inactive • 2023-24 (T-1)
    Bay Street Thorpe Willoughby SELBY North Yorkshire YO8(4 components)

    EV charging at residential premises (3)

    DSREV ChargingPlutus Energy LTDYO8
    Active • 2027-28 (T-4), 2026-27 (T-4) ...
    BRAYTON WATER PUMPING STATION, OFF BARFF LANE, NON PAF, THORPE WILLOUGHBY, SELBY, N.YORKSHIRE, YO8 9NJ(1 component)

    On site reduction in consumption

    DSRWaterswallows Energy LimitedYO8
    Active • 2024-25 (T-1)
    Bridle Walk, Selby, North Yorkshire, YO8(1 component)

    Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

    DSRBatteryPlutus Energy LTDYO8
    Active • 2025-26 (T-1)
    Camela Lane, Camblesforth, North Yorkshire, England, YO8 8HA.(1 component)

    New Build Battery Storage

    BatteryStorage (Duration 2.5h)COMMON FARM SOLAR PARK LIMITEDYO8
    Active • 2028-29 (T-4)
    1.57 MW
    Carr Street Selby YO8 8AW(1 component)

    New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

    OCGT and Reciprocating Engines (Fuel Type - Gas)Plutus Energy LTDYO8
    Inactive • 2021-22 (T-4)
    CHERRY TREE WALK BARLBY SELBY YO8(4 components)

    EV charging at residential premises (3)

    DSREV ChargingPlutus Energy LTDYO8
    Active • 2027-28 (T-4), 2026-27 (T-4) ...
    COMMON ROAD SKIPWITH SELBY YO8(4 components)

    EV charging at residential premises (3)

    DSREV ChargingPlutus Energy LTDYO8
    Active • 2027-28 (T-4), 2026-27 (T-4) ...
    Denison road, Selby, North Yorkshire, YO8 8AN.(8 components)

    Gas Turbine Cogeneration Unit GT3 (3)

    Combined Heat and Power (CHP)Plutus Energy LTDYO8
    Active • 2026-27 (T-4), 2025-26 (T-4) ...
    14.01 MW
    Denison Road, Selby, North Yorkshire YO8 8AN(18 components)

    One 8 MWe Gas Turbine Cogeneration Unit (GT2) (5)

    CHP and autogenerationCombined Heat and Power (CHP)Plutus Energy LTDYO8
    Active • 2026-27 (T-4), 2025-26 (T-4) ...
    7.51 MW
    Denison Road, Selby, North Yorkshire YO8 8AN(15 components)

    One 8 MWe Gas Turbine Cogeneration Unit (GT2) (3)

    CHP and autogenerationCombined Heat and Power (CHP)Plutus Energy LTDYO8
    Active • 2026-27 (T-4), 2025-26 (T-4) ...
    7.51 MW
    Drax Power Station Drax Selby YO8 8PH(8 components)
    • Unit 1 fuelled by Biomass at Drax Power Station
    • Unit 2 fuelled by Biomass at Drax Power Station
    • Unit 3 fuelled by Biomass at Drax Power Station
    BiomassPlutus Energy LTDYO8
    Active • 2028-29 (T-4), 2027-28 (T-4)
    2238.05 MW
    Drax Power Station, Drax, Selby, YO8 8PH(22 components)

    This CMU component is a coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-6 under the BSC. (3)

    CoalCoal/biomassOpen Cycle Gas Turbine (OCGT)OCGT and Reciprocating Engines (Fuel Type - Diesel)Plutus Energy LTDYO8
    Active • 2028-29 (T-4), 2027-28 (T-4) ...
    Drax Power Station, Selby, North Yorkshire, YO8 8PH(58 components)
    • A coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5.
    • This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-10G under the BSC.
    • This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-12G under the BSC.
    CoalCoal/biomassOpen Cycle Gas Turbine (OCGT)Plutus Energy LTDYO8
    Active • 2028-29 (T-4), 2027-28 (T-4) ...
    268.28 MW
    Drax Power Station, Selby, YO8 8PH(1 component)

    New Build Combined Cycle Gas Turbine plant to be installed on designated land at the Drax Power Station site

    Combined Cycle Gas Turbine (CCGT)Plutus Energy LTDYO8
    Inactive • 2023-24 (T-4)
    DYON WAY BUBWITH SELBY YO8(4 components)

