Home Technologies Companies Locations Map Explorer FAQ ChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Home Technologies Companies Locations Map Explorer FAQ ChatGPT Help
Capacity Market Search
Menu
Home
  • Technologies
  • Companies
  • Locations
  • Map Explorer
  • FAQ
  • ChatGPT

  • Help

  • Login
  • Register

  • Theme
  • Light
  • Dark
  • Auto
  • Understanding AuctionsSearch ResultsComponent GroupingSortingMap ViewContact Us

    Search Guide

    This registry provides comprehensive search capabilities across all Capacity Market components:

    • Company Search: Enter a company name (e.g., "Drax", "EDF") to see all their components
    • Location Search: Search by city, region, or postcode (e.g., "Manchester", "SW1")
    • CMU ID Search: Enter a specific CMU ID to find exact components
    • Technology Search: Enter technology types like "Hydro", "OCGT", or "Battery"

    The search is intelligent and will try to determine what you're looking for based on your query.

    You can combine search terms to narrow results, such as "London Battery" to find battery storage in London.

    Searches are not case-sensitive, and partial matches are supported (e.g., "Manch" will find "Manchester").

    Understanding Auctions

    The Capacity Market runs regular auctions where providers compete to secure agreements. There are two main types:

    • T-4 auctions: Held 4 years ahead of the delivery year
    • T-1 auctions: Held 1 year ahead to fine-tune capacity requirements

    Each auction results in agreements that specify how much capacity providers must deliver and the payment they'll receive.

    Auction years are displayed as badges (e.g., 2023-24) that you can click to view details for that specific auction year.

    The Capacity Market ensures the UK has sufficient electricity supply during periods of high demand or system stress.

    Providers receive payments for ensuring their capacity is available, creating a more stable and resilient electricity market.

    Search Results

    Search results are grouped by location and show important details about each component:

    • Active Components with auction years 2024-25 or later
    • In-Active Components with only auction years before 2024-25
    • Company Name Click to view all components for this company
    • Technology Click to search for this technology type
    • CMU: XXX Click to search for this CMU ID
    • Auction Year Click to view details for this specific auction

    Each result shows the component's capacity, location details, and participation in specific auction years.

    You can sort results by relevance, location, or date using the sort options.

    Pagination controls appear at the bottom when there are multiple pages of results.

    Component Grouping

    Components at the same location with the same description are grouped together to reduce duplication.

    Each group shows:

    • All CMU IDs for components at that location
    • All auction years, sorted with newest first
    • An Active/Inactive status based on auction years

    Grouping helps identify multi-year contracts and related components at the same site.

    The total capacity shown combines all components in the group.

    Components can be expanded to show individual details by clicking the expand icon.

    Sorting and Filtering

    You can sort search results by:

    • Relevance: Most relevant matches first
    • Location: Alphabetical order by location name
    • Date: By auction year (newest or oldest first)
    • Capacity: Highest or lowest capacity first

    Click the column headers to change sort order.

    You can filter results using the search refinements at the top of the results page:

    • Filter by technology type (e.g., only show batteries)
    • Filter by active status (show only active or inactive components)
    • Filter by auction year (show only components from specific auctions)

    Map Explorer & Map View

    We provide two map-based tools for exploring capacity market data:

    Map Explorer

    The Map Explorer is our advanced interactive mapping tool, specifically designed for comprehensive data exploration with:

    • Mobile-Optimized Interface: Responsive design that works perfectly on phones and tablets
    • Advanced Filtering: Filter by technology type, company, delivery year, and active status
    • Smart Sidebar: Desktop users get a dedicated filter panel, mobile users get collapsible filters
    • Full-Screen Map: Maximizes map space for detailed geographical analysis
    Search Map View

    The Search Map View combines search functionality with map visualization, offering:

    • Search-First Approach: Start with text searches, then visualize results on the map
    • Integrated Results: Search results and map display work together
    • Performance Optimized: Streamlined for fast search result mapping

    Both tools provide a visual representation of capacity distribution across the UK, but serve different exploration needs.

