Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help
Capacity Market Search
Menu
Home
  • Technologies
  • Companies
  • Locations
  • Map Explorer
  • FAQ
  • Trading Board
  • ChatGPT

  • Buy Me A Coffee
  • Help

  • Login
  • Register

  • Theme
  • Light
  • Dark
  • Auto
  • Understanding AuctionsSearch ResultsComponent GroupingSortingMap ViewContact Us

    Search Guide

    This registry provides comprehensive search capabilities across all Capacity Market components:

    • Company Search: Enter a company name (e.g., "Drax", "EDF") to see all their components
    • Location Search: Search by city, region, or postcode (e.g., "Manchester", "SW1")
    • CMU ID Search: Enter a specific CMU ID to find exact components
    • Technology Search: Enter technology types like "Hydro", "OCGT", or "Battery"

    The search is intelligent and will try to determine what you're looking for based on your query.

    You can combine search terms to narrow results, such as "London Battery" to find battery storage in London.

    Searches are not case-sensitive, and partial matches are supported (e.g., "Manch" will find "Manchester").

    Understanding Auctions

    The Capacity Market runs regular auctions where providers compete to secure agreements. There are two main types:

    • T-4 auctions: Held 4 years ahead of the delivery year
    • T-1 auctions: Held 1 year ahead to fine-tune capacity requirements

    Each auction results in agreements that specify how much capacity providers must deliver and the payment they'll receive.

    Auction years are displayed as badges (e.g., 2023-24) that you can click to view details for that specific auction year.

    The Capacity Market ensures the UK has sufficient electricity supply during periods of high demand or system stress.

    Providers receive payments for ensuring their capacity is available, creating a more stable and resilient electricity market.

    Search Results

    Search results are grouped by location and show important details about each component:

    • Active Components with auction years 2024-25 or later
    • In-Active Components with only auction years before 2024-25
    • Company Name Click to view all components for this company
    • Technology Click to search for this technology type
    • CMU: XXX Click to search for this CMU ID
    • Auction Year Click to view details for this specific auction

    Each result shows the component's capacity, location details, and participation in specific auction years.

    You can sort results by relevance, location, or date using the sort options.

    Pagination controls appear at the bottom when there are multiple pages of results.

    Component Grouping

    Components at the same location with the same description are grouped together to reduce duplication.

    Each group shows:

    • All CMU IDs for components at that location
    • All auction years, sorted with newest first
    • An Active/Inactive status based on auction years

    Grouping helps identify multi-year contracts and related components at the same site.

    The total capacity shown combines all components in the group.

    Components can be expanded to show individual details by clicking the expand icon.

    Sorting and Filtering

    You can sort search results by:

    • Relevance: Most relevant matches first
    • Location: Alphabetical order by location name
    • Date: By auction year (newest or oldest first)
    • Capacity: Highest or lowest capacity first

    Click the column headers to change sort order.

    You can filter results using the search refinements at the top of the results page:

    • Filter by technology type (e.g., only show batteries)
    • Filter by active status (show only active or inactive components)
    • Filter by auction year (show only components from specific auctions)

    Map Explorer & Map View

    We provide two map-based tools for exploring capacity market data:

    Map Explorer

    The Map Explorer is our advanced interactive mapping tool, specifically designed for comprehensive data exploration with:

    • Mobile-Optimized Interface: Responsive design that works perfectly on phones and tablets
    • Advanced Filtering: Filter by technology type, company, delivery year, and active status
    • Smart Sidebar: Desktop users get a dedicated filter panel, mobile users get collapsible filters
    • Full-Screen Map: Maximizes map space for detailed geographical analysis
    Search Map View

    The Search Map View combines search functionality with map visualization, offering:

    • Search-First Approach: Start with text searches, then visualize results on the map
    • Integrated Results: Search results and map display work together
    • Performance Optimized: Streamlined for fast search result mapping

    Both tools provide a visual representation of capacity distribution across the UK, but serve different exploration needs.

