Home Technologies Companies Locations Map Explorer FAQ ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Home Technologies Companies Locations Map Explorer FAQ ChatGPT Buy Me A Coffee Help
Capacity Market Search
Menu
Home
  • Technologies
  • Companies
  • Locations
  • Map Explorer
  • FAQ
  • ChatGPT

  • Buy Me A Coffee
  • Help

  • Login
  • Register

  • Theme
  • Light
  • Dark
  • Auto
  • Understanding AuctionsSearch ResultsComponent GroupingSortingMap ViewContact Us

    Search Guide

    This registry provides comprehensive search capabilities across all Capacity Market components:

    • Company Search: Enter a company name (e.g., "Drax", "EDF") to see all their components
    • Location Search: Search by city, region, or postcode (e.g., "Manchester", "SW1")
    • CMU ID Search: Enter a specific CMU ID to find exact components
    • Technology Search: Enter technology types like "Hydro", "OCGT", or "Battery"

    The search is intelligent and will try to determine what you're looking for based on your query.

    You can combine search terms to narrow results, such as "London Battery" to find battery storage in London.

    Searches are not case-sensitive, and partial matches are supported (e.g., "Manch" will find "Manchester").

    Understanding Auctions

    The Capacity Market runs regular auctions where providers compete to secure agreements. There are two main types:

    • T-4 auctions: Held 4 years ahead of the delivery year
    • T-1 auctions: Held 1 year ahead to fine-tune capacity requirements

    Each auction results in agreements that specify how much capacity providers must deliver and the payment they'll receive.

    Auction years are displayed as badges (e.g., 2023-24) that you can click to view details for that specific auction year.

    The Capacity Market ensures the UK has sufficient electricity supply during periods of high demand or system stress.

    Providers receive payments for ensuring their capacity is available, creating a more stable and resilient electricity market.

    Search Results

    Search results are grouped by location and show important details about each component:

    • Active Components with auction years 2024-25 or later
    • In-Active Components with only auction years before 2024-25
    • Company Name Click to view all components for this company
    • Technology Click to search for this technology type
    • CMU: XXX Click to search for this CMU ID
    • Auction Year Click to view details for this specific auction

    Each result shows the component's capacity, location details, and participation in specific auction years.

    You can sort results by relevance, location, or date using the sort options.

    Pagination controls appear at the bottom when there are multiple pages of results.

    Component Grouping

    Components at the same location with the same description are grouped together to reduce duplication.

    Each group shows:

    • All CMU IDs for components at that location
    • All auction years, sorted with newest first
    • An Active/Inactive status based on auction years

    Grouping helps identify multi-year contracts and related components at the same site.

    The total capacity shown combines all components in the group.

    Components can be expanded to show individual details by clicking the expand icon.

    Sorting and Filtering

    You can sort search results by:

    • Relevance: Most relevant matches first
    • Location: Alphabetical order by location name
    • Date: By auction year (newest or oldest first)
    • Capacity: Highest or lowest capacity first

    Click the column headers to change sort order.

    You can filter results using the search refinements at the top of the results page:

    • Filter by technology type (e.g., only show batteries)
    • Filter by active status (show only active or inactive components)
    • Filter by auction year (show only components from specific auctions)

    Map Explorer & Map View

    We provide two map-based tools for exploring capacity market data:

    Map Explorer

    The Map Explorer is our advanced interactive mapping tool, specifically designed for comprehensive data exploration with:

    • Mobile-Optimized Interface: Responsive design that works perfectly on phones and tablets
    • Advanced Filtering: Filter by technology type, company, delivery year, and active status
    • Smart Sidebar: Desktop users get a dedicated filter panel, mobile users get collapsible filters
    • Full-Screen Map: Maximizes map space for detailed geographical analysis
    Search Map View

    The Search Map View combines search functionality with map visualization, offering:

    • Search-First Approach: Start with text searches, then visualize results on the map
    • Integrated Results: Search results and map display work together
    • Performance Optimized: Streamlined for fast search result mapping

    Both tools provide a visual representation of capacity distribution across the UK, but serve different exploration needs.