    Map Features:
    • Technology Colors: Different technology types are shown with distinct colors on the map for easy identification:
      GasDSRNuclearCHPSolarWind
      BatteryBiomassHydroInterconnectorCoalOther
    • Technology Legend: The map legend shows all available technologies with their corresponding colors and component counts
    • Search Results on Map: You can view any search results on the map by clicking "View on Map" from search results pages
    • Smart Clustering: Areas with multiple components are automatically grouped into clusters - click clusters to zoom in and see individual components
    • Interactive Markers: Click on individual markers to see detailed information about components at that location

    Use the map controls to zoom in on specific regions or areas of interest. The map automatically adjusts clustering based on your zoom level to provide the clearest view of capacity distribution.

    Contact Us

    We're here to help with any questions about the Capacity Market Registry.

    Email

    For general inquiries and support:

    For LLMs

    Complete programmatic access guide for LLMs:

    Search / All Locations / All Postcodes / PA33 / PA33 1AN

    Lochawe, Dalmally, Argyll, PA33 1AN, Scotland

    827.61 MW (Est from CMU) (part of 827.61 MW aggregated CMU)
    Total Capacity
    PA33 1AN
    Postcode
    27
    Components
    Active*
    2028-29
    Prequalified
    Prequalification
    * Latest auction year on record
    Descriptions:
    • Unit 1 Cruachan pumped storage hydro plant
    • Unit 2 Cruachan pumped storage hydro plant
    • Unit 4 Cruachan pump storage hydro plant
    Trading Contacts:
    DRAX PUMPED STORAGE LIMITED
    '+441757618381 [email protected]
    DRAX PUMPED STORAGE LIMITED
    '+441757618381
    Other Locations at This Postcode 1 location
    Lochawe, Dalmally. Argyll. PA33 1AN. Scotland 121.05 MW (Est from CMU) (part of 121.05 MW aggregated CMU)
    Storage DRAX PUMPED STORAGE LIMITED16 components

