Search Results for "WF11"

29 unique locations (130 components)

Spawd Bone Lane, Knottingley, WF11 0HP (1 component)

"ARDAGH GLASS LTD Spawd Bone Lane, Knottingley, WF11 0HP The CMU Component reduces import demand by turning off equipment and other non-essential loads."

Inactive • 2017-18 (TR)
RWE Generation UK plc Ferrybridge A Workshop Site Old Great North Road Knottingley WF11 8PR (1 component)

A CMU will be formed of an Open Cycle Gas Turbine unit.

Inactive • 2022-23 (T-4)
RWE Ferrybridge A Workshops Old North Road Ferrybridge Knottingley WF11 8NG (1 component)

CMU will be formed of multiple individual gas reciprocating engine units

Inactive • 2021-22 (T-4)
LAND EAST OF HOLMFIELD LANE, CASTLEFORD, WF11 8SF (4 components)
• New Build Battery Energy Storage system (2)
• New Build 49.99 MW Battery Energy Storage system
Active • 2028-29 (T-4), 2027-28 (T-4) ...
30.54 MW
Land at Multitech Kirkhaw Lane Ferrybridge WF11 8RD (2 components)

5 MW battery storage facility (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Knottingley Power Limited Knottingley CCGT Power Station Common Lane Knottingley West Yorkshire WF11 8DA (4 components)
• Knottingley Unit 1 is a combined cycle gas turbine generating unit (2)
• Knottingly Unit 2 is a combined cycle gas turbine generating unit
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Knottingley Hydropower Station Brotherton Weir Knottingley West Yorkshire WF11 8HR (3 components)

1.200 MW battery storage (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
0.14 MW
Kirkhaw Lane Knottingley WF11 8RD (2 components)

New build power station comprised of multiple reciprocating engines. (2)

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Kirkhaw Lane, Ferrybridge, WF11 8RD (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2025-26 (T-4)
Kings Mill, Forge Lane, Knottingly, Wakefield, WF11 8HR (3 components)

Flour Mill (3)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Kings Mill, Forge Lane. Kknottingly, WF11 8HR (1 component)

Flour milling

Inactive • 2017-18 (TR)
Kellingley Turvers Lane, Knottingley, West Yorkshire, WF11 8DT. (1 component)

5 x Jenbacher 320 (1.4MW)

Inactive • 2017-18 (T-1)
Kellingley Colliery Turvers Lane, Knottingley, West Yorkshire, WF11 8DT. (3 components)

5 x Jenbacher 420 (1.4MW) (3)

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Ferrybridge Multifuel Energy Limited Stranglands Lane Knottingley West Yorkshire WF11 8DX (3 components)

FM1 is a twin boiler, single steam turbine energy from waste plant exporting at 132kV. (2)

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Ferrybridge Multifuel 2 Stranglands Lane Knottingley West Yorkshire WF11 8SQ (1 component)

FM2 is a twin boiler, single steam turbine energy from waste plant exporting at 132kV

Inactive • 2020-21 (T-4)
Ferrybridge MFE Limited Kirkhaw Lane Off Stranglands Lane Knottingley West Yorkshire WF11 8DX (2 components)

FM1 is a twin boiler, single steam turbine energy from waste plant exporting at 132kV to the NPG area network. (2)

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Ferrybridge BESS, Knottingley, Ferrybridge, Wakefield, West Yorkshire, Yorkshire. WF11 8TB (3 components)

The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries. (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
89.14 MW
enfinium Ferrybridge 2 Limited Kirkhaw Lane, off Stranglands Lane Knottingley West Yorkshire WF11 8DX (2 components)

FM2 is a twin boiler, single steam turbine energy from waste plant exporting at 132kV to the NPG area network (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
135.94 MW
enfinium Ferrybridge 1 Limited Kirkhaw Lane off Stranglands Lane Knottingley West Yorkshire WF11 8DX (4 components)

FM1 is a twin boiler, single steam turbine energy from waste plant exporting at 132kV to the NPG area network. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
207.26 MW
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (7 components)
• 1.200MW Battery Energy Storage System (2)
• 1.2 MW of demand reduction
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Ardagh Glass, Headlands Lane, Knottingley WF11 0HP (10 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
ADM Milling Knottingley, Forge Mill La, Knottingley WF11 8HR (3 components)

The CMU Component reduces import demand by turning on back up generation. (3)

Active • 2024-25 (T-4), 2023-24 (T-1) ...
1 Kirkshaw Lane, Ferrybridge, Knottingley, WF11 8RD (4 components)
• AN 8MW new build gas generating station..
• CMU FES002 which is an electrical power generating unit comprised of multiple gas reciprocating engines with an aggregated exporting capacity …
• CMU FES26B which is an electrical power generating unit comprised of multiple gas reciprocating engines with an aggregated exporting capacity …
Active • 2026-27 (T-4), 2024-25 (T-4)
7.14 MW
1 Kirkhaw Lane Knottingley WF11 8RD (1 component)

20 MW Storage facility located at Knottingley.

Inactive • 2021-22 (T-4)
Loading map...
Showing 29 locations