10 unique locations (54 components)

Corringham, Stanford-le-Hope, Essex SS17 9LP UK (2 components)

A new combined cycle power station comprising the latest technology gas turbine(s), heat recovery steam generator(s), steam turbine(s) and associated balance of plant. This will be constructed on brownfield land … (2)

Inactive • 2021-22 (T-4), 2020-21 (T-4)
Land at Stanhope Industrial Estate, Wharf Road, Standford-Le-Hope SS17 0EH (16 components)
• 10 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Stanford le-hope
• A new build, gas fuelled generation plant with ancillary equipment.
• A new build, gas fuelled generation station
Active • 2027-28 (T-4), 2026-27 (T-4) ...
59.99 MW
Land South Of Marsh Farm Marsh Lane Fobbing Essex SS17 9JW (1 component)

A 49.400 MW / 98.800 MWh battery energy storage system

Active • 2026-27 (T-4)
11.67 MW
Linford Blocks, Buckingham Hill Rd, Linford, Stanford-le-Hope SS17 0PY (3 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
Thames Enterprise Park, Corringham, Stanford-Le-Hope, SS17 9LL (1 component)

Energy from Waste facility

Active • 2024-25 (T-4)
The Manor Way, Stanford-le-Hope, Essex, SS17 9GN (11 components)

A CCGT station consisting of two Alstom GT26 gas turbines and a steam turbine and is based near Stanford-le-hope in Essex, England. Each turbine is individually metered with output being … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
2191.04 MW
The Manorway, Stanford-le-Hope, Essex SS17 9LL (1 component)

Reciprocating engines

Inactive • 2020-21 (T-4)
The Manorway, Stanford-le-Hope, Essex SS17 9LP (11 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is … (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
30.72 MW
The Manorway, Stanford-le-Hope, SS17 9LL (3 components)
• A Battery Energy Storage System (2)
• Reciprocating engines of 6 mW.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.74 MW
The Manorway, Stanford-leHope, SS17 9LL (5 components)
• A gas fuelled generating station (2)
• A Battery Energy Storage System
Active • 2025-26 (T-4), 2024-25 (T-1)