Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help
Capacity Market Search
Menu
Home
  • Technologies
  • Companies
  • Locations
  • Map Explorer
  • FAQ
  • Trading Board
  • ChatGPT

  • Buy Me A Coffee
  • Help

  • Login
  • Register

  • Theme
  • Light
  • Dark
  • Auto
  • Understanding AuctionsSearch ResultsComponent GroupingSortingMap ViewContact Us

    Search Guide

    This registry provides comprehensive search capabilities across all Capacity Market components:

    • Company Search: Enter a company name (e.g., "Drax", "EDF") to see all their components
    • Location Search: Search by city, region, or postcode (e.g., "Manchester", "SW1")
    • CMU ID Search: Enter a specific CMU ID to find exact components
    • Technology Search: Enter technology types like "Hydro", "OCGT", or "Battery"

    The search is intelligent and will try to determine what you're looking for based on your query.

    You can combine search terms to narrow results, such as "London Battery" to find battery storage in London.

    Searches are not case-sensitive, and partial matches are supported (e.g., "Manch" will find "Manchester").

    Understanding Auctions

    The Capacity Market runs regular auctions where providers compete to secure agreements. There are two main types:

    • T-4 auctions: Held 4 years ahead of the delivery year
    • T-1 auctions: Held 1 year ahead to fine-tune capacity requirements

    Each auction results in agreements that specify how much capacity providers must deliver and the payment they'll receive.

    Auction years are displayed as badges (e.g., 2023-24) that you can click to view details for that specific auction year.

    The Capacity Market ensures the UK has sufficient electricity supply during periods of high demand or system stress.

    Providers receive payments for ensuring their capacity is available, creating a more stable and resilient electricity market.

    Search Results

    Search results are grouped by location and show important details about each component:

    • Active Components with auction years 2024-25 or later
    • In-Active Components with only auction years before 2024-25
    • Company Name Click to view all components for this company
    • Technology Click to search for this technology type
    • CMU: XXX Click to search for this CMU ID
    • Auction Year Click to view details for this specific auction

    Each result shows the component's capacity, location details, and participation in specific auction years.

    You can sort results by relevance, location, or date using the sort options.

    Pagination controls appear at the bottom when there are multiple pages of results.

    Component Grouping

    Components at the same location with the same description are grouped together to reduce duplication.

    Each group shows:

    • All CMU IDs for components at that location
    • All auction years, sorted with newest first
    • An Active/Inactive status based on auction years

    Grouping helps identify multi-year contracts and related components at the same site.

    The total capacity shown combines all components in the group.

    Components can be expanded to show individual details by clicking the expand icon.

    Sorting and Filtering

    You can sort search results by:

    • Relevance: Most relevant matches first
    • Location: Alphabetical order by location name
    • Date: By auction year (newest or oldest first)
    • Capacity: Highest or lowest capacity first

    Click the column headers to change sort order.

    You can filter results using the search refinements at the top of the results page:

    • Filter by technology type (e.g., only show batteries)
    • Filter by active status (show only active or inactive components)
    • Filter by auction year (show only components from specific auctions)

    Map Explorer & Map View

    We provide two map-based tools for exploring capacity market data:

    Map Explorer

    The Map Explorer is our advanced interactive mapping tool, specifically designed for comprehensive data exploration with:

    • Mobile-Optimized Interface: Responsive design that works perfectly on phones and tablets
    • Advanced Filtering: Filter by technology type, company, delivery year, and active status
    • Smart Sidebar: Desktop users get a dedicated filter panel, mobile users get collapsible filters
    • Full-Screen Map: Maximizes map space for detailed geographical analysis
    Search Map View

    The Search Map View combines search functionality with map visualization, offering:

    • Search-First Approach: Start with text searches, then visualize results on the map
    • Integrated Results: Search results and map display work together
    • Performance Optimized: Streamlined for fast search result mapping

    Both tools provide a visual representation of capacity distribution across the UK, but serve different exploration needs.

