Home Technologies Companies Locations Map Explorer FAQ ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Home Technologies Companies Locations Map Explorer FAQ ChatGPT Buy Me A Coffee Help
Capacity Market Search
Menu
Home
  • Technologies
  • Companies
  • Locations
  • Map Explorer
  • FAQ
  • ChatGPT

  • Buy Me A Coffee
  • Help

  • Login
  • Register

  • Theme
  • Light
  • Dark
  • Auto
  • Understanding AuctionsSearch ResultsComponent GroupingSortingMap ViewContact Us

    Search Guide

    This registry provides comprehensive search capabilities across all Capacity Market components:

    • Company Search: Enter a company name (e.g., "Drax", "EDF") to see all their components
    • Location Search: Search by city, region, or postcode (e.g., "Manchester", "SW1")
    • CMU ID Search: Enter a specific CMU ID to find exact components
    • Technology Search: Enter technology types like "Hydro", "OCGT", or "Battery"

    The search is intelligent and will try to determine what you're looking for based on your query.

    You can combine search terms to narrow results, such as "London Battery" to find battery storage in London.

    Searches are not case-sensitive, and partial matches are supported (e.g., "Manch" will find "Manchester").

    Understanding Auctions

    The Capacity Market runs regular auctions where providers compete to secure agreements. There are two main types:

    • T-4 auctions: Held 4 years ahead of the delivery year
    • T-1 auctions: Held 1 year ahead to fine-tune capacity requirements

    Each auction results in agreements that specify how much capacity providers must deliver and the payment they'll receive.

    Auction years are displayed as badges (e.g., 2023-24) that you can click to view details for that specific auction year.

    The Capacity Market ensures the UK has sufficient electricity supply during periods of high demand or system stress.

    Providers receive payments for ensuring their capacity is available, creating a more stable and resilient electricity market.

    Search Results

    Search results are grouped by location and show important details about each component:

    • Active Components with auction years 2024-25 or later
    • In-Active Components with only auction years before 2024-25
    • Company Name Click to view all components for this company
    • Technology Click to search for this technology type
    • CMU: XXX Click to search for this CMU ID
    • Auction Year Click to view details for this specific auction

    Each result shows the component's capacity, location details, and participation in specific auction years.

    You can sort results by relevance, location, or date using the sort options.

    Pagination controls appear at the bottom when there are multiple pages of results.

    Component Grouping

    Components at the same location with the same description are grouped together to reduce duplication.

    Each group shows:

    • All CMU IDs for components at that location
    • All auction years, sorted with newest first
    • An Active/Inactive status based on auction years

    Grouping helps identify multi-year contracts and related components at the same site.

    The total capacity shown combines all components in the group.

    Components can be expanded to show individual details by clicking the expand icon.

    Sorting and Filtering

    You can sort search results by:

    • Relevance: Most relevant matches first
    • Location: Alphabetical order by location name
    • Date: By auction year (newest or oldest first)
    • Capacity: Highest or lowest capacity first

    Click the column headers to change sort order.

    You can filter results using the search refinements at the top of the results page:

    • Filter by technology type (e.g., only show batteries)
    • Filter by active status (show only active or inactive components)
    • Filter by auction year (show only components from specific auctions)

    Map Explorer & Map View

    We provide two map-based tools for exploring capacity market data:

    Map Explorer

    The Map Explorer is our advanced interactive mapping tool, specifically designed for comprehensive data exploration with:

    • Mobile-Optimized Interface: Responsive design that works perfectly on phones and tablets
    • Advanced Filtering: Filter by technology type, company, delivery year, and active status
    • Smart Sidebar: Desktop users get a dedicated filter panel, mobile users get collapsible filters
    • Full-Screen Map: Maximizes map space for detailed geographical analysis
    Search Map View

    The Search Map View combines search functionality with map visualization, offering:

    • Search-First Approach: Start with text searches, then visualize results on the map
    • Integrated Results: Search results and map display work together
    • Performance Optimized: Streamlined for fast search result mapping

    Both tools provide a visual representation of capacity distribution across the UK, but serve different exploration needs.