    Map Features:
    • Technology Colors: Different technology types are shown with distinct colors on the map for easy identification:
      GasDSRNuclearCHPSolarWind
      BatteryBiomassHydroInterconnectorCoalOther
    • Technology Legend: The map legend shows all available technologies with their corresponding colors and component counts
    • Search Results on Map: You can view any search results on the map by clicking "View on Map" from search results pages
    • Smart Clustering: Areas with multiple components are automatically grouped into clusters - click clusters to zoom in and see individual components
    • Interactive Markers: Click on individual markers to see detailed information about components at that location

    Use the map controls to zoom in on specific regions or areas of interest. The map automatically adjusts clustering based on your zoom level to provide the clearest view of capacity distribution.

    Contact Us

    We're here to help with any questions about the Capacity Market Registry.

    Email

    For general inquiries and support:

    For LLMs

    Complete programmatic access guide for LLMs:

    Search / All Locations / All Postcodes / SG15 / SG15 6RF

    Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6RF

    16.96 MW (Est from CMU)
    Total Capacity
    SG15 6RF
    Postcode
    15
    Components
    Active*
    2024-25
    Prequalified
    Prequalification
    * Latest auction year on record
    Descriptions:
    • Gas reciprocating engines
    • Gas reciprocating engines
    • Gas reciprocating engines
    Trading Contacts:
    Other Locations at This Postcode 2 locations
    Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6RF 2.52 MW (Est from CMU)
    Reciprocating engines ALKANE ENERGY UK LIMITED3 components
    Arlesey Landfill Site, Mill Lane, Arlesey, Bedfordshire, SG15 6RF 3.07 MW
    Reciprocating engines ALKANE ENERGY UK LIMITED2 components