    CMU Registry Data

    CMU 24CRU1
    111.588 DRAX PUMPED STORAGE …
    Prequalified
  • ✓ Prequalified
  • 2028-29
    Capacity Information
    De-Rated Capacity
    111.588
    Connection/DSR Capacity
    120
    Anticipated Capacity
    111.588
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Storage - Pumped
    Category
    Existing Generating CMU
    Storage Facility
    Yes
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    Drax Hydro Limited
    Registered Holder
    DRAX PUMPED STORAGE LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2028-24CRU1-001
    Agreement Term
    1
    _id
    15196
    CMU ID
    24CRU1
    Auction
    Capacity Auction
    Auction Name
    2028-29 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Cruachan Unit 1
    Name of Applicant
    DRAX PUMPED STORAGE LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    Date of Issue of Capacity Agreement
    2025-04-04
    Auction Acquired Capacity Obligation
    111.588
    Secondary Trading Contact - Telephone
    '+441757618381
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2028/2029
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2028-29T-42028-29 (T-4) Four Year Ahead Capacity Auction
    55.79 MW Prequalified
    Component ID:Not available
    View Details: Location Page
    Capacity: 55.79 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NN 077 268
    • Location and Post Code: Lochawe, Dalmally, Argyll, PA33 1AN, Scotland
    • Primary Fuel of Component: Storage - Pumped
    • Generating Technology Class: Storage (Duration 12h)
    • Description of CMU Components: Unit 1 Cruachan pumped storage hydro plant
    CMU 24CRU2
    111.588 DRAX PUMPED STORAGE …
    Prequalified (2)
  • ✓ Prequalified
  • ✓ Prequalified
  • 2028-29 2024-2028
    Capacity Information
    De-Rated Capacity
    111.588
    Connection/DSR Capacity
    120
    Anticipated Capacity
    111.588
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Storage - Pumped
    Category
    Existing Generating CMU
    Storage Facility
    Yes
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Name of Applicant
    Company Name
    N/A
    Parent Company
    Drax Hydro Limited
    Registered Holder
    DRAX PUMPED STORAGE LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2028-24CRU2-001
    Agreement Term
    1
    _id
    15197
    CMU ID
    24CRU2
    Auction
    Capacity Auction
    Auction Name
    2028-29 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Cruachan Unit 2
    Name of Applicant
    DRAX PUMPED STORAGE LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    Date of Issue of Capacity Agreement
    2025-04-04
    Auction Acquired Capacity Obligation
    111.588
    Secondary Trading Contact - Telephone
    '+441757618381
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2028/2029
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2028-29T-42028-29 (T-4) Four Year Ahead Capacity Auction
    55.79 MW Prequalified
    Component ID:Not available
    View Details: Location Page
    Capacity: 55.79 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NN 077 268
    • Location and Post Code: Lochawe, Dalmally, Argyll, PA33 1AN, Scotland
    • Primary Fuel of Component: Storage - Pumped
    • Generating Technology Class: Storage (Duration 12h)
    • Description of CMU Components: Unit 2 Cruachan pumped storage hydro plant
    2028-29T-42028-29 (T-4) Four Year Ahead Capacity Auction
    55.79 MW Prequalified
    Component ID:Not available
    View Details: Location Page
    Capacity: 55.79 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NN 077 268
    • Location and Post Code: Lochawe, Dalmally, Argyll, PA33 1AN, Scotland
    • Primary Fuel of Component: Storage - Pumped
    • Generating Technology Class: Storage (Duration 12h)
    • Description of CMU Components: Unit 2 Cruachan pumped storage hydro plant
    CMU 23CR4R
    DRAX PUMPED STORAGE …
    Prequalified
  • ✓ Prequalified
  • 2027-28
    Capacity Information
    Connection/DSR Capacity
    120
    Max Obligation Period
    15
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Storage - Pumped
    Category
    Refurbishing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Name of Applicant
    DRAX PUMPED STORAGE LIMITED
    Company Name
    N/A
    Parent Company
    Drax Hydro Limited
    Registered Holder
    DRAX PUMPED STORAGE LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2027-23CR4R-001
    Agreement Term
    15
    _id
    14336
    CMU ID
    23CR4R
    Auction
    Capacity Auction
    Auction Name
    2027-28 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Cruachan Unit 4
    Name of Applicant
    DRAX PUMPED STORAGE LIMITED
    Pre-Qualification Decision
