Home Technologies Companies Locations Map Explorer FAQ ChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Home Technologies Companies Locations Map Explorer FAQ ChatGPT Help
Capacity Market Search
Menu
Home
  • Technologies
  • Companies
  • Locations
  • Map Explorer
  • FAQ
  • ChatGPT

  • Help

  • Login
  • Register

  • Theme
  • Light
  • Dark
  • Auto
  • Understanding AuctionsSearch ResultsComponent GroupingSortingMap ViewContact Us

    Search Guide

    This registry provides comprehensive search capabilities across all Capacity Market components:

    • Company Search: Enter a company name (e.g., "Drax", "EDF") to see all their components
    • Location Search: Search by city, region, or postcode (e.g., "Manchester", "SW1")
    • CMU ID Search: Enter a specific CMU ID to find exact components
    • Technology Search: Enter technology types like "Hydro", "OCGT", or "Battery"

    The search is intelligent and will try to determine what you're looking for based on your query.

    You can combine search terms to narrow results, such as "London Battery" to find battery storage in London.

    Searches are not case-sensitive, and partial matches are supported (e.g., "Manch" will find "Manchester").

    Understanding Auctions

    The Capacity Market runs regular auctions where providers compete to secure agreements. There are two main types:

    • T-4 auctions: Held 4 years ahead of the delivery year
    • T-1 auctions: Held 1 year ahead to fine-tune capacity requirements

    Each auction results in agreements that specify how much capacity providers must deliver and the payment they'll receive.

    Auction years are displayed as badges (e.g., 2023-24) that you can click to view details for that specific auction year.

    The Capacity Market ensures the UK has sufficient electricity supply during periods of high demand or system stress.

    Providers receive payments for ensuring their capacity is available, creating a more stable and resilient electricity market.

    Search Results

    Search results are grouped by location and show important details about each component:

    • Active Components with auction years 2024-25 or later
    • In-Active Components with only auction years before 2024-25
    • Company Name Click to view all components for this company
    • Technology Click to search for this technology type
    • CMU: XXX Click to search for this CMU ID
    • Auction Year Click to view details for this specific auction

    Each result shows the component's capacity, location details, and participation in specific auction years.

    You can sort results by relevance, location, or date using the sort options.

    Pagination controls appear at the bottom when there are multiple pages of results.

    Component Grouping

    Components at the same location with the same description are grouped together to reduce duplication.

    Each group shows:

    • All CMU IDs for components at that location
    • All auction years, sorted with newest first
    • An Active/Inactive status based on auction years

    Grouping helps identify multi-year contracts and related components at the same site.

    The total capacity shown combines all components in the group.

    Components can be expanded to show individual details by clicking the expand icon.

    Sorting and Filtering

    You can sort search results by:

    • Relevance: Most relevant matches first
    • Location: Alphabetical order by location name
    • Date: By auction year (newest or oldest first)
    • Capacity: Highest or lowest capacity first

    Click the column headers to change sort order.

    You can filter results using the search refinements at the top of the results page:

    • Filter by technology type (e.g., only show batteries)
    • Filter by active status (show only active or inactive components)
    • Filter by auction year (show only components from specific auctions)

    Map Explorer & Map View

    We provide two map-based tools for exploring capacity market data:

    Map Explorer

    The Map Explorer is our advanced interactive mapping tool, specifically designed for comprehensive data exploration with:

    • Mobile-Optimized Interface: Responsive design that works perfectly on phones and tablets
    • Advanced Filtering: Filter by technology type, company, delivery year, and active status
    • Smart Sidebar: Desktop users get a dedicated filter panel, mobile users get collapsible filters
    • Full-Screen Map: Maximizes map space for detailed geographical analysis
    Search Map View

    The Search Map View combines search functionality with map visualization, offering:

    • Search-First Approach: Start with text searches, then visualize results on the map
    • Integrated Results: Search results and map display work together
    • Performance Optimized: Streamlined for fast search result mapping

    Both tools provide a visual representation of capacity distribution across the UK, but serve different exploration needs.

    Map Features:
    • Technology Colors: Different technology types are shown with distinct colors on the map for easy identification:
      GasDSRNuclearCHPSolarWind
      BatteryBiomassHydroInterconnectorCoalOther
    • Technology Legend: The map legend shows all available technologies with their corresponding colors and component counts
    • Search Results on Map: You can view any search results on the map by clicking "View on Map" from search results pages
    • Smart Clustering: Areas with multiple components are automatically grouped into clusters - click clusters to zoom in and see individual components
    • Interactive Markers: Click on individual markers to see detailed information about components at that location

    Use the map controls to zoom in on specific regions or areas of interest. The map automatically adjusts clustering based on your zoom level to provide the clearest view of capacity distribution.

    Contact Us

    We're here to help with any questions about the Capacity Market Registry.