    CMU Registry Data

    CMU A3ARLS
    1.912 ALKANE ENERGY UK …
    Prequalified (2)
  • ✓ Prequalified
  • ✓ Prequalified
  • 2027-28 2026-2027
    Capacity Information
    De-Rated Capacity
    1.912
    Connection/DSR Capacity
    2.026
    Anticipated Capacity
    1.912
    Max Obligation Period
    1
    Unit Information
    CMU Type
    Non CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    Alkane Energy Limited
    Registered Holder
    ALKANE ENERGY UK LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2027-A3ARLS-001
    Agreement Term
    1
    _id
    14310
    CMU ID
    A3ARLS
    Auction
    Capacity Auction
    Auction Name
    2027-28 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Arlesey
    Name of Applicant
    ALKANE ENERGY UK LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    Date of Issue of Capacity Agreement
    2024-04-08
    Auction Acquired Capacity Obligation
    1.912
    Secondary Trading Contact - Telephone
    '+4401604662400
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2027/2028
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2027-28T-42027-28 (T-4) Four Year Ahead Capacity Auction
    1.91 MW Prequalified
    Component ID: 63914
    Capacity: 1.91 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TL 188 352
    • Location and Post Code: Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6RF
    • Primary Fuel of Component: Gas
    • Generating Technology Class: Reciprocating engines
    • Description of CMU Components: Gas reciprocating engines
    2026-27T-42026-27 (T-4) Four Year Ahead Capacity Auction
    1.93 MW Prequalified
    Component ID: 220248
    Capacity: 1.93 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • De-Rated Capacity: 1.928
    • OS Grid Reference: TL 188 352
    • Location and Post Code: Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6RF
    • Generating Technology Class: Reciprocating engines
    • Description of CMU Components: Gas reciprocating engines
    CMU A5AVAR
    1.981 ALKANE ENERGY UK …
    Prequalified (2)
  • ✓ Prequalified
  • ✓ Prequalified
  • 2027-28 2024-2027
    Capacity Information
    De-Rated Capacity
    1.981
    Connection/DSR Capacity
    2.1
    Anticipated Capacity
    1.981
    Max Obligation Period
    1
    Unit Information
    CMU Type
    Non CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    Alkane Energy Limited
    Registered Holder
    ALKANE ENERGY UK LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2027-A5AVAR-001
    Agreement Term
    1
    _id
    14315
    CMU ID
    A5AVAR
    Auction
    Capacity Auction
    Auction Name
    2027-28 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Arls6 Avel13
    Name of Applicant
    ALKANE ENERGY UK LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    Date of Issue of Capacity Agreement
    2024-04-08
    Auction Acquired Capacity Obligation
    1.981
    Secondary Trading Contact - Telephone
    '+4401604662400
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2027/2028
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2027-28T-42027-28 (T-4) Four Year Ahead Capacity Auction
    1.06 MW Prequalified
    Component ID: 54809
    Capacity: 1.06 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • De-Rated Capacity: 1.061
    • OS Grid Reference: TL 188 352
    • Location and Post Code: Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6RF
    • Connection / DSR Capacity: 1.125
    • Primary Fuel of Component: Gas
    • Generating Technology Class: Reciprocating engines
    • Description of CMU Components: Gas reciprocating engines
    2024-25T-12024-25 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 63979
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • De-Rated Capacity: 1.061
    • OS Grid Reference: TL 188 352
    • Location and Post Code: Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6RF
    • Connection / DSR Capacity: 1.125
    • Primary Fuel of Component: Gas
    • Generating Technology Class: Reciprocating engines
    • Description of CMU Components: Gas reciprocating engines
    CMU A3AVAR
    1.999 ALKANE ENERGY UK …
    Prequalified
  • ✓ Prequalified
  • 2026-27
    Capacity Information
    De-Rated Capacity
    1.999
    Connection/DSR Capacity
    2.1
    Anticipated Capacity
    1.999
    Max Obligation Period
    1
    Unit Information
    CMU Type
    Non CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    Alkane Energy Limited
    Registered Holder
    ALKANE ENERGY UK LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2026-A3AVAR-001
    Agreement Term
    1
    _id
    13461
    CMU ID
    A3AVAR
    Auction
    Capacity Auction
    Auction Name
    2026-27 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Arls6 Avel13
    Name of Applicant
    ALKANE ENERGY UK LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2023-03-31
    Auction Acquired Capacity Obligation
    1.999
    Secondary Trading Contact - Telephone
    '+4401604662400
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2026/2027
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2026-27T-42026-27 (T-4) Four Year Ahead Capacity Auction
    1.07 MW Prequalified
    Component ID: 63538
    Capacity: 1.07 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • De-Rated Capacity: 1.068
    • OS Grid Reference: TL 188 352
    • Location and Post Code: Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6RF