    Map Features:
    • Technology Colors: Different technology types are shown with distinct colors on the map for easy identification:
      GasDSRNuclearCHPSolarWind
      BatteryBiomassHydroInterconnectorCoalOther
    • Technology Legend: The map legend shows all available technologies with their corresponding colors and component counts
    • Search Results on Map: You can view any search results on the map by clicking "View on Map" from search results pages
    • Smart Clustering: Areas with multiple components are automatically grouped into clusters - click clusters to zoom in and see individual components
    • Interactive Markers: Click on individual markers to see detailed information about components at that location

    Use the map controls to zoom in on specific regions or areas of interest. The map automatically adjusts clustering based on your zoom level to provide the clearest view of capacity distribution.

    Contact Us

    We're here to help with any questions about the Capacity Market Registry.

    Email

    For general inquiries and support:

    For LLMs

    Complete programmatic access guide for LLMs:

    Search / All Locations / All Postcodes / WA9 / WA9 5DS

    Greengate Works Power Station, Sutton Heath Road or Burtonhead Road, St Helens, WA9 5DS

    28.28 MW (Est from CMU) (part of 28.28 MW aggregated CMU)
    Total Capacity
    WA9 5DS
    Postcode
    23
    Components
    Active*
    2028-29
    Prequalified
    Prequalification
    * Latest auction year on record
    Descriptions:
    • The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
    • Generating Unit 2
    • The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
    Trading Contacts:
    UK POWER RESERVE LIMITED
    '+4401217121970
    SSEPG (OPERATIONS) LIMITED
    '+441738340483 [email protected]
    ENEL X UK LIMITED
    '+4402037954936
    Other Locations at This Postcode 1 location
    Hurst Property Management Burtonhead Road St. Helens WA9 5DS
    Unknown KIWI POWER LTD1 component