    Email

    For general inquiries and support:

    For LLMs

    Complete programmatic access guide for LLMs:

    Search / All Locations / All Postcodes / SN3 / SN3 4TZ

    The Site will be on the premises of Honda of the UK Manufacturing Limited (?Honda UK") located at Highworth Road, South Marston, Swindon, Wiltshire, SN3 4TZ.

    No capacity
    Total Capacity
    SN3 4TZ
    Postcode
    1
    Component
    Inactive
    No current auctions
    Rejected
    Prequalification
    * Latest auction year on record
    CMUs:TEPNGK
    No technology data
    Descriptions:
    • The Consortium (TEPCO and NGK) will provide the service from a Sodium Sulfur (NAS®) battery system with Power Conversion System (PCS) (rated capacity: 10MW (short-time rating: 11MW) /60MWh) and control system which will be fully commissioned by TEPCO and NGK. The system can be configured to provide two alternative service arrangements. One is to provide Balancing Services of Enhanced or Firm Frequency Response as well as an energy delivery service for Capacity Market, and the other is to provide triad avoidance service to its customer (Honda) during the time except service period of Frequency Response Services in Winter. The NAS battery is commercially produced by NGK and more than 530 MW and 3700 MWh have been installed globally. The NAS battery has been used by more than 190 customers and has been used in similar applications in many installations. The assets comprise 10MW (short-time rating: 11 MW)/60MWh of battery modules, which will be packaged in bespoke shipping containers with built-in battery management system, connected to a system controller and a power conversion system. The assets are connected to the 33 kV network connection through an existing connection on the premises of Honda of the UK Manufacturing Limited. of approximately 4500 m2 required for minimum ground works. In accordance with the terms of the Capacity Market Rules, if the Applicant?s Bid is successful then the Applicant will incorporate a special purpose vehicle company (to be incorporated in England and Wales) (?JVCO?), and the Applicant intends, subject to the approval of EMR Delivery Body, for the Capacity Market Contract to be entered into between EMR Delivering Body and JVCO.

    CMU Registry Data

    CMU TEPNGK
    NGK INSULATORS, LTD.
    Rejected
  • ✗ Rejected
  • 2020-21
    Capacity Information
    Anticipated Capacity
    10.592
    Unit Information
    CMU Type
    Non CMRS
    Category
    New Build Generating CMU
    Storage Facility
    Yes
    Commercial Information
    Organization
    Name of Applicant
    Company Name
    N/A
    Opt Out Status
    Opt-In
    Agreement Details
    _id
    4589
    CMU ID
    TEPNGK
    Auction
    Capacity Auction
    Auction Name
    2020-21 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Prelude
    Name of Applicant
    NGK INSULATORS, LTD.
    Pre-Qualification Decision
    Rejected
    Transmission / Distribution
    Distribution
    Auction Participation History
    2020-21T-42020-21 (T-4) Four Year Ahead Capacity Auction
    Rejected
    Component ID:Not available
    View Details: Location Page
    Status: Rejected
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SU 181 883
    • Location and Post Code: The Site will be on the premises of Honda of the UK Manufacturing Limited (?Honda UK") located at Highworth Road, South Marston, Swindon, Wiltshire, SN3 4TZ.
    • Description of CMU Components: The Consortium (TEPCO and NGK) will provide the service from a Sodium Sulfur (NAS®) battery system with Power Conversion System (PCS) (rated capacity: 10MW (short-time rating: 11MW) /60MWh) and control system which will be fully commissioned by TEPCO and NGK. The system can be configured to provide two alternative service arrangements. One is to provide Balancing Services of Enhanced or Firm Frequency Response as well as an energy delivery service for Capacity Market, and the other is to provide triad avoidance service to its customer (Honda) during the time except service period of Frequency Response Services in Winter. The NAS battery is commercially produced by NGK and more than 530 MW and 3700 MWh have been installed globally. The NAS battery has been used by more than 190 customers and has been used in similar applications in many installations. The assets comprise 10MW (short-time rating: 11 MW)/60MWh of battery modules, which will be packaged in bespoke shipping containers with built-in battery management system, connected to a system controller and a power conversion system. The assets are connected to the 33 kV network connection through an existing connection on the premises of Honda of the UK Manufacturing Limited. of approximately 4500 m2 required for minimum ground works. In accordance with the terms of the Capacity Market Rules, if the Applicant?s Bid is successful then the Applicant will incorporate a special purpose vehicle company (to be incorporated in England and Wales) (?JVCO?), and the Applicant intends, subject to the approval of EMR Delivery Body, for the Capacity Market Contract to be entered into between EMR Delivering Body and JVCO.
    Welcome to Capacity Market Search
    🗺️ 1 week free trial to explore all features!

    You can explore the basic features, but will need to register for continued access to premium features like the interactive map.

    Choose your contribution amount
    Unlimited access to all premium features

    Secure payment • No subscription • Lifetime access