Search Results for "PE11"
24 unique locations (99 components)
Asda Boston, Pudding Lane Spalding, Lincs, PE11 3TJ (6 components)
Bicker Road Donington Spalding PE11 4XR (1 component)
Energy storage system providing capacity market, dynamic FFR and other balancing services.
Boots, Spalding Hall Place - South Lincs and North Cambs PE11 1SA (1 component)
Commercial sites
Castle Sports Complex, Albion Street, PE11 2AJ (1 component)
CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
Fowler Welch - Site 2, W Marsh Rd, Spalding PE11 2HR, UK (12 components)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)
Fowler Welch - Site 3, W Marsh Rd, Spalding PE11 2HR, UK (12 components)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)
Land And Buildings Whitehall, Gosberton PE11 4HQ (1 component)
CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
Land off Bervor Close Pinchbeck Spalding PE11 3ZN (1 component)
Energy storage system providing capacity market, dynamic FFR and other balancing services.
Land On The North West Side Of Roman Bank, Spalding, PE11 2HR (1 component)
CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
Land On The South Side Of Holbeach Road, Spalding, PE11 2HX (1 component)
CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
Parkside Crescent, Spalding, PE11 1QT (1 component)
CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
Sir Halley Stewart Playing Field, Winfrey Avenue, Spalding, PE11 1DA (1 component)
CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
Spalding STW, SPALDING STW, West Marsh Road, SPALDING Lincolnshire, PE11 2BB, (3 components)
The CMU Component reduces import demand by turning on back up generation. (2)
Viking Link, Bicker Fen Converter Station, North Ing Drove, Donnington, Spalding, Lincolnshire, PE11 4XY (3 components)
HVDC interconnector between GB and Danish transmission systems. Viking Link will involve the construction of two converter stations, sited in GB and Denmark. At the converter stations, alternating current electricity … (3)
Viking Link Ltd, Bicker Fen Converter Station, Northorpe Road, Donington SPALDING PE11 4XY (2 components)
Water Tower, Knight Street, Pinchbeck, Spalding, PE11 3XD (2 components)
CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)
West Marsh Road Spalding Lincolnshire PE11 2BB (3 components)
West Marsh Road, Spalding, Lincolnshire, PE11 2BB (6 components)
A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. … (3)
West Marsh Road Spalding Lincolnshire PE11 3BB (14 components)
A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is … (3)
West Marsh Road, Spalding, Lincolnshire, PE11 3BB (6 components)
A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. … (3)
WEST PINCHBECK WTW, Parson Drove, Spalding, Lincolnshire, PE11 3QW (4 components)
Diesel Generator, Perkins (2)
West Pinchbeck WTW, WEST PINCHBECK WTW, Parsons Drove, West Pinchbeck, SPALDING Lincolnshire, PE11 3QW, (3 components)
The CMU Component reduces import demand by turning on back up generation. (2)
W Marsh Rd, Spalding, PE11 2BB, United Kingdom (2 components)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (2)
XPO - Spalding, W Marsh Rd, Spalding PE11 2HR, UK (12 components)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)