    CMU Registry Data

    CMU 24PR11
    9.349 UK POWER RESERVE …
    Rejected
  • ✗ Rejected
  • 2028-29
    Capacity Information
    De-Rated Capacity
    9.349
    Connection/DSR Capacity
    10
    Anticipated Capacity
    9.349
    Max Obligation Period
    1
    Unit Information
    CMU Type
    Non CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Organization
    Company Name
    N/A
    Parent Company
    SEMBCORP ENERGY UK LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    _id
    15145
    CMU ID
    24PR11
    Auction
    Capacity Auction
    Auction Name
    2028-29 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Greengate Power Station
    Name of Applicant
    UK POWER RESERVE LIMITED
    Pre-Qualification Decision
    Rejected
    Transmission / Distribution
    Distribution
    Secondary Trading Contact - Email
    Secondary Trading Contact - Telephone
    '+4401217121970
    Auction Participation History
    2028-29T-42028-29 (T-4) Four Year Ahead Capacity Auction
    9.35 MW Rejected
    Component ID: 534846
    Capacity: 9.35 MW
    Status: Rejected
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 511 944
    • Location and Post Code: Greengate Works Power Station, Sutton Heath Road or Burtonhead Road, St Helens, WA9 5DS
    • Primary Fuel of Component: Gas
    • Generating Technology Class: Reciprocating engines
    • Description of CMU Components: The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
    CMU 22PR11
    9.515 UK POWER RESERVE …
    Prequalified
  • ✓ Prequalified
  • 2026-27
    Capacity Information
    De-Rated Capacity
    9.515
    Connection/DSR Capacity
    9.997
    Anticipated Capacity
    9.518
    Max Obligation Period
    1
    Unit Information
    CMU Type
    Non CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    SEMBCORP ENERGY UK LIMITED
    Registered Holder
    UK POWER RESERVE LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2026-22PR11-001
    Agreement Term
    1
    _id
    13422
    CMU ID
    22PR11
    Auction
    Capacity Auction
    Auction Name
    2026-27 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Greengate Power Station
    Name of Applicant
    UK POWER RESERVE LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    Date of Issue of Capacity Agreement
    2023-03-31
    Auction Acquired Capacity Obligation
    9.515
    Secondary Trading Contact - Telephone
    '+4401217121970
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2026/2027
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2026-27T-42026-27 (T-4) Four Year Ahead Capacity Auction
    9.52 MW Prequalified
    Component ID: 281030
    Capacity: 9.52 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 511 944
    • Location and Post Code: Greengate Works Power Station, Sutton Heath Road or Burtonhead Road, St Helens, WA9 5DS
    • Generating Technology Class: Reciprocating engines
    • Description of CMU Components: The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
    CMU 16PR11
    9.417 UK POWER RESERVE …
    Prequalified (2)
  • ✓ Prequalified
  • ✓ Prequalified
  • 2024-25 2017-2024
    Capacity Information
    De-Rated Capacity
    9.417
    Connection/DSR Capacity
    10
    Anticipated Capacity
    9.417
    Max Obligation Period
    1
    Unit Information
    CMU Type
    Non CMRS
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Registered Holder
    UK POWER RESERVE LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2020-16PR11-001
    Agreement Term
    1
    _id
    3650
    CMU ID
    16PR11
    Auction
    Capacity Auction
    Auction Name
    2020-21 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Greengate Power Station
    Name of Applicant
    UK POWER RESERVE LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Date of Issue of Capacity Agreement
    2017-01-20
    Auction Acquired Capacity Obligation
    9.417
    Secondary Trading Contact - Telephone
    '+4401217121970
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2020/2021
    Auction Participation History
    2024-25T-42024-25 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 114102
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NH 318 296
    • Location and Post Code: Fasnakyle Power Station, Cannich, Beauly, IV4 7NB
    • Generating Technology Class: Hydro
    • Description of CMU Components: Generating Unit 2
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 536142
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 510 944
    • Location and Post Code: Greengate Works Power Station, Sutton Heath Road or Burtonhead Road, St Helens, WA9 5DS
    • Description of CMU Components: The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 584900
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 510 944
    • Location and Post Code: Greengate Works Power Station, Sutton Heath Road or Burtonhead Road, St Helens, WA9 5DS
    • Description of CMU Components: The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 661270
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 510 944