    Prequalified
    Pre-Refurbishing CMU Status
    Opt-In
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Pre-Refurbishment Bidding Status
    Pre & Post Refurbishing
    Secondary Trading Contact - Email
    [email protected]
    Pre-Refurbishing De-Rated Capacity
    97.408
    Date of Issue of Capacity Agreement
    2024-04-08
    Post-Refurbishing De-Rated Capacity
    113.244
    Auction Acquired Capacity Obligation
    113.244
    Secondary Trading Contact - Telephone
    '+441757618381
    Duration of Capacity Agreement Awarded
    15
    Delivery Years for which Agreement Valid
    2027/2028, 2028/2029, 2029/2030, 2030/2031, 2031/2032, 2032/2033, 2033/2034, 2034/2035, 2035/2036, 2036/2037, 2037/2038, 2038/2039, 2039/2040, 2040/2041, 2041/2042
    Latest Date SCM is expected to be achieved
    2027-09-30
    Subject to Substantial Completion Milestone
    Yes
    Subject to a Minimum Completion Requirement
    Yes
    Earliest Date SCM is expected to be achieved
    2027-09-10
    Anticipated Pre-Refurbishing De-Rated Capacity
    97.408
    Anticipated Post-Refurbishing De-Rated Capacity
    113.244
    Duration of Capacity Agreement in First Bidding Round
    15
    Long-Stop Date for the Minimum Completion Requirement
    2028-10-01
    Auction Participation History
    2027-28T-42027-28 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID:Not available
    View Details: Location Page
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NN 077 268
    • Location and Post Code: Lochawe, Dalmally, Argyll, PA33 1AN, Scotland
    • Primary Fuel of Component: Storage - Pumped
    • Generating Technology Class: Storage (Duration 12h)
    • Description of CMU Components: Refurbishment Unit 4 Cruachan pump storage hydro plant
    CMU 22CRU2
    114.827 DRAX PUMPED STORAGE …
    Prequalified
  • ✓ Prequalified
  • 2026-27
    Capacity Information
    De-Rated Capacity
    114.827
    Connection/DSR Capacity
    120.553
    Anticipated Capacity
    114.827
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Storage - Pumped
    Category
    Existing Generating CMU
    Storage Facility
    Yes
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Name of Applicant
    DRAX PUMPED STORAGE LIMITED
    Company Name
    N/A
    Parent Company
    Drax Hydro Limited
    Registered Holder
    DRAX PUMPED STORAGE LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2026-22CRU2-001
    Agreement Term
    1
    _id
    13466
    CMU ID
    22CRU2
    Auction
    Capacity Auction
    Auction Name
    2026-27 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Cruachan Unit 2
    Name of Applicant
    DRAX PUMPED STORAGE LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2023-03-31
    Auction Acquired Capacity Obligation
    114.827
    Secondary Trading Contact - Telephone
    '+441757618381
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2026/2027
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2026-27T-42026-27 (T-4) Four Year Ahead Capacity Auction
    114.83 MW Prequalified
    Component ID:Not available
    View Details: Location Page
    Capacity: 114.83 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NN 077 268
    • Location and Post Code: Lochawe, Dalmally, Argyll, PA33 1AN, Scotland
    • Generating Technology Class: Storage (Duration 12h)
    • Description of CMU Components: Unit 2 Cruachan pumped storage hydro plant
    CMU 20CRU2
    113.782 DRAX PUMPED STORAGE …
    Prequalified
  • ✓ Prequalified
  • 2024-25
    Capacity Information
    De-Rated Capacity
    113.782
    Connection/DSR Capacity
    120.226
    Anticipated Capacity
    113.782
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Storage - Pumped
    Category
    Existing Generating CMU
    Storage Facility
    Yes
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Name of Applicant
    DRAX PUMPED STORAGE LIMITED
    Company Name
    N/A
    Parent Company
    Drax Hydro Limited
    Registered Holder
    DRAX PUMPED STORAGE LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2024-20CRU2-001
    Agreement Term
    1
    _id
    10895
    CMU ID
    20CRU2
    Auction
    Capacity Auction
    Auction Name
    2024-25 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Cruachan Unit 2
    Name of Applicant
    DRAX PUMPED STORAGE LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2021-04-19
    Auction Acquired Capacity Obligation
    113.782
    Secondary Trading Contact - Telephone
    '+441757618381
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2024/2025
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2024-25T-42024-25 (T-4) Four Year Ahead Capacity Auction
    113.78 MW Prequalified
    Component ID:Not available
