Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help
Capacity Market Search
Menu
Home
  • Technologies
  • Companies
  • Locations
  • Map Explorer
  • FAQ
  • Trading Board
  • ChatGPT

  • Buy Me A Coffee
  • Help

  • Login
  • Register

  • Theme
  • Light
  • Dark
  • Auto
  • Understanding AuctionsSearch ResultsComponent GroupingSortingMap ViewContact Us

    Search Guide

    This registry provides comprehensive search capabilities across all Capacity Market components:

    • Company Search: Enter a company name (e.g., "Drax", "EDF") to see all their components
    • Location Search: Search by city, region, or postcode (e.g., "Manchester", "SW1")
    • CMU ID Search: Enter a specific CMU ID to find exact components
    • Technology Search: Enter technology types like "