    • Location and Post Code: Greengate Works Power Station, Sutton Heath Road or Burtonhead Road, St Helens, WA9 5DS
    • Description of CMU Components: The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 584882
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 510 944
    • Location and Post Code: Greengate Works Power Station, Sutton Heath Road or Burtonhead Road, St Helens, WA9 5DS
    • Description of CMU Components: The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 683676
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 510 944
    • Location and Post Code: Greengate Works Power Station, Sutton Heath Road or Burtonhead Road, St Helens, WA9 5DS
    • Description of CMU Components: The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
    CMU 19PR11
    9.413 UK POWER RESERVE …
    Prequalified
  • ✓ Prequalified
  • 2023-24
    Capacity Information
    De-Rated Capacity
    9.413
    Connection/DSR Capacity
    9.91
    Anticipated Capacity
    18.911
    Max Obligation Period
    1
    Unit Information
    CMU Type
    Non CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    SEMBCORP ENERGY UK LIMITED
    Registered Holder
    UK POWER RESERVE LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2023-19PR11-001
    Agreement Term
    1
    _id
    9391
    CMU ID
    19PR11
    Auction
    Capacity Auction
    Auction Name
    2023-24 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Greengate Power Station
    Name of Applicant
    UK POWER RESERVE LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2020-04-17
    Auction Acquired Capacity Obligation
    9.413
    Secondary Trading Contact - Telephone
    '+4401217121970
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2023/2024
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2023-24T-42023-24 (T-4) Four Year Ahead Capacity Auction
    9.41 MW Prequalified
    Component ID: 277350
    Capacity: 9.41 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 510 944
    • Location and Post Code: Greengate Works Power Station, Sutton Heath Road or Burtonhead Road, St Helens, WA9 5DS
    • Generating Technology Class: Reciprocating engines
    • Description of CMU Components: The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
    CMU 18PR11
    SEMBCORP ENERGY UK …
    Prequalified
  • ✓ Prequalified
  • 2022-23
    Capacity Information
    Connection/DSR Capacity
    10
    Max Obligation Period
    15
    Unit Information
    CMU Type
    Non CMRS
    Primary Fuel
    Gas
    Category
    Refurbishing Generating CMU
    Storage Facility
    No
    Commercial Information
    Organization
    Company Name
    N/A
    Parent Company
    SEMBCORP ENERGY UK LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    _id
    7816
    CMU ID
    18PR11
    Auction
    Capacity Auction
    Auction Name
    2022-23 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Greengate Power Station
    Name of Applicant
    UK POWER RESERVE LIMITED
    Pre-Qualification Decision
    Prequalified
    Pre-Refurbishing CMU Status
    Opt-In
    Transmission / Distribution
    Distribution
    New Build Yet to Satisfy FCM
    Yes
    CMU confirmed entry into Auction
    No
    Secondary Trading Contact - Email
    [email protected]
    Pre-Refurbishing De-Rated Capacity
    9.514
    Post-Refurbishing De-Rated Capacity
    9.514
    Secondary Trading Contact - Telephone
    '+4401217121970
    Connection Agreement Deferral Declaration
    Yes
    Anticipated Pre-Refurbishing De-Rated Capacity
    9.514
    Anticipated Post-Refurbishing De-Rated Capacity
    9.514
    Auction Participation History
    2022-23T-?2022-23 (T-3) Three Year Ahead Capacity Auction
    Prequalified
    Component ID: 64025
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SP 197 908
    • Location and Post Code: Yearsley Coleshill, Coleshill, Birmingham B46 1JU
    • Generating Technology Class: DSR
    • Description of CMU Components: Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
    CMU BBRK19
    1.022 HC ESS2 LIMITED
    Not Prequalified (2)
  • ✗ Not Prequalified
  • ✗ Not Prequalified
  • 2022-23
    Capacity Information
    De-Rated Capacity
    1.022
    Connection/DSR Capacity
    5
    Anticipated Capacity
    1.022
    Max Obligation Period
    15
    Unit Information
    CMU Type
    Non CMRS
    Primary Fuel
    Storage - Battery
    Category
    New Build Generating CMU
    Storage Facility
    Yes
    Commercial Information
    Organization
    Company Name
    N/A
    Parent Company
    HC ESS2 Holdco Limited
    Opt Out Status
    Opt-In
    Agreement Details
    _id
    9469
    CMU ID
    BBRK19
    Auction
    Capacity Auction
    Auction Name
    2023-24 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Littlebrook C
    Name of Applicant
    HC ESS2 LIMITED
    Pre-Qualification Decision
    Not Prequalified
    Transmission / Distribution
    Distribution
    Secondary Trading Contact - Email
    [email protected]
    Secondary Trading Contact - Telephone
    '+4402039030565