    View Details: Location Page
    Capacity: 113.78 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NN 077 268
    • Location and Post Code: Lochawe, Dalmally, Argyll, PA33 1AN, Scotland
    • Generating Technology Class: Storage (Duration 12h)
    • Description of CMU Components: Unit 2 Cruachan pumped storage hydro plant
    CMU 20CRU4
    95.288 DRAX PUMPED STORAGE …
    Prequalified
  • ✓ Prequalified
  • 2024-25
    Capacity Information
    De-Rated Capacity
    95.288
    Connection/DSR Capacity
    100.685
    Anticipated Capacity
    95.288
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Storage - Pumped
    Category
    Existing Generating CMU
    Storage Facility
    Yes
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Name of Applicant
    DRAX PUMPED STORAGE LIMITED
    Company Name
    N/A
    Parent Company
    Drax Hydro Limited
    Registered Holder
    DRAX PUMPED STORAGE LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2024-20CRU4-001
    Agreement Term
    1
    _id
    10897
    CMU ID
    20CRU4
    Auction
    Capacity Auction
    Auction Name
    2024-25 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Cruachan Unit 4
    Name of Applicant
    DRAX PUMPED STORAGE LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2021-04-19
    Auction Acquired Capacity Obligation
    95.288
    Secondary Trading Contact - Telephone
    '+441757618381
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2024/2025
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2024-25T-42024-25 (T-4) Four Year Ahead Capacity Auction
    95.29 MW Prequalified
    Component ID:Not available
    View Details: Location Page
    Capacity: 95.29 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NN 077 268
    • Location and Post Code: Lochawe, Dalmally, Argyll, PA33 1AN, Scotland
    • Generating Technology Class: Storage (Duration 12h)
    • Description of CMU Components: Unit 4 Cruachan pump storage hydro plant
    CMU 20CRU1
    114.214 DRAX PUMPED STORAGE …
    Prequalified (2)
  • ✓ Prequalified
  • ✓ Prequalified
  • 2024-25 2024-2025
    Capacity Information
    De-Rated Capacity
    114.214
    Connection/DSR Capacity
    120.683
    Anticipated Capacity
    114.214
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Storage - Pumped
    Category
    Existing Generating CMU
    Storage Facility
    Yes
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Name of Applicant
    DRAX PUMPED STORAGE LIMITED
    Company Name
    N/A
    Parent Company
    Drax Hydro Limited
    Registered Holder
    DRAX PUMPED STORAGE LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2024-20CRU1-001
    Agreement Term
    1
    _id
    10894
    CMU ID
    20CRU1
    Auction
    Capacity Auction
    Auction Name
    2024-25 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Cruachan Unit 1
    Name of Applicant
    DRAX PUMPED STORAGE LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2021-04-19
    Auction Acquired Capacity Obligation
    114.214
    Secondary Trading Contact - Telephone
    '+441757618381
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2024/2025
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2024-25T-42024-25 (T-4) Four Year Ahead Capacity Auction
    38.07 MW Prequalified
    Component ID:Not available
    View Details: Location Page
    Capacity: 38.07 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NN 077 268
    • Location and Post Code: Lochawe, Dalmally, Argyll, PA33 1AN, Scotland
    • Generating Technology Class: Storage (Duration 12h)
    • Description of CMU Components: Unit 1 Cruachan pumped storage hydro plant
    2024-25T-42024-25 (T-4) Four Year Ahead Capacity Auction
    38.07 MW Prequalified
    Component ID:Not available
    View Details: Location Page
    Capacity: 38.07 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NN 077 268
    • Location and Post Code: Lochawe, Dalmally, Argyll, PA33 1AN, Scotland
    • Generating Technology Class: Storage (Duration 12h)
    • Description of CMU Components: Unit 1 Cruachan pumped storage hydro plant
    CMU 19CRU4
    95.08 DRAX PUMPED STORAGE …
    Prequalified (4)
  • ✓ Prequalified
  • ✓ Prequalified
  • ✓ Prequalified
  • ✓ Prequalified
  • 2023-24 2021-2025
    Capacity Information
    De-Rated Capacity
    95.08
    Connection/DSR Capacity
    100
    Anticipated Capacity
    95.08
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Storage - Pumped
    Category
    Existing Generating CMU
    Storage Facility
    Yes
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Name of Applicant
    DRAX PUMPED STORAGE LIMITED
    Company Name
    N/A
    Parent Company
    Drax Hydro Limited
    Registered Holder