    EV charging at residential premises (3)

    DSREV ChargingPlutus Energy LTDYO8
    Active • 2027-28 (T-4), 2026-27 (T-4) ...
    FARRIER CLOSE THORPE WILLOUGHBY SELBY NORTH YORKSHIRE YO8(4 components)

    EV charging at residential premises (3)

    DSREV ChargingPlutus Energy LTDYO8
    Active • 2027-28 (T-4), 2026-27 (T-4) ...
    FIELD LANE WISTOW SELBY YO8(8 components)

    EV charging at residential premises (3)

    DSREV ChargingPlutus Energy LTDYO8
    Active • 2027-28 (T-4), 2026-27 (T-4) ...
    FOXGLOVE WAY HAMBLETON SELBY NORTH YORKSHIRE YO8(4 components)

    EV charging at residential premises (3)

    DSREV ChargingPlutus Energy LTDYO8
    Active • 2027-28 (T-4), 2026-27 (T-4) ...
    Hales Lane Drax Selby YO8 8PL(1 component)

    A 99.9MW battery storage system comprising approx 13 battery skid units at Hales Lane

    BatteryStorage (Duration 1h)Plutus Energy LTDYO8
    Active • 2025-26 (T-4)
    HIGHFIELD CRESCENT BARLBY SELBY YO8(4 components)

    EV charging at residential premises (3)

    DSREV ChargingPlutus Energy LTDYO8
    Active • 2027-28 (T-4), 2026-27 (T-4) ...
    HILLAM ROAD GATEFORTH SELBY YO8(4 components)

    EV charging at residential premises (3)

    DSREV ChargingPlutus Energy LTDYO8
    Active • 2027-28 (T-4), 2026-27 (T-4) ...
    Hobby Way, Selby, North Yorkshire, YO8(1 component)

    Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

    DSRBatteryPlutus Energy LTDYO8
    Active • 2025-26 (T-1)
    HOLME CLOSE SELBY YO8(4 components)

    EV charging at residential premises (3)

    DSREV ChargingPlutus Energy LTDYO8
    Active • 2027-28 (T-4), 2026-27 (T-4) ...
    HOWARD CLOSE THORPE WILLOUGHBY SELBY NORTH YORKSHIRE YO8(4 components)

    EV charging at residential premises (3)

    DSREV ChargingPlutus Energy LTDYO8
    Active • 2027-28 (T-4), 2026-27 (T-4) ...
    Land at The Magazine, Hull Road, Selby, YO8 5BJ(24 components)
    • Battery energy storage unit (2)
    • Battery storage unit
    BatteryStorage (Duration 2h)Plutus Energy LTDYO8
    Active • 2028-29 (T-4), 2027-28 (T-4)
    29.76 MW
    LEEDS ROAD SELBY YO8(4 components)

    EV charging at residential premises (3)

    DSREV ChargingPlutus Energy LTDYO8
    Active • 2027-28 (T-4), 2026-27 (T-4) ...
    LODGE DYON LANE SOUTH DUFFIELD SELBY YO8(4 components)

    EV charging at residential premises (3)

    DSREV ChargingPlutus Energy LTDYO8
    Active • 2027-28 (T-4), 2026-27 (T-4) ...
    LODGE DYON LANE, SOUTH DUFFIELD, SELBY, YO8(4 components)

    EV charging on residential premises (3)

    DSREV ChargingPlutus Energy LTDYO8
    Active • 2026-27 (T-4), 2025-26 (T-4) ...
    Main Road, North Yorkshire, Selby, YO8(1 component)

    Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

    DSRBatteryPlutus Energy LTDYO8
    Active • 2025-26 (T-1)
    Mayfield Drive Brayton Selby YO8(4 components)

    EV charging at residential premises (3)

    DSREV ChargingPlutus Energy LTDYO8
    Active • 2027-28 (T-4), 2026-27 (T-4) ...
    MYRTLE AVENUE SELBY YO8(1 component)

    EV charging at residential premises

    DSREV ChargingPlutus Energy LTDYO8
    Inactive • 2023-24 (T-1)
    OAK FIELD BRAYTON SELBY YO8(4 components)

    EV charging at residential premises (3)