    Map Features:
    • Technology Colors: Different technology types are shown with distinct colors on the map for easy identification:
      GasDSRNuclearCHPSolarWind
      BatteryBiomassHydroInterconnectorCoalOther
    • Technology Legend: The map legend shows all available technologies with their corresponding colors and component counts
    • Search Results on Map: You can view any search results on the map by clicking "View on Map" from search results pages
    • Smart Clustering: Areas with multiple components are automatically grouped into clusters - click clusters to zoom in and see individual components
    • Interactive Markers: Click on individual markers to see detailed information about components at that location

    Use the map controls to zoom in on specific regions or areas of interest. The map automatically adjusts clustering based on your zoom level to provide the clearest view of capacity distribution.

    Contact Us

    We're here to help with any questions about the Capacity Market Registry.

    Email

    For general inquiries and support:

    For LLMs

    Complete programmatic access guide for LLMs:

    Search / All Locations / All Postcodes / WA7 / WA7 4FZ

    Cow Hey Lane, Runcorn, Cheshire, WA7 4FZ

    1120.50 MW
    Total Capacity
    13
    Components
    Prequalified
    Prequalification
    * Latest auction year on record
    Descriptions:
    • A CCGT station consisting of two Alstom GT26A gas turbines, with an Alstom heat recovery steam generator each that produces steam for one ABB steam turbine and is based near Runcorn in Cheshire. Metering of output is Net of auxillary load.
    Trading Contacts:
    ROCKSAVAGE POWER COMPANY, LTD.
    '+4401316246767 [email protected]
    ROCKSAVAGE POWER COMPANY, LTD.
    '+4401316246767
    Other Locations at This Postcode 1 location
    Cow Hey Lane, Runcorn, Cheshire, WA7 4FZ 145.42 MW
    Unknown ROCKSAVAGE POWER COMPANY, LTD.2 components