    Map Features:
    • Technology Colors: Different technology types are shown with distinct colors on the map for easy identification:
      GasDSRNuclearCHPSolarWind
      BatteryBiomassHydroInterconnectorCoalOther
    • Technology Legend: The map legend shows all available technologies with their corresponding colors and component counts
    • Search Results on Map: You can view any search results on the map by clicking "View on Map" from search results pages
    • Smart Clustering: Areas with multiple components are automatically grouped into clusters - click clusters to zoom in and see individual components
    • Interactive Markers: Click on individual markers to see detailed information about components at that location

    Use the map controls to zoom in on specific regions or areas of interest. The map automatically adjusts clustering based on your zoom level to provide the clearest view of capacity distribution.

    Contact Us

    We're here to help with any questions about the Capacity Market Registry.

    Email

    For general inquiries and support:

    For LLMs

    Complete programmatic access guide for LLMs:

    Search / All Locations / All Postcodes / PH16 / PH16 5NT

    Errochty Power Station, Tummel Bridge, Pitlochry, PH16 5NT

    267.56 MW (Est from CMU) (part of 267.56 MW aggregated CMU)
    Total Capacity
    PH16 5NT
    Postcode
    27
    Components
    Active*
    2028-29
    Prequalified
    Prequalification
    * Latest auction year on record
    Descriptions:
    • Generating Unit 2
    • Generating Unit 3
    • Generating Unit 1
    Other Locations at This Postcode 1 location
    Errochty Power Station, Tummel Bridge, by Pitlochry, Perthshire, PH16 5NT
    Hydro SSE GENERATION LIMITED4 components