    • Connection / DSR Capacity: 1.122
    • Generating Technology Class: Reciprocating engines
    • Description of CMU Components: Gas reciprocating engines
    CMU A1AVAR
    2.005 ALKANE ENERGY UK …
    Prequalified
  • ✓ Prequalified
  • 2025-26
    Capacity Information
    De-Rated Capacity
    2.005
    Connection/DSR Capacity
    2.1
    Anticipated Capacity
    2.005
    Max Obligation Period
    1
    Unit Information
    CMU Type
    Non CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    Alkane Energy Limited
    Registered Holder
    ALKANE ENERGY UK LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2025-A1AVAR-001
    Agreement Term
    1
    _id
    12420
    CMU ID
    A1AVAR
    Auction
    Capacity Auction
    Auction Name
    2025-26 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Arls6 Avel13
    Name of Applicant
    ALKANE ENERGY UK LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2022-04-01
    Auction Acquired Capacity Obligation
    2.005
    Secondary Trading Contact - Telephone
    '+4401604662400
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2025/2026
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2025-26T-42025-26 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 149337
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TL 188 352
    • Location and Post Code: Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6RF
    • Generating Technology Class: Reciprocating engines
    • Description of CMU Components: Gas reciprocating engines
    CMU A2ARLS
    1.792 ALKANE ENERGY UK …
    Prequalified
  • ✓ Prequalified
  • 2025-26
    Capacity Information
    De-Rated Capacity
    1.792
    Connection/DSR Capacity
    1.877
    Anticipated Capacity
    1.792
    Max Obligation Period
    1
    Unit Information
    CMU Type
    Non CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    Alkane Energy Limited
    Registered Holder
    ALKANE ENERGY UK LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2025-A2ARLS-001
    Agreement Term
    1
    _id
    12439
    CMU ID
    A2ARLS
    Auction
    Capacity Auction
    Auction Name
    2025-26 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Arlesey
    Name of Applicant
    ALKANE ENERGY UK LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2022-04-01
    Auction Acquired Capacity Obligation
    1.792
    Secondary Trading Contact - Telephone
    '+4401604662400
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2025/2026
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2025-26T-42025-26 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 281904
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TL 188 352
    • Location and Post Code: Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6RF
    • Generating Technology Class: Reciprocating engines
    • Description of CMU Components: Gas reciprocating engines
    CMU A1ARLS
    1.787 ALKANE ENERGY UK …
    Prequalified
  • ✓ Prequalified
  • 2024-25
    Capacity Information
    De-Rated Capacity
    1.787
    Connection/DSR Capacity
    1.877
    Anticipated Capacity
    1.787
    Max Obligation Period
    1
    Unit Information
    CMU Type
    Non CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    Alkane Energy Limited
    Registered Holder
    ALKANE ENERGY UK LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2024-A1ARLS-001
    Agreement Term
    1
    _id
    10957
    CMU ID
    A1ARLS
    Auction
    Capacity Auction
    Auction Name
    2024-25 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Arlesey
    Name of Applicant
    ALKANE ENERGY UK LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2021-04-19
    Auction Acquired Capacity Obligation
    1.787
    Secondary Trading Contact - Telephone
    '+4401604662400
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2024/2025
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2024-25T-42024-25 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 282883
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TL 188 352
    • Location and Post Code: Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6RF
    • Generating Technology Class: Reciprocating engines
    • Description of CMU Components: Gas reciprocating engines
    CMU A4AVAR
    1.999 ALKANE ENERGY UK …
    Prequalified
  • ✓ Prequalified
  • 2023-24
    Capacity Information
    De-Rated Capacity
    1.999
    Connection/DSR Capacity
    2.1
    Anticipated Capacity
    1.999
    Max Obligation Period
    1
    Unit Information
    CMU Type
    Non CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    Alkane Energy Limited
    Registered Holder
    ALKANE ENERGY UK LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2023-A4AVAR-001
    Agreement Term
    1
    _id
    8953
    CMU ID
    A4AVAR
    Auction
    Capacity Auction
    Auction Name
    2023-24 (T-1) One Year Ahead Capacity Auction
    CM Unit Name
    Arls6 Avel13
    Name of Applicant
    ALKANE ENERGY UK LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2023-03-24
    Auction Acquired Capacity Obligation
    1.999
    Secondary Trading Contact - Telephone
    '+4401604662400
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2023/2024
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2023-24T-12023-24 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 566075
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • De-Rated Capacity: 1.068
    • OS Grid Reference: TL 188 352