    CMU Registry Data

    CMU IGRK24
    736.695 ROCKSAVAGE POWER COMPANY, …
    Prequalified
  • ✓ Prequalified
  • 2028-29
    Capacity Information
    De-Rated Capacity
    736.695
    Connection/DSR Capacity
    810
    Anticipated Capacity
    736.695
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    INTERGEN POWER LTD
    Registered Holder
    ROCKSAVAGE POWER COMPANY, LTD.
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2028-IGRK24-001
    Agreement Term
    1
    _id
    15722
    CMU ID
    IGRK24
    Auction
    Capacity Auction
    Auction Name
    2028-29 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Rocksavage
    Name of Applicant
    ROCKSAVAGE POWER COMPANY, LTD.
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    Date of Issue of Capacity Agreement
    2025-04-04
    Auction Acquired Capacity Obligation
    736.695
    Secondary Trading Contact - Telephone
    '+4401316246767
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2028/2029
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2028-29T-42028-29 (T-4) Four Year Ahead Capacity Auction
    736.70 MW Prequalified
    Component ID: 410539
    Capacity: 736.70 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 517 800
    • Location and Post Code: Cow Hey Lane, Runcorn, Cheshire, WA7 4FZ
    • Primary Fuel of Component: Gas
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: A CCGT station consisting of two Alstom GT26A gas turbines, with an Alstom heat recovery steam generator each that produces steam for one ABB steam turbine and is based near Runcorn in Cheshire. Metering of output is Net of auxillary load.
    CMU IGRK23
    741.879 ROCKSAVAGE POWER COMPANY, …
    Prequalified (2)
  • ✓ Prequalified
  • ✓ Prequalified
  • 2027-28 2024-2027
    Capacity Information
    De-Rated Capacity
    741.879
    Connection/DSR Capacity
    810
    Anticipated Capacity
    741.879
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    INTERGEN POWER LTD
    Registered Holder
    ROCKSAVAGE POWER COMPANY, LTD.
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2027-IGRK23-001
    Agreement Term
    1
    _id
    14756
    CMU ID
    IGRK23
    Auction
    Capacity Auction
    Auction Name
    2027-28 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Rocksavage
    Name of Applicant
    ROCKSAVAGE POWER COMPANY, LTD.
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    Date of Issue of Capacity Agreement
    2024-04-08
    Auction Acquired Capacity Obligation
    741.879
    Secondary Trading Contact - Telephone
    '+4401316246767
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2027/2028
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2027-28T-42027-28 (T-4) Four Year Ahead Capacity Auction
    370.94 MW Prequalified
    Component ID: 220090
    Capacity: 370.94 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 517 800
    • Location and Post Code: Cow Hey Lane, Runcorn, Cheshire, WA7 4FZ
    • Primary Fuel of Component: Gas
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: A CCGT station consisting of two Alstom GT26A gas turbines, with an Alstom heat recovery steam generator each that produces steam for one ABB steam turbine and is based near Runcorn in Cheshire. Metering of output is Net of auxillary load.
    2024-25T-12024-25 (T-1) One Year Ahead Capacity Auction
    370.94 MW Prequalified
    Component ID: 375744
    Capacity: 370.94 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 517 800
    • Location and Post Code: Cow Hey Lane, Runcorn, Cheshire, WA7 4FZ
    • Primary Fuel of Component: Gas
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: A CCGT station consisting of two Alstom GT26A gas turbines, with an Alstom heat recovery steam generator each that produces steam for one ABB steam turbine and is based near Runcorn in Cheshire. Metering of output is Net of auxillary load.
    CMU IGRK22
    758.122 ROCKSAVAGE POWER COMPANY, …
    Prequalified
  • ✓ Prequalified
  • 2026-27
    Capacity Information
    De-Rated Capacity
    758.122
    Connection/DSR Capacity
    830
    Anticipated Capacity
    758.122
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    INTERGEN POWER LTD
    Registered Holder
    ROCKSAVAGE POWER COMPANY, LTD.
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2026-IGRK22-001
    Agreement Term
    1
    _id
    13916
    CMU ID
    IGRK22
    Auction
    Capacity Auction
    Auction Name
    2026-27 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Rocksavage
    Name of Applicant
    ROCKSAVAGE POWER COMPANY, LTD.
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2023-03-31
    Auction Acquired Capacity Obligation
    758.122
    Secondary Trading Contact - Telephone
    '+4401316246767
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2026/2027
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2026-27T-42026-27 (T-4) Four Year Ahead Capacity Auction
    758.12 MW Prequalified
    Component ID: 332042
    Capacity: 758.12 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 517 800
    • Location and Post Code: Cow Hey Lane, Runcorn, Cheshire, WA7 4FZ
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: A CCGT station consisting of two Alstom GT26A gas turbines, with an Alstom heat recovery steam generator each that produces steam for one ABB steam turbine and is based near Runcorn in Cheshire. Metering of output is Net of auxillary load.
    CMU IGRK21
    754.636 ROCKSAVAGE POWER COMPANY, …
    Prequalified
  • ✓ Prequalified
  • 2025-26
    Capacity Information