    Auction Participation History
    2022-23T-?2022-23 (T-3) Three Year Ahead Capacity Auction
    Not Prequalified
    Component ID: 149389
    Status: Not Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 510 944
    • Location and Post Code: Greengate Works Power Station, Sutton Heath Road or Burtonhead Road, St Helens, WA9 5DS
    • Generating Technology Class: Reciprocating engines
    • Description of CMU Components: The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
    CMU 20PR11
    9.332 UK POWER RESERVE …
    Prequalified
  • ✓ Prequalified
  • 2022-23
    Capacity Information
    De-Rated Capacity
    9.332
    Connection/DSR Capacity
    9.8
    Anticipated Capacity
    9.332
    Max Obligation Period
    1
    Unit Information
    CMU Type
    Non CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    SEMBCORP ENERGY UK LIMITED
    Registered Holder
    UK POWER RESERVE LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2024-20PR11-001
    Agreement Term
    1
    _id
    10910
    CMU ID
    20PR11
    Auction
    Capacity Auction
    Auction Name
    2024-25 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Greengate Power Station
    Name of Applicant
    UK POWER RESERVE LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2021-04-19
    Auction Acquired Capacity Obligation
    9.332
    Secondary Trading Contact - Telephone
    '+4401217121970
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2024/2025
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2022-23T-42022-23 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 220378
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • Location and Post Code: N/A
    • Generating Technology Class: DSR
    • Description of CMU Components: N/A
    CMU CHIC26
    44.773 SSEPG (OPERATIONS) LIMITED
    Prequalified
  • ✓ Prequalified
  • 2022-23
    Capacity Information
    De-Rated Capacity
    44.773
    Connection/DSR Capacity
    47.04
    Anticipated Capacity
    44.773
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    SSE plc
    Registered Holder
    SSEPG (OPERATIONS) LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2026-CHIC26-001
    Agreement Term
    1
    _id
    13573
    CMU ID
    CHIC26
    Auction
    Capacity Auction
    Auction Name
    2026-27 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Chickerell
    Name of Applicant
    SSEPG (OPERATIONS) LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2023-03-31
    Auction Acquired Capacity Obligation
    44.773
    Secondary Trading Contact - Telephone
    '+441738340483
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2026/2027
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2022-23T-42022-23 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 64017
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 510 944
    • Location and Post Code: Greengate Works Power Station, Sutton Heath Road or Burtonhead Road, St Helens, WA9 5DS
    • Generating Technology Class: Reciprocating engines
    • Description of CMU Components: The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
    CMU DST001
    20.805 E.ON UK PLC
    Prequalified
  • ✓ Prequalified
  • 2022-23
    Capacity Information
    De-Rated Capacity
    20.805
    Connection/DSR Capacity
    24.153
    Anticipated Capacity
    20.805
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Category
    Proven DSR CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Registered Holder
    E.ON UK PLC
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2020-DST001-001
    Obligation Summary
    01/10/2020 - 30/09/2021:20.000 MW
    Agreement Term
    1
    _id
    3934
    CMU ID
    DST001
    Auction
    Capacity Auction
    Auction Name
    2020-21 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    EON026
    Name of Applicant
    E.ON UK PLC
    DSR Bidding Capacity
    20.805
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    Date of Issue of Capacity Agreement
    2020-03-24
    List of Traded Capacity Obligations
    T1: 20.000 MW
    Period for which the transfer applies
    T1: 01/10/2020 - 30/09/2021
    Secondary Trading Contact - Telephone
    '+4407816292478
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2020/2021
    Auction Participation History
    2022-23T-42022-23 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 64016
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ510944
    • Location and Post Code: Greengate Works Power Station, Sutton Heath Road or Burtonhead Road, St Helens, WA9 5DS
    • Generating Technology Class: Reciprocating engines
    • Description of CMU Components: The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
    CMU NDSR37
    10.766 ENEL X UK …
    Prequalified
  • ✓ Prequalified
  • 2021-22
    Capacity Information
    De-Rated Capacity
    10.766
    Connection/DSR Capacity
    12.488
    Anticipated Capacity
    10.757
    Max Obligation Period
    1
    Unit Information
    CMU Type
    Non CMRS
    Category
    Proven DSR CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Registered Holder