    CMU Registry Data

    CMU ERRO-3
    21.218 SSE Generation Limited
    Prequalified (5)
  • ✓ Prequalified
  • ✓ Prequalified
  • ✓ Prequalified
  • ✓ Prequalified
  • ✓ Prequalified
  • 2028-29 2020-2028
    Capacity Information
    De-Rated Capacity
    21.218
    Connection/DSR Capacity
    25
    Anticipated Capacity
    21.218
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Category
    Existing Generating CMU
    Commercial Information
    Termination Fee Rate 1
    £5,000/MW
    Termination Fee Rate 2
    £25,000/MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Registered Holder
    SSE plc
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-A-T-4-2019-ERRO-3-00001
    Agreement Term
    1
    _id
    2896
    CMU ID
    ERRO-3
    Auction
    Capacity Auction
    Auction Name
    2019-20 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Errochty 3
    Name of Applicant
    SSE Generation Limited
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    Date of Issue of Capacity Agreement
    2016-01-13
    Auction Acquired Capacity Obligation
    21.218
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2019/2020
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2028-29T-42028-29 (T-4) Four Year Ahead Capacity Auction
    22.75 MW Prequalified
    Component ID: 410664
    Capacity: 22.75 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • De-Rated Capacity: 22.75
    • OS Grid Reference: NN 772 593
    • Location and Post Code: Errochty Power Station, Tummel Bridge, Pitlochry, PH16 5NT
    • Primary Fuel of Component: Hydro
    • Generating Technology Class: Hydro
    • Description of CMU Components: Generating Unit 3
    2027-28T-42027-28 (T-4) Four Year Ahead Capacity Auction
    22.80 MW Prequalified
    Component ID: 291864
    Capacity: 22.80 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • De-Rated Capacity: 22.8
    • OS Grid Reference: NN 772 593
    • Location and Post Code: Errochty Power Station, Tummel Bridge, Pitlochry, PH16 5NT
    • Primary Fuel of Component: Hydro
    • Generating Technology Class: Hydro
    • Description of CMU Components: Generating Unit 3
    2024-25T-42024-25 (T-4) Four Year Ahead Capacity Auction
    21.22 MW Prequalified
    Component ID: 158945
    Capacity: 21.22 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NN 772 593
    • Location and Post Code: Errochty Power Station, Tummel Bridge, Pitlochry, PH16 5NT
    • Generating Technology Class: Hydro
    • Description of CMU Components: Generating Unit 3
    2022-23T-?2022-23 (T-3) Three Year Ahead Capacity Auction
    Prequalified
    Component ID: 282313
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SS 529 994
    • Location and Post Code: Trostre Works Llanelli Carmarthenshire SA14 9SD
    • Generating Technology Class: DSR
    • Description of CMU Components: Manufacturing site providing demand response
    2020-21T-42020-21 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 268620
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TL 353 144
    • Location and Post Code: Priory Street, Ware, Hertfordshire, SG12 0DJ
    • Description of CMU Components: On-site existing CHP generating unit
    CMU ERRO-2
    21.218 SSE Generation Limited
    Prequalified (5)
  • ✓ Prequalified
  • ✓ Prequalified
  • ✓ Prequalified
  • ✓ Prequalified
  • ✓ Prequalified
  • 2028-29 2022-2028
    Capacity Information
    De-Rated Capacity
    21.218
    Connection/DSR Capacity
    25
    Anticipated Capacity
    21.218
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Category
    Existing Generating CMU
    Commercial Information
    Termination Fee Rate 1
    £5,000/MW
    Termination Fee Rate 2
    £25,000/MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Registered Holder
    SSE plc
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-A-T-4-2019-ERRO-2-00001
    Agreement Term
    1
    _id
    2895
    CMU ID
    ERRO-2
    Auction
    Capacity Auction
    Auction Name
    2019-20 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Errochty 2
    Name of Applicant
    SSE Generation Limited
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    Date of Issue of Capacity Agreement
    2016-01-13
    Auction Acquired Capacity Obligation
    21.218
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2019/2020
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2028-29T-42028-29 (T-4) Four Year Ahead Capacity Auction
    22.75 MW Prequalified
    Component ID: 410661