    • Location and Post Code: Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6RF
    • Connection / DSR Capacity: 1.122
    • Generating Technology Class: Reciprocating engines
    • Description of CMU Components: Gas reciprocating engines
    2023-24T-12023-24 (T-1) One Year Ahead Capacity Auction
    1.07 MW Prequalified
    Component ID: 614833
    Capacity: 1.07 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • De-Rated Capacity: 1.068
    • OS Grid Reference: TL 188 352
    • Location and Post Code: Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6RF
    • Connection / DSR Capacity: 1.122
    • Generating Technology Class: Reciprocating engines
    • Description of CMU Components: Gas reciprocating engines
    CMU A2AVAR
    2.005 ALKANE ENERGY UK …
    Prequalified
  • ✓ Prequalified
  • 2022-23
    Capacity Information
    De-Rated Capacity
    2.005
    Connection/DSR Capacity
    2.1
    Anticipated Capacity
    2.005
    Max Obligation Period
    1
    Unit Information
    CMU Type
    Non CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    Alkane Energy Limited
    Registered Holder
    ALKANE ENERGY UK LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2022-A2AVAR-001
    Agreement Term
    1
    _id
    6430
    CMU ID
    A2AVAR
    Auction
    Capacity Auction
    Auction Name
    2022-23 (T-1) One Year Ahead Capacity Auction
    CM Unit Name
    Arls6 Avel13
    Name of Applicant
    ALKANE ENERGY UK LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2022-03-25
    Auction Acquired Capacity Obligation
    2.005
    Secondary Trading Contact - Telephone
    '+4401604662400
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2022/2023
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2022-23T-12022-23 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 614801
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TL 188 352
    • Location and Post Code: Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6RF
    • Generating Technology Class: Reciprocating engines
    • Description of CMU Components: Gas reciprocating engines
    2022-23T-12022-23 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 566043
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TL 188 352
    • Location and Post Code: Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6RF
    • Generating Technology Class: Reciprocating engines
    • Description of CMU Components: Gas reciprocating engines
    CMU ADGS17
    3.792 INFINIS ALTERNATIVE ENERGIES …
    Prequalified (2)
  • ✓ Prequalified
  • ✓ Prequalified
  • 2021-22 2018-2021
    Capacity Information
    De-Rated Capacity
    3.792
    Connection/DSR Capacity
    4
    Anticipated Capacity
    3.792
    Max Obligation Period
    3
    Unit Information
    CMU Type
    Non CMRS
    Primary Fuel
    Gas
    Category
    New Build Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    Infinis Energy Management Limited
    Registered Holder
    INFINIS ALTERNATIVE ENERGIES LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2021-ADGS17-001
    Agreement Term
    3
    _id
    5138
    CMU ID
    ADGS17
    Auction
    Capacity Auction
    Auction Name
    2021-22 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    ADGS17
    Name of Applicant
    INFINIS ALTERNATIVE ENERGIES LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2018-03-20
    Auction Acquired Capacity Obligation
    3.792
    Secondary Trading Contact - Telephone
    '+4401604662400
    Duration of Capacity Agreement Awarded
    3
    Delivery Years for which Agreement Valid
    2021/2022, 2022/2023, 2023/2024
    Duration of Capacity Agreement in First Bidding Round
    3
    Auction Participation History
    2021-22T-42021-22 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 149334
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TL 188 352
    • Location and Post Code: Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6RF
    • Generating Technology Class: OCGT and Reciprocating Engines (Fuel Type - Gas)
    • Description of CMU Components: The system comprises of two gas reciprocating engines provided an exported output of around 2MW.
    2018-19T-12018-19 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 615910
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TL 188 352
    • Location and Post Code: Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6RF
    • Generating Technology Class: OCGT and Reciprocating Engines (Fuel Type - Gas)
    • Description of CMU Components: The system comprises of two gas reciprocating engines provided an exported output of around 2MW.
    2018-19T-12018-19 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 567152
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TL 188 352
    • Location and Post Code: Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6RF
    • Generating Technology Class: OCGT and Reciprocating Engines (Fuel Type - Gas)
    • Description of CMU Components: The system comprises of two gas reciprocating engines provided an exported output of around 2MW.
    Welcome to Capacity Market Search
    🗺️ 1 week free trial to explore all features!

    You can explore the basic features, but will need to register for continued access to premium features like the interactive map.

    Choose your contribution amount
    Unlimited access to all premium features

    Secure payment • No subscription • Lifetime access