    ENEL X UK LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2020-NDSR37-001
    Obligation Summary
    01/10/2020 - 30/09/2021:10.766 MW
    Agreement Term
    1
    _id
    4355
    CMU ID
    NDSR37
    Auction
    Capacity Auction
    Auction Name
    2020-21 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    XDSR37
    Name of Applicant
    ENEL X UK LIMITED
    DSR Bidding Capacity
    10.766
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    Date of Issue of Capacity Agreement
    2020-06-12
    List of Traded Capacity Obligations
    T1: 3.845 MW; T2: 6.921 MW
    Period for which the transfer applies
    T1: 01/10/2020 - 30/09/2021; T2: 01/10/2020 - 30/09/2021
    Secondary Trading Contact - Telephone
    '+4402037954936
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2020/2021
    Auction Participation History
    2021-22T-42021-22 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 278006
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ510944
    • Location and Post Code: Greengate Works Power Station, Sutton Heath Road or Burtonhead Road, St Helens, WA9 5DS
    • Generating Technology Class: OCGT and Reciprocating Engines (Fuel Type - Gas)
    • Description of CMU Components: The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
    2021-22T-42021-22 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 278007
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 510 944
    • Location and Post Code: Greengate Works Power Station, Sutton Heath Road or Burtonhead Road, St Helens, WA9 5DS
    • Generating Technology Class: OCGT and Reciprocating Engines (Fuel Type - Gas)
    • Description of CMU Components: The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
    CMU 17PR11
    SEMBCORP ENERGY UK …
    Prequalified
  • ✓ Prequalified
  • 2021-22
    Capacity Information
    Connection/DSR Capacity
    10
    Max Obligation Period
    15
    Unit Information
    CMU Type
    Non CMRS
    Primary Fuel
    Gas
    Category
    Refurbishing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    SEMBCORP ENERGY UK LIMITED
    Registered Holder
    UK POWER RESERVE LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2021-17PR11-001
    Agreement Term
    1
    _id
    5096
    CMU ID
    17PR11
    Auction
    Capacity Auction
    Auction Name
    2021-22 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Greengate Power Station
    Name of Applicant
    UK POWER RESERVE LIMITED
    Pre-Qualification Decision
    Prequalified
    Pre-Refurbishing CMU Status
    Opt-In
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Pre-Refurbishment Bidding Status
    Pre & Post Refurbishing
    Secondary Trading Contact - Email
    [email protected]
    Pre-Refurbishing De-Rated Capacity
    9.429
    Date of Issue of Capacity Agreement
    2018-03-20
    Post-Refurbishing De-Rated Capacity
    9.481
    Auction Acquired Capacity Obligation
    9.429
    Secondary Trading Contact - Telephone
    '+4401217121970
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2021/2022
    Subject to a Minimum Completion Requirement
    Yes
    Anticipated Pre-Refurbishing De-Rated Capacity
    9.429
    Anticipated Post-Refurbishing De-Rated Capacity
    9.481
    Duration of Capacity Agreement in First Bidding Round
    15
    Auction Participation History
    2021-22T-42021-22 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 278015
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TA 100 319
    • Location and Post Code: West Carr Lane, Hull HU7 0BS, UK
    • Generating Technology Class: DSR
    • Description of CMU Components: Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
    2021-22T-42021-22 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 278016
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SE 325 325
    • Location and Post Code: Newmarket Green, Leeds LS9 0RW, UK
    • Generating Technology Class: DSR
    • Description of CMU Components: Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
    CMU 23PR11
    9.435 UK POWER RESERVE …
    Prequalified
  • ✓ Prequalified
  • 2021-22
    Capacity Information
    De-Rated Capacity
    9.435
    Connection/DSR Capacity
    10
    Anticipated Capacity
    9.435
    Max Obligation Period
    1
    Unit Information
    CMU Type
    Non CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    SEMBCORP ENERGY UK LIMITED
    Registered Holder
    UK POWER RESERVE LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2027-23PR11-001
    Agreement Term
    1
    _id
    14290
    CMU ID
    23PR11
    Auction
    Capacity Auction
    Auction Name
    2027-28 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Greengate Power Station
    Name of Applicant
    UK POWER RESERVE LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2024-04-08
    Auction Acquired Capacity Obligation
    9.435
    Secondary Trading Contact - Telephone
    '+4401217121970
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2027/2028