    DRAX PUMPED STORAGE LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2023-19CRU4-001
    Agreement Term
    1
    _id
    9380
    CMU ID
    19CRU4
    Auction
    Capacity Auction
    Auction Name
    2023-24 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Cruachan Unit 4
    Name of Applicant
    DRAX PUMPED STORAGE LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2020-04-17
    Auction Acquired Capacity Obligation
    95.08
    Secondary Trading Contact - Telephone
    '+441757618381
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2023/2024
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2023-24T-42023-24 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID:Not available
    View Details: Location Page
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NN 077 268
    • Location and Post Code: Lochawe, Dalmally, Argyll, PA33 1AN, Scotland
    • Generating Technology Class: Storage (Duration 12h)
    • Description of CMU Components: Unit 4 Cruachan pump storage hydro plant
    2023-24T-42023-24 (T-4) Four Year Ahead Capacity Auction
    47.54 MW Prequalified
    Component ID:Not available
    View Details: Location Page
    Capacity: 47.54 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NN 077 268
    • Location and Post Code: Lochawe, Dalmally, Argyll, PA33 1AN, Scotland
    • Generating Technology Class: Storage (Duration 12h)
    • Description of CMU Components: Unit 4 Cruachan pump storage hydro plant
    2022-23T-?2022-23 (T-3) Three Year Ahead Capacity Auction
    47.54 MW Prequalified
    Component ID:Not available
    View Details: Location Page
    Capacity: 47.54 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NN 077 268
    • Location and Post Code: Lochawe, Dalmally, Argyll, PA33 1AN, Scotland
    • Generating Technology Class: Storage (Duration 12h)
    • Description of CMU Components: Unit 4 Cruachan pump storage hydro plant
    2022-23T-?2022-23 (T-3) Three Year Ahead Capacity Auction
    Prequalified
    Component ID:Not available
    View Details: Location Page
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NN 077 268
    • Location and Post Code: Lochawe, Dalmally, Argyll, PA33 1AN, Scotland
    • Generating Technology Class: Storage (Duration 12h)
    • Description of CMU Components: Unit 4 Cruachan pump storage hydro plant
    CMU 19CRU1
    114.096 DRAX PUMPED STORAGE …
    Prequalified (2)
  • ✓ Prequalified
  • ✓ Prequalified
  • 2023-24 2022-2023
    Capacity Information
    De-Rated Capacity
    114.096
    Connection/DSR Capacity
    120
    Anticipated Capacity
    114.096
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Storage - Pumped
    Category
    Existing Generating CMU
    Storage Facility
    Yes
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Name of Applicant
    DRAX PUMPED STORAGE LIMITED
    Company Name
    N/A
    Parent Company
    Drax Hydro Limited
    Registered Holder
    DRAX PUMPED STORAGE LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2023-19CRU1-001
    Agreement Term
    1
    _id
    9377
    CMU ID
    19CRU1
    Auction
    Capacity Auction
    Auction Name
    2023-24 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Cruachan Unit 1
    Name of Applicant
    DRAX PUMPED STORAGE LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2020-04-17
    Auction Acquired Capacity Obligation
    114.096
    Secondary Trading Contact - Telephone
    '+441757618381
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2023/2024
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2023-24T-42023-24 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID:Not available
    View Details: Location Page
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NN 077 268
    • Location and Post Code: Lochawe, Dalmally, Argyll, PA33 1AN, Scotland
    • Generating Technology Class: Storage (Duration 12h)
    • Description of CMU Components: Unit 1 Cruachan pumped storage hydro plant
    2022-23T-?2022-23 (T-3) Three Year Ahead Capacity Auction
    Prequalified
    Component ID:Not available
    View Details: Location Page
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NN 077 268
    • Location and Post Code: Lochawe, Dalmally, Argyll, PA33 1AN, Scotland
    • Generating Technology Class: Storage (Duration 12h)
    • Description of CMU Components: Unit 1 Cruachan pumped storage hydro plant
    CMU 19CRU3
    95.08 DRAX PUMPED STORAGE …
    Prequalified (2)
  • ✓ Prequalified
  • ✓ Prequalified
  • 2023-24 2022-2023
    Capacity Information
    De-Rated Capacity
    95.08
    Connection/DSR Capacity
    100
    Anticipated Capacity
    95.08
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Storage - Pumped
    Category
    Existing Generating CMU