    Capacity: 22.75 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • De-Rated Capacity: 22.75
    • OS Grid Reference: NN 772 593
    • Location and Post Code: Errochty Power Station, Tummel Bridge, Pitlochry, PH16 5NT
    • Primary Fuel of Component: Hydro
    • Generating Technology Class: Hydro
    • Description of CMU Components: Generating Unit 2
    2027-28T-42027-28 (T-4) Four Year Ahead Capacity Auction
    22.80 MW Prequalified
    Component ID: 366850
    Capacity: 22.80 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • De-Rated Capacity: 22.8
    • OS Grid Reference: NN 772 593
    • Location and Post Code: Errochty Power Station, Tummel Bridge, Pitlochry, PH16 5NT
    • Primary Fuel of Component: Hydro
    • Generating Technology Class: Hydro
    • Description of CMU Components: Generating Unit 2
    2024-25T-42024-25 (T-4) Four Year Ahead Capacity Auction
    21.22 MW Prequalified
    Component ID: 731
    Capacity: 21.22 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NN 772 593
    • Location and Post Code: Errochty Power Station, Tummel Bridge, Pitlochry, PH16 5NT
    • Generating Technology Class: Hydro
    • Description of CMU Components: Generating Unit 2
    2023-24T-42023-24 (T-4) Four Year Ahead Capacity Auction
    21.22 MW Prequalified
    Component ID: 220149
    Capacity: 21.22 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NN 772 593
    • Location and Post Code: Errochty Power Station, Tummel Bridge, Pitlochry, PH16 5NT
    • Generating Technology Class: Hydro
    • Description of CMU Components: Generating Unit 2
    2022-23T-?2022-23 (T-3) Three Year Ahead Capacity Auction
    Prequalified
    Component ID: 268700
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • Location and Post Code: N/A
    • Generating Technology Class: DSR
    • Description of CMU Components: N/A
    2022-23T-42022-23 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 140
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NN 772 593
    • Location and Post Code: Errochty Power Station, Tummel Bridge, Pitlochry, PH16 5NT
    • Generating Technology Class: Hydro
    • Description of CMU Components: Generating Unit 2
    CMU 17PR05
    SEMBCORP ENERGY UK …
    Prequalified
  • ✓ Prequalified
  • 2027-28
    Capacity Information
    Connection/DSR Capacity
    10
    Max Obligation Period
    15
    Unit Information
    CMU Type
    Non CMRS
    Primary Fuel
    Gas
    Category
    Refurbishing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    SEMBCORP ENERGY UK LIMITED
    Registered Holder
    UK POWER RESERVE LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2021-17PR05-001
    Agreement Term
    1
    _id
    5090
    CMU ID
    17PR05
    Auction
    Capacity Auction
    Auction Name
    2021-22 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    South Cornelly Power Station
    Name of Applicant
    UK POWER RESERVE LIMITED
    Pre-Qualification Decision
    Prequalified
    Pre-Refurbishing CMU Status
    Opt-In
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Pre-Refurbishment Bidding Status
    Pre & Post Refurbishing
    Secondary Trading Contact - Email
    [email protected]
    Pre-Refurbishing De-Rated Capacity
    9.481
    Date of Issue of Capacity Agreement
    2018-03-20
    Post-Refurbishing De-Rated Capacity
    9.481
    Auction Acquired Capacity Obligation
    9.481
    Secondary Trading Contact - Telephone
    '+4401217121970
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2021/2022
    Subject to a Minimum Completion Requirement
    Yes
    Anticipated Pre-Refurbishing De-Rated Capacity
    9.582
    Anticipated Post-Refurbishing De-Rated Capacity
    9.481
    Duration of Capacity Agreement in First Bidding Round
    15
    Auction Participation History
    2027-28T-42027-28 (T-4) Four Year Ahead Capacity Auction
    22.80 MW Prequalified
    Component ID: 54567
    Capacity: 22.80 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • De-Rated Capacity: 22.8
    • OS Grid Reference: NN 772 593
    • Location and Post Code: Errochty Power Station, Tummel Bridge, Pitlochry, PH16 5NT
    • Connection / DSR Capacity: 25
    • Primary Fuel of Component: Hydro
    • Generating Technology Class: Hydro
    • Description of CMU Components: Generating Unit 1
    CMU ERRO-1
    21.218 SSE Generation Limited
    Prequalified (3)
  • ✓ Prequalified
  • ✓ Prequalified
  • ✓ Prequalified
  • 2026-27 2024-2026
    Capacity Information
    De-Rated Capacity
    21.218
    Connection/DSR Capacity