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2021-22T-42021-22 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 366266
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 346 643
    • Location and Post Code: Airbus UK, Chester Road, Broughton, CH4 0DR
    • Generating Technology Class: CHP and autogeneration
    • Description of CMU Components: 8 Gas-fired CHP units
    CMU 21PR11
    9.145 UK POWER RESERVE …
    Prequalified
  • ✓ Prequalified
  • 2021-22
    Capacity Information
    De-Rated Capacity
    9.145
    Connection/DSR Capacity
    9.579
    Anticipated Capacity
    9.145
    Max Obligation Period
    1
    Unit Information
    CMU Type
    Non CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    SEMBCORP ENERGY UK LIMITED
    Registered Holder
    UK POWER RESERVE LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2025-21PR11-001
    Agreement Term
    1
    _id
    12378
    CMU ID
    21PR11
    Auction
    Capacity Auction
    Auction Name
    2025-26 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Greengate Power Station
    Name of Applicant
    UK POWER RESERVE LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2022-04-01
    Auction Acquired Capacity Obligation
    9.145
    Secondary Trading Contact - Telephone
    '+4401217121970
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2025/2026
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2021-22T-42021-22 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 64135
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SD 893 037
    • Location and Post Code: Gateway Crescent, Oldham, Lancashire, OL9 8AU.
    • Generating Technology Class: Storage
    • Description of CMU Components: The CMU comprises of Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.
    CMU T3PR11
    9.413 UK POWER RESERVE …
    Prequalified
  • ✓ Prequalified
  • 2020-21
    Capacity Information
    De-Rated Capacity
    9.413
    Connection/DSR Capacity
    9.91
    Anticipated Capacity
    18.911
    Max Obligation Period
    1
    Unit Information
    CMU Type
    Non CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    SEMBCORP ENERGY UK LIMITED
    Registered Holder
    UK POWER RESERVE LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2022-T3PR11-001
    Agreement Term
    1
    _id
    7681
    CMU ID
    T3PR11
    Auction
    Capacity Auction
    Auction Name
    2022-23 (T-3) Three Year Ahead Capacity Auction
    CM Unit Name
    Greengate Power Station
    Name of Applicant
    UK POWER RESERVE LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2020-03-11
    Auction Acquired Capacity Obligation
    9.413
    Secondary Trading Contact - Telephone
    '+4401217121970
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2022/2023
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2020-21T-42020-21 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 149398
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: ST 594 545
    • Location and Post Code: BWW019, Coley, Coley Road, Coley, East Harptree, BA3 4PW
    • Description of CMU Components: The CMU Component reduces import demand by turning off equipment and other non-essential loads.
    2020-21T-42020-21 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 149399
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: ST 548 386
    • Location and Post Code: West Pennard, Glastonbury, BA6 8NN
    • Description of CMU Components: The CMU Component reduces import demand by turning off equipment and other non-essential loads.
    CMU STAS18
    15.032 ST ASAPH POWER …
    Prequalified
  • ✓ Prequalified
  • 2020-21
    Capacity Information
    De-Rated Capacity
    15.032
    Connection/DSR Capacity
    15.8
    Anticipated Capacity
    15.222
    Max Obligation Period
    1
    Unit Information
    CMU Type
    Non CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Organization
    Company Name
    N/A
    Parent Company
    THE FERN POWER COMPANY LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    No
    _id
    8761
    CMU ID
    STAS18
    Auction
    Capacity Auction
    Auction Name
    2022-23 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    St Asaph Power
    Name of Applicant
    ST ASAPH POWER LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Secondary Trading Contact - Telephone
    '+4402920547200
    Auction Participation History
    2020-21T-42020-21 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 114094
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 510 944
    • Location and Post Code: Greengate Works Power Station, Sutton Heath Road or Burtonhead Road, St Helens, WA9 5DS
    • Description of CMU Components: The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
    Welcome to Capacity Market Search
    🗺️ 1 week free trial to explore all features!

    You can explore the basic features, but will need to register for continued access to premium features like the interactive map.

    Choose your contribution amount
    Unlimited access to all premium features

    Secure payment • No subscription • Lifetime access