    Storage Facility
    Yes
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Name of Applicant
    DRAX PUMPED STORAGE LIMITED
    Company Name
    N/A
    Parent Company
    Drax Hydro Limited
    Registered Holder
    DRAX PUMPED STORAGE LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2023-19CRU3-001
    Agreement Term
    1
    _id
    9379
    CMU ID
    19CRU3
    Auction
    Capacity Auction
    Auction Name
    2023-24 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Cruachan Unit 3
    Name of Applicant
    DRAX PUMPED STORAGE LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2020-04-17
    Auction Acquired Capacity Obligation
    95.08
    Secondary Trading Contact - Telephone
    '+441757618381
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2023/2024
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2023-24T-42023-24 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID:Not available
    View Details: Location Page
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NN 077 268
    • Location and Post Code: Lochawe, Dalmally, Argyll, PA33 1AN, Scotland
    • Generating Technology Class: Storage (Duration 12h)
    • Description of CMU Components: Unit 3 Cruachan pump storage hydro plant
    2022-23T-?2022-23 (T-3) Three Year Ahead Capacity Auction(2 components)
    47.54 MW Prequalified
    Component ID: 21720
    View Details: Component Page Location Page
    Capacity: 47.54 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NN 077 268
    • Location and Post Code: Lochawe, Dalmally, Argyll, PA33 1AN, Scotland
    • Generating Technology Class: Storage (Duration 12h)
    • Description of CMU Components: Unit 3 Cruachan pump storage hydro plant
    CMU 19CRU2
    114.096 DRAX PUMPED STORAGE …
    Prequalified (3)
  • ✓ Prequalified
  • ✓ Prequalified
  • ✓ Prequalified
  • 2022-23 2020-2025
    Capacity Information
    De-Rated Capacity
    114.096
    Connection/DSR Capacity
    120
    Anticipated Capacity
    114.096
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Storage - Pumped
    Category
    Existing Generating CMU
    Storage Facility
    Yes
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Name of Applicant
    DRAX PUMPED STORAGE LIMITED
    Company Name
    N/A
    Parent Company
    Drax Hydro Limited
    Registered Holder
    DRAX PUMPED STORAGE LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2023-19CRU2-001
    Agreement Term
    1
    _id
    9378
    CMU ID
    19CRU2
    Auction
    Capacity Auction
    Auction Name
    2023-24 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Cruachan Unit 2
    Name of Applicant
    DRAX PUMPED STORAGE LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2020-04-17
    Auction Acquired Capacity Obligation
    114.096
    Secondary Trading Contact - Telephone
    '+441757618381
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2023/2024
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2022-23T-?2022-23 (T-3) Three Year Ahead Capacity Auction
    Prequalified
    Component ID:Not available
    View Details: Location Page
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NN 077 268
    • Location and Post Code: Lochawe, Dalmally, Argyll, PA33 1AN, Scotland
    • Generating Technology Class: Storage (Duration 12h)
    • Description of CMU Components: Unit 2 Cruachan pumped storage hydro plant
    2023-24T-42023-24 (T-4) Four Year Ahead Capacity Auction
    57.05 MW Prequalified
    Component ID:Not available
    View Details: Location Page
    Capacity: 57.05 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NN 077 268
    • Location and Post Code: Lochawe, Dalmally, Argyll, PA33 1AN, Scotland
    • Generating Technology Class: Storage (Duration 12h)
    • Description of CMU Components: Unit 2 Cruachan pumped storage hydro plant
    2023-24T-42023-24 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID:Not available
    View Details: Location Page
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NN 077 268
    • Location and Post Code: Lochawe, Dalmally, Argyll, PA33 1AN, Scotland
    • Generating Technology Class: Storage (Duration 12h)
    • Description of CMU Components: Unit 2 Cruachan pumped storage hydro plant
    CMU SP18CR
    420.288 DRAX PUMPED STORAGE …
    Prequalified
  • ✓ Prequalified
  • 2022-23
    Capacity Information
    De-Rated Capacity
    420.288
    Connection/DSR Capacity
    440
    Anticipated Capacity
    420.288
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Storage - Pumped
    Category
    Existing Generating CMU
    Storage Facility
    Yes
    Commercial Information
    Organization
    Name of Applicant
    DRAX PUMPED STORAGE LIMITED
    Company Name
    N/A