    DSREV ChargingPlutus Energy LTDYO8
    Active • 2027-28 (T-4), 2026-27 (T-4) ...
    OAKLANDS CAMBLESFORTH SELBY YO8(4 components)

    EV charging at residential premises (3)

    DSREV ChargingPlutus Energy LTDYO8
    Active • 2027-28 (T-4), 2026-27 (T-4) ...
    Olympia Mills, Barlby Rd, Selby YO8 5AF multisite(3 components)

    Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (2)

    DSRPlutus Energy LTDYO8
    Active • 2026-27 (T-4), 2023-24 (T-1)
    Olympia Mills, Barlby Rd, Selby YO8 5AF, United Kingdom(6 components)

    Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

    DSRPlutus Energy LTDYO8
    Active • 2028-29 (T-4), 2027-28 (T-4) ...
    OUSEGATE SELBY YO8(4 components)

    EV charging at residential premises (3)

    DSREV ChargingPlutus Energy LTDYO8
    Active • 2027-28 (T-4), 2026-27 (T-4) ...
    RICHARDSON COURT HAMBLETON SELBY YO8(4 components)

    EV charging at residential premises (3)

    DSREV ChargingPlutus Energy LTDYO8
    Active • 2027-28 (T-4), 2026-27 (T-4) ...
    Rusholme Grange, Drax, Selby, YO8 8PW(1 component)

    The CMU component at Rusholme Grange is an energy storage system comprised of Lithium-ion batteries. The system will have a 35 MW export capacity and an import capacity of 36.8 …

    BatteryStoragePlutus Energy LTDYO8
    Inactive • 2021-22 (T-4)
    Rusholme Grange, Drax, YO8 8PW(4 components)
    • New build 35MW Battery Energy Storage System (2)
    • Lithium-ion Battery Energy Storage System
    BatteryStorage (Duration 2h)Storage (Duration 1.5h)HARMONY RH LTDYO8
    Active • 2025-26 (T-4), 2024-25 (T-1) ...
    12.96 MW
    Scalm Park, Wistow Common, Selby, Yorkshire, YO8 3RD(1 component)

    New Build Battery Storage Facility

    BatteryStorage (Duration 4h)Plutus Energy LTDYO8
    Active • 2028-29 (T-4)
    16.70 MW
    Selby, North Yorkshire, YO8 6PG(2 components)
    • A 40MW Distribution Connected Battery Energy Storage System
    • A Distribution Connected Battery Energy Storage System
    BatteryStorage (Duration 2h)Storage (Duration 4h)Plutus Energy LTDYO8
    Active • 2028-29 (T-4)
    25.07 MW
    Sherwood Drive Thorpe Willoughby Selby North Yorkshire YO8(4 components)

    EV charging at residential premises (3)

    DSREV ChargingPlutus Energy LTDYO8
    Active • 2027-28 (T-4), 2026-27 (T-4) ...
    Spring Walk, Brayton, Selby, North Yorkshire, YO8(1 component)

    Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

    DSRBatteryPlutus Energy LTDYO8
    Active • 2025-26 (T-1)
    Spring Walk Selby North Yorkshire YO8(4 components)

    EV charging at residential premises (3)

    DSREV ChargingPlutus Energy LTDYO8
    Active • 2027-28 (T-4), 2026-27 (T-4) ...
    The Green, Wistow, Selby, North Yorkshire , YO8(1 component)

    Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

    DSRBatteryPlutus Energy LTDYO8
    Active • 2025-26 (T-1)
    Unit 1b, Access 63, East Common Lane, Selby YO8 8GA(1 component)

    New build power plant comprising of 8 x 2MW gas reciprocating engines connected to host DNO network

    OCGTSELBY POWER LIMITEDYO8
    Inactive • 2017-18 (T-1)
    Unit 1b, Access 63, East Common Lane, Selby, YO8 8GA(1 component)

    Power plant comprising of 8 x 2MW gas reciprocating engines connected to the local distribution network.

    OCGT and Reciprocating Engines (Fuel Type - Gas)SELBY POWER LIMITEDYO8
    Inactive • 2018-19 (T-1)
    Loading map...
    Welcome to Capacity Market Search
    🗺️ 1 week free trial to explore all features!

    You can explore the basic features, but will need to register for continued access to premium features like the interactive map.

    Choose your contribution amount
    Unlimited access to all premium features

    Secure payment • No subscription • Lifetime access