    De-Rated Capacity
    754.636
    Connection/DSR Capacity
    830
    Anticipated Capacity
    754.636
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    INTERGEN POWER LTD
    Registered Holder
    ROCKSAVAGE POWER COMPANY, LTD.
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2025-IGRK21-001
    Agreement Term
    1
    _id
    13052
    CMU ID
    IGRK21
    Auction
    Capacity Auction
    Auction Name
    2025-26 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Rocksavage
    Name of Applicant
    ROCKSAVAGE POWER COMPANY, LTD.
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2022-04-01
    Auction Acquired Capacity Obligation
    754.636
    Secondary Trading Contact - Telephone
    '+4401316246767
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2025/2026
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2025-26T-42025-26 (T-4) Four Year Ahead Capacity Auction
    754.64 MW Prequalified
    Component ID: 184942
    Capacity: 754.64 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 517 800
    • Location and Post Code: Cow Hey Lane, Runcorn, Cheshire, WA7 4FZ
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: A CCGT station consisting of two Alstom GT26A gas turbines, with an Alstom heat recovery steam generator each that produces steam for one ABB steam turbine and is based near Runcorn in Cheshire. Metering of output is Net of auxillary load.
    CMU IGRK20
    747 ROCKSAVAGE POWER COMPANY, …
    Prequalified
  • ✓ Prequalified
  • 2024-25
    Capacity Information
    De-Rated Capacity
    747
    Connection/DSR Capacity
    830
    Anticipated Capacity
    747
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Organization
    Company Name
    N/A
    Parent Company
    INTERGEN POWER LTD
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    No
    _id
    11525
    CMU ID
    IGRK20
    Auction
    Capacity Auction
    Auction Name
    2024-25 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Rocksavage
    Name of Applicant
    ROCKSAVAGE POWER COMPANY, LTD.
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Secondary Trading Contact - Telephone
    '+4401316246767
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2024-25T-42024-25 (T-4) Four Year Ahead Capacity Auction
    747.00 MW Prequalified
    Component ID: 51419
    Capacity: 747.00 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 517 800
    • Location and Post Code: Cow Hey Lane, Runcorn, Cheshire, WA7 4FZ
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: A CCGT station consisting of two Alstom GT26A gas turbines, with an Alstom heat recovery steam generator each that produces steam for one ABB steam turbine and is based near Runcorn in Cheshire. Metering of output is Net of auxillary load.
    CMU IGRK19
    747 ROCKSAVAGE POWER COMPANY, …
    Prequalified (2)
  • ✓ Prequalified
  • ✓ Prequalified
  • 2023-24 2022-2023
    Capacity Information
    De-Rated Capacity
    747
    Connection/DSR Capacity
    830
    Anticipated Capacity
    747
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    INTERGEN POWER LTD
    Registered Holder
    ROCKSAVAGE POWER COMPANY, LTD.
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2023-IGRK19-001
    Agreement Term
    1
    _id
    9949
    CMU ID
    IGRK19
    Auction
    Capacity Auction
    Auction Name
    2023-24 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Rocksavage
    Name of Applicant
    ROCKSAVAGE POWER COMPANY, LTD.
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    Nature of the Security Interest
    1. Floating charge pursuant to a security agreement dated 17 September 2024 and made between Rocksavage Power Company, Ltd. and Macquarie Bank Limited (London Branch)
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2020-04-17
    Auction Acquired Capacity Obligation
    747
    Secondary Trading Contact - Telephone
    '+4401316246767
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2023/2024
    Legal Name of any Person with a Security Interest
    1. Macquarie Bank Limited (London Branch)
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2023-24T-42023-24 (T-4) Four Year Ahead Capacity Auction
    373.50 MW Prequalified
    Component ID: 282814
    Capacity: 373.50 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 517 800
    • Location and Post Code: Cow Hey Lane, Runcorn, Cheshire, WA7 4FZ
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: A CCGT station consisting of two Alstom GT26A gas turbines, with an Alstom heat recovery steam generator each that produces steam for one ABB steam turbine and is based near Runcorn in Cheshire. Metering of output is Net of auxillary load.
    2022-23T-?2022-23 (T-3) Three Year Ahead Capacity Auction
    373.50 MW Prequalified
    Component ID: 135
    Capacity: 373.50 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 517 800
    • Location and Post Code: Cow Hey Lane, Runcorn, Cheshire, WA7 4FZ
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: A CCGT station consisting of two Alstom GT26A gas turbines, with an Alstom heat recovery steam generator each that produces steam for one ABB steam turbine and is based near Runcorn in Cheshire. Metering of output is Net of auxillary load.
    CMU IGRK18
    747 ROCKSAVAGE POWER COMPANY, …
    Prequalified
  • ✓ Prequalified
  • 2022-23
    Capacity Information
    De-Rated Capacity
    747
    Connection/DSR Capacity
    830
    Anticipated Capacity
    747
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Organization