    Parent Company
    Drax Hydro Limited
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    No
    _id
    8710
    CMU ID
    SP18CR
    Auction
    Capacity Auction
    Auction Name
    2022-23 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Cruachan
    Name of Applicant
    DRAX PUMPED STORAGE LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Secondary Trading Contact - Telephone
    '+441757618381
    Auction Participation History
    2022-23T-42022-23 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID:Not available
    View Details: Location Page
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NN 077 268
    • Location and Post Code: Lochawe, Dalmally, Argyll, PA33 1AN, Scotland
    • Generating Technology Class: Storage (Duration 12h)
    • Description of CMU Components: Cruachan pumped storage hydro plant - Unit 1
    CMU SP17CR
    422.884 DRAX PUMPED STORAGE …
    Prequalified
  • ✓ Prequalified
  • 2021-22
    Capacity Information
    De-Rated Capacity
    422.884
    Connection/DSR Capacity
    440
    Anticipated Capacity
    422.884
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Storage - Pumped
    Category
    Existing Generating CMU
    Storage Facility
    Yes
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Name of Applicant
    DRAX PUMPED STORAGE LIMITED
    Company Name
    N/A
    Parent Company
    Drax Hydro Limited
    Registered Holder
    DRAX PUMPED STORAGE LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2021-SP17CR-001
    Agreement Term
    1
    _id
    6176
    CMU ID
    SP17CR
    Auction
    Capacity Auction
    Auction Name
    2021-22 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Cruachan
    Name of Applicant
    DRAX PUMPED STORAGE LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2018-03-20
    Auction Acquired Capacity Obligation
    422.884
    Secondary Trading Contact - Telephone
    '+441757618381
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2021/2022
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2021-22T-42021-22 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID:Not available
    View Details: Location Page
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NN 077 268
    • Location and Post Code: Lochawe, Dalmally, Argyll, PA33 1AN, Scotland
    • Generating Technology Class: Storage
    • Description of CMU Components: Cruachan pumped storage hydro plant - Unit 1
    CMU SP16CR
    423.676 DRAX PUMPED STORAGE …
    Prequalified (2)
  • ✓ Prequalified
  • ✓ Prequalified
  • 2020-21 2017-2026
    Capacity Information
    De-Rated Capacity
    423.676
    Connection/DSR Capacity
    440
    Anticipated Capacity
    423.676
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Category
    Existing Generating CMU
    Storage Facility
    Yes
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Name of Applicant
    DRAX PUMPED STORAGE LIMITED
    Company Name
    N/A
    Registered Holder
    DRAX PUMPED STORAGE LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2020-SP16CR-001
    Agreement Term
    1
    _id
    4502
    CMU ID
    SP16CR
    Auction
    Capacity Auction
    Auction Name
    2020-21 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Cruachan
    Name of Applicant
    DRAX PUMPED STORAGE LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Date of Issue of Capacity Agreement
    2017-01-20
    Auction Acquired Capacity Obligation
    423.676
    Secondary Trading Contact - Telephone
    '+441757618381
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2020/2021
    Auction Participation History
    2020-21T-42020-21 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID:Not available
    View Details: Location Page
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NN 077 268
    • Location and Post Code: Lochawe, Dalmally, Argyll, PA33 1AN, Scotland
    • Description of CMU Components: Cruachan pumped storage hydro plant - Unit 1
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction(3 components)
    60.53 MW Prequalified
    Component ID: 106530
    View Details: Component Page Location Page
    Capacity: 60.53 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NN 077 268
    • Location and Post Code: Lochawe, Dalmally, Argyll, PA33 1AN, Scotland
    • Description of CMU Components: Cruachan pumped storage hydro plant - Unit 1
    Welcome to Capacity Market Search
    🗺️ 1 week free trial to explore all features!

    You can explore the basic features, but will need to register for continued access to premium features like the interactive map.

    Choose your contribution amount
    Unlimited access to all premium features

    Secure payment • No subscription • Lifetime access