    25
    Anticipated Capacity
    21.218
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Category
    Existing Generating CMU
    Commercial Information
    Termination Fee Rate 1
    £5,000/MW
    Termination Fee Rate 2
    £25,000/MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Registered Holder
    SSE plc
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-A-T-4-2019-ERRO-1-00001
    Agreement Term
    1
    _id
    2894
    CMU ID
    ERRO-1
    Auction
    Capacity Auction
    Auction Name
    2019-20 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Errochty 1
    Name of Applicant
    SSE Generation Limited
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    Date of Issue of Capacity Agreement
    2016-01-13
    Auction Acquired Capacity Obligation
    21.218
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2019/2020
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2026-27T-42026-27 (T-4) Four Year Ahead Capacity Auction
    22.94 MW Prequalified
    Component ID: 366235
    Capacity: 22.94 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • De-Rated Capacity: 22.938
    • OS Grid Reference: NN 772 593
    • Location and Post Code: Errochty Power Station, Tummel Bridge, Pitlochry, PH16 5NT
    • Connection / DSR Capacity: 25.171
    • Generating Technology Class: Hydro
    • Description of CMU Components: Generating Unit 1
    2026-27T-42026-27 (T-4) Four Year Ahead Capacity Auction
    22.94 MW Prequalified
    Component ID: 366252
    Capacity: 22.94 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • De-Rated Capacity: 22.938
    • OS Grid Reference: NN 772 593
    • Location and Post Code: Errochty Power Station, Tummel Bridge, Pitlochry, PH16 5NT
    • Connection / DSR Capacity: 25.171
    • Generating Technology Class: Hydro
    • Description of CMU Components: Generating Unit 1
    2025-26T-42025-26 (T-4) Four Year Ahead Capacity Auction
    21.22 MW Prequalified
    Component ID: 281509
    Capacity: 21.22 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NN 772 593
    • Location and Post Code: Errochty Power Station, Tummel Bridge, Pitlochry, PH16 5NT
    • Generating Technology Class: Hydro
    • Description of CMU Components: Generating Unit 1
    2024-25T-42024-25 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 140375
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NN 772 593
    • Location and Post Code: Errochty Power Station, Tummel Bridge, Pitlochry, PH16 5NT
    • Generating Technology Class: Hydro
    • Description of CMU Components: Generating Unit 1
    CMU NEWB23
    6.649 BALANCE POWER PROJECTS …
    Not Prequalified (2)
  • ✗ Not Prequalified
  • ✗ Not Prequalified
  • 2026-27
    Capacity Information
    De-Rated Capacity
    6.649
    Connection/DSR Capacity
    7
    Anticipated Capacity
    6.649
    Max Obligation Period
    15
    Unit Information
    CMU Type
    Non CMRS
    Primary Fuel
    Gas
    Category
    New Build Generating CMU
    Storage Facility
    No
    Commercial Information
    Organization
    Company Name
    N/A
    Opt Out Status
    Opt-In
    Agreement Details
    _id
    10098
    CMU ID
    NEWB23
    Auction
    Capacity Auction
    Auction Name
    2023-24 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    NEWBURN HAUGH
    Name of Applicant
    BALANCE POWER PROJECTS LIMITED
    Pre-Qualification Decision
    Not Prequalified
    Transmission / Distribution
    Distribution
    Secondary Trading Contact - Email
    [email protected]
    Secondary Trading Contact - Telephone
    '+4401519580431
    Auction Participation History
    2026-27T-42026-27 (T-4) Four Year Ahead Capacity Auction
    22.92 MW Not Prequalified
    Component ID: 268611
    Capacity: 22.92 MW
    Status: Not Prequalified
    Auction-specific values (differ from CMU baseline):
    • De-Rated Capacity: 22.917
    • OS Grid Reference: NN 772 593
    • Location and Post Code: Errochty Power Station, Tummel Bridge, Pitlochry, PH16 5NT
    • Connection / DSR Capacity: 25.148
    • Generating Technology Class: Hydro
    • Description of CMU Components: Generating Unit 3
    CMU WATERS
    13.999 Waterswallows Energy Limited
    Prequalified
  • ✓ Prequalified
  • 2025-26
    Capacity Information
    De-Rated Capacity
    13.999
    Connection/DSR Capacity
    14.955
    Anticipated Capacity
    13.9993755
    Max Obligation Period
    15
    Unit Information
    CMU Type
    Non CMRS
    Category
    New Build Generating CMU
    Commercial Information