    Company Name
    N/A
    Parent Company
    INTERGEN POWER LTD
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    No
    _id
    8392
    CMU ID
    IGRK18
    Auction
    Capacity Auction
    Auction Name
    2022-23 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Rocksavage
    Name of Applicant
    ROCKSAVAGE POWER COMPANY, LTD.
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Secondary Trading Contact - Telephone
    '+4401316246767
    Auction Participation History
    2022-23T-42022-23 (T-4) Four Year Ahead Capacity Auction
    747.00 MW Prequalified
    Component ID: 114709
    Capacity: 747.00 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 517 800
    • Location and Post Code: Cow Hey Lane, Runcorn, Cheshire, WA7 4FZ
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: A CCGT station consisting of two Alstom GT26A gas turbines, with an Alstom heat recovery steam generator each that produces steam for one ABB steam turbine and is based near Runcorn in Cheshire. Metering of output is Net of auxillary load.
    CMU IGRK17
    747 ROCKSAVAGE POWER COMPANY, …
    Prequalified
  • ✓ Prequalified
  • 2021-22
    Capacity Information
    De-Rated Capacity
    747
    Connection/DSR Capacity
    830
    Anticipated Capacity
    747
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    INTERGEN POWER LTD
    Registered Holder
    ROCKSAVAGE POWER COMPANY, LTD.
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2021-IGRK17-001
    Agreement Term
    1
    _id
    5753
    CMU ID
    IGRK17
    Auction
    Capacity Auction
    Auction Name
    2021-22 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Rocksavage
    Name of Applicant
    ROCKSAVAGE POWER COMPANY, LTD.
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2018-03-20
    Auction Acquired Capacity Obligation
    747
    Secondary Trading Contact - Telephone
    '+4401316246767
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2021/2022
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2021-22T-42021-22 (T-4) Four Year Ahead Capacity Auction
    747.00 MW Prequalified
    Component ID: 332166
    Capacity: 747.00 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 517 800
    • Location and Post Code: Cow Hey Lane, Runcorn, Cheshire, WA7 4FZ
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: A CCGT station consisting of two Alstom GT26A gas turbines, with an Alstom heat recovery steam generator each that produces steam for one ABB steam turbine and is based near Runcorn in Cheshire. Metering of output is Net of auxillary load.
    CMU IGROCK
    747 ROCKSAVAGE POWER COMPANY, …
    Prequalified (2)
  • ✓ Prequalified
  • ✓ Prequalified
  • 2020-21 2017-2020
    Capacity Information
    De-Rated Capacity
    747
    Connection/DSR Capacity
    830
    Anticipated Capacity
    747
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Registered Holder
    ROCKSAVAGE POWER COMPANY, LTD.
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2020-IGROCK-001
    Agreement Term
    1
    _id
    4215
    CMU ID
    IGROCK
    Auction
    Capacity Auction
    Auction Name
    2020-21 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Rocksavage
    Name of Applicant
    ROCKSAVAGE POWER COMPANY, LTD.
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Date of Issue of Capacity Agreement
    2017-01-20
    Auction Acquired Capacity Obligation
    747
    Secondary Trading Contact - Telephone
    '+4401316246767
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2020/2021
    Auction Participation History
    2020-21T-42020-21 (T-4) Four Year Ahead Capacity Auction
    145.42 MW Prequalified
    Component ID: 220395
    Capacity: 145.42 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 517 800
    • Location and Post Code: Cow Hey Lane, Runcorn, Cheshire, WA7 4FZ
    • Description of CMU Components: A CCGT station consisting of two Alstom GT26A gas turbines, with an Alstom heat recovery steam generator each that produces steam for one ABB steam turbine and is based near Runcorn in Cheshire. Metering of output is Net of auxillary load.
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction
    145.42 MW Prequalified
    Component ID: 611258
    Capacity: 145.42 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 517 800
    • Location and Post Code: Cow Hey Lane, Runcorn, Cheshire, WA7 4FZ
    • Description of CMU Components: A CCGT station consisting of two Alstom GT26A gas turbines, with an Alstom heat recovery steam generator each that produces steam for one ABB steam turbine and is based near Runcorn in Cheshire. Metering of output is Net of auxillary load.
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction
    145.42 MW Prequalified
    Component ID: 562500
    Capacity: 145.42 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 517 800
    • Location and Post Code: Cow Hey Lane, Runcorn, Cheshire, WA7 4FZ
    • Description of CMU Components: A CCGT station consisting of two Alstom GT26A gas turbines, with an Alstom heat recovery steam generator each that produces steam for one ABB steam turbine and is based near Runcorn in Cheshire. Metering of output is Net of auxillary load.
    Welcome to Capacity Market Search
    🗺️ 1 week free trial to explore all features!

    You can explore the basic features, but will need to register for continued access to premium features like the interactive map.

    Choose your contribution amount
    Unlimited access to all premium features

    Secure payment • No subscription • Lifetime access