    Organization
    Company Name
    N/A
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    No
    _id
    2185
    CMU ID
    WATERS
    Auction
    Capacity Auction
    Auction Name
    2018-19 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Waterswallows Energy Limited
    Opt-Out Reason
    N/A (Opt-in)
    Name of Applicant
    Waterswallows Energy Limited
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    New Build Yet to Satisfy FCM
    Yes
    CMU confirmed entry into Auction
    Yes
    Connection Agreement Deferral Declaration
    Yes
    Duration of Capacity Agreement in First Bidding Round
    15
    Auction Participation History
    2025-26T-42025-26 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 281500
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NN 772 593
    • Location and Post Code: Errochty Power Station, Tummel Bridge, Pitlochry, PH16 5NT
    • Generating Technology Class: Hydro
    • Description of CMU Components: Generating Unit 1
    CMU BEES25
    6.357 ETP-QQR ENERGY LIMITED
    Not Prequalified (2)
  • ✗ Not Prequalified
  • ✗ Not Prequalified
  • 2024-25
    Capacity Information
    De-Rated Capacity
    6.357
    Connection/DSR Capacity
    16
    Anticipated Capacity
    6.357
    Max Obligation Period
    15
    Unit Information
    CMU Type
    Non CMRS
    Primary Fuel
    Storage - Battery
    Category
    New Build Generating CMU
    Storage Facility
    Yes
    Commercial Information
    Organization
    Company Name
    N/A
    Opt Out Status
    Opt-In
    Agreement Details
    _id
    12499
    CMU ID
    BEES25
    Auction
    Capacity Auction
    Auction Name
    2025-26 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Beeston
    Name of Applicant
    ETP-QQR ENERGY LIMITED
    Amount of Credit Cover
    63570
    Pre-Qualification Decision
    Not Prequalified
    Transmission / Distribution
    Distribution
    Secondary Trading Contact - Email
    [email protected]
    Secondary Trading Contact - Telephone
    '+44020745416282
    Auction Participation History
    2024-25T-42024-25 (T-4) Four Year Ahead Capacity Auction
    Not Prequalified
    Component ID: 730
    Status: Not Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NN 772 593
    • Location and Post Code: Errochty Power Station, Tummel Bridge, Pitlochry, PH16 5NT
    • Generating Technology Class: Hydro
    • Description of CMU Components: Generating Unit 2
    CMU DudInc
    4.226 Dudley Waste Services …
    Rejected (2)
  • ✗ Rejected
  • ✗ Rejected
  • 2023-24
    Capacity Information
    De-Rated Capacity
    4.226
    Connection/DSR Capacity
    4.825
    Anticipated Capacity
    8.233
    Max Obligation Period
    1
    Unit Information
    CMU Type
    Non CMRS
    Primary Fuel
    Waste
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Organization
    Company Name
    N/A
    Parent Company
    CNIM Developments S.A.
    Opt Out Status
    Opt-In
    Agreement Details
    _id
    5436
    CMU ID
    DudInc
    Auction
    Capacity Auction
    Auction Name
    2021-22 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Dudley Incinerator
    Name of Applicant
    Dudley Waste Services Limited
    Pre-Qualification Decision
    Rejected
    Transmission / Distribution
    Distribution
    Secondary Trading Contact - Email
    [email protected]
    Secondary Trading Contact - Telephone
    '+447980780838
    Auction Participation History
    2023-24T-42023-24 (T-4) Four Year Ahead Capacity Auction
    Rejected
    Component ID: 220494
    Status: Rejected
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NN 772 593
    • Location and Post Code: Errochty Power Station, Tummel Bridge, Pitlochry, PH16 5NT
    • Generating Technology Class: Hydro
    • Description of CMU Components: Generating Unit 3
    CMU PEMB31
    427.5 RWE GENERATION UK …
    Prequalified
  • ✓ Prequalified
  • 2023-24
    Capacity Information
    De-Rated Capacity
    427.5
    Connection/DSR Capacity
    475
    Anticipated Capacity
    427.5
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    RWE Generation UK Holdings Limited
    Registered Holder
    RWE GENERATION UK PLC
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2021-PEMB31-001
    Agreement Term
    1
    _id
    5991
    CMU ID
    PEMB31
    Auction
    Capacity Auction
    Auction Name
    2021-22 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    CMU_PEMB-31
    Name of Applicant
    RWE GENERATION UK PLC
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2018-03-20
    Auction Acquired Capacity Obligation
    427.5
    Secondary Trading Contact - Telephone
    '+4401793475215
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2021/2022
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2023-24T-42023-24 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 220141
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NN 772 593
    • Location and Post Code: Errochty Power Station, Tummel Bridge, Pitlochry, PH16 5NT
    • Generating Technology Class: Hydro
    • Description of CMU Components: Generating Unit 2
    CMU RANN-1
    13.786 SSE GENERATION LIMITED
    Prequalified
  • ✓ Prequalified
  • 2023-24
    Capacity Information
    De-Rated Capacity
    13.786
    Connection/DSR Capacity
    16
    Anticipated Capacity
    13.786
    Max Obligation Period
    1
    Unit Information
    CMU Type
    Non CMRS
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Registered Holder
    SSE GENERATION LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2020-RANN-1-001
    Agreement Term
    1
    _id
    4444
    CMU ID
    RANN-1
    Auction
    Capacity Auction
    Auction Name
    2020-21 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Rannoch 1
    Name of Applicant
    SSE GENERATION LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Date of Issue of Capacity Agreement
    2017-01-20
    Auction Acquired Capacity Obligation
    13.786
    Secondary Trading Contact - Telephone
    '+441738340483
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2020/2021
    Auction Participation History
    2023-24T-42023-24 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 366950
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NN 772 593
    • Location and Post Code: Errochty Power Station, Tummel Bridge, Pitlochry, PH16 5NT
    • Generating Technology Class: Hydro
    • Description of CMU Components: Generating Unit 1
    CMU GBD011
    1.826 GRIDBEYOND LIMITED
    Prequalified
  • ✓ Prequalified
  • 2022-23
    Capacity Information
    De-Rated Capacity
    1.826
    Connection/DSR Capacity
    2
    Anticipated Capacity
    1.826
    Max Obligation Period
    1
    Unit Information
    CMU Type
    Non CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Organization
    Company Name
    N/A
    Opt Out Status
    Opt-In
    Agreement Details
    _id
    9109
    CMU ID
    GBD011
    Auction
    Capacity Auction
    Auction Name
    2023-24 (T-1) One Year Ahead Capacity Auction
    CM Unit Name
    First Milk Cheese Company
    Name of Applicant
    GRIDBEYOND LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    Secondary Trading Contact - Email
    [email protected]
    Secondary Trading Contact - Telephone
    '+4401923431638
    Auction Participation History
    2022-23T-?2022-23 (T-3) Three Year Ahead Capacity Auction
    Prequalified
    Component ID: 282303
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NN 772 593
    • Location and Post Code: Errochty Power Station, Tummel Bridge, Pitlochry, PH16 5NT
    • Generating Technology Class: Hydro
    • Description of CMU Components: Generating Unit 3
    CMU CES208
    4.123 LEICESTER DISTRICT ENERGY …
    Prequalified
  • ✓ Prequalified
  • 2022-23
    Capacity Information
    De-Rated Capacity
    4.123
    Connection/DSR Capacity
    4.581
    Anticipated Capacity
    4.123
    Max Obligation Period
    1
    Unit Information
    CMU Type
    Non CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    BRING ENERGY GROUP LIMITED
    Registered Holder
    LEICESTER DISTRICT ENERGY COMPANY LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2023-CES208-001
    Agreement Term
    1
    _id
    9564
    CMU ID
    CES208
    Auction
    Capacity Auction
    Auction Name
    2023-24 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    LDEC
    Name of Applicant
    LEICESTER DISTRICT ENERGY COMPANY LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2020-04-17
    Auction Acquired Capacity Obligation
    4.123
    Secondary Trading Contact - Telephone
    '+4407811071199
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2023/2024
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2022-23T-?2022-23 (T-3) Three Year Ahead Capacity Auction
    Prequalified
    Component ID: 268691
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NN 772 593
    • Location and Post Code: Errochty Power Station, Tummel Bridge, Pitlochry, PH16 5NT
    • Generating Technology Class: Hydro
    • Description of CMU Components: Generating Unit 2
    CMU DSR033
    10 E.ON UK PLC
    Conditional
  • ⚠ Conditionally Prequalified
  • 2022-23
    Capacity Information
    De-Rated Capacity
    10
    Connection/DSR Capacity
    11.865
    Anticipated Capacity
    10
    Max Obligation Period
    1
    Unit Information
    CMU Type
    Non CMRS
    Primary Fuel
    DSR
    Category
    Unproven DSR CMU
    Storage Facility
    No
    Commercial Information
    Organization
    Company Name
    N/A
    Opt Out Status
    Opt-In
    Agreement Details
    _id
    8118
    CMU ID
    DSR033
    Auction
    Capacity Auction
    Auction Name
    2022-23 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    EON033
    Unproven DSR
    Yes
    Name of Applicant
    E.ON UK PLC
    Pre-Qualification Decision
    Conditionally Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    No
    Secondary Trading Contact - Email
    [email protected]
    Secondary Trading Contact - Telephone
    '+4407816292478
    Auction Participation History
    2022-23T-42022-23 (T-4) Four Year Ahead Capacity Auction
    Conditionally Prequalified
    Component ID: 281419
    Status: Conditionally Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NN 772 593
    • Location and Post Code: Errochty Power Station, Tummel Bridge, Pitlochry, PH16 5NT
    • Generating Technology Class: Hydro
    • Description of CMU Components: Generating Unit 1
    CMU CES810
    1.914 BIRMINGHAM DISTRICT ENERGY …
    Prequalified
  • ✓ Prequalified
  • 2022-23
    Capacity Information
    De-Rated Capacity
    1.914
    Connection/DSR Capacity
    2.09
    Anticipated Capacity
    1.914
    Max Obligation Period
    1
    Unit Information
    CMU Type
    Non CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    BRING ENERGY GROUP LIMITED
    Registered Holder
    BIRMINGHAM DISTRICT ENERGY COMPANY LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2024-CES810-001
    Agreement Term
    1
    _id
    10527
    CMU ID
    CES810
    Auction
    Capacity Auction
    Auction Name
    2024-25 (T-1) One Year Ahead Capacity Auction
    CM Unit Name
    BDEC2
    Name of Applicant
    BIRMINGHAM DISTRICT ENERGY COMPANY LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2024-04-02
    Auction Acquired Capacity Obligation
    1.914
    Secondary Trading Contact - Telephone
    '+4407811071199
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2024/2025
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2022-23T-42022-23 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 277232
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NN 772 593
    • Location and Post Code: Errochty Power Station, Tummel Bridge, Pitlochry, PH16 5NT
    • Generating Technology Class: Hydro
    • Description of CMU Components: Generating Unit 3
    CMU ERR126
    22.938 SSE GENERATION LIMITED
    Prequalified
  • ✓ Prequalified
  • 2020-21
    Capacity Information
    De-Rated Capacity
    22.938
    Connection/DSR Capacity
    25.171
    Anticipated Capacity
    22.938
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Hydro
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    SSE plc
    Registered Holder
    SSE GENERATION LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2026-ERR126-001
    Agreement Term
    1
    _id
    13718
    CMU ID
    ERR126
    Auction
    Capacity Auction
    Auction Name
    2026-27 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Errochty 1
    Name of Applicant
    SSE GENERATION LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2023-03-31
    Auction Acquired Capacity Obligation
    22.938
    Secondary Trading Contact - Telephone
    '+441738340483
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2026/2027
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2020-21T-42020-21 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 366247
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TQ 386 810
    • Location and Post Code: 3 Nutmeg Ln, London E14 2AX
    • Description of CMU Components: Load reduction on site supported by non-exporting standby generation.
    Welcome to Capacity Market Search
    🗺️ 1 week free trial to explore all features!

    You can explore the basic features, but will need to register for continued access to premium features like the interactive map.

    Choose your contribution amount
    Unlimited access to all premium features

    Secure payment • No subscription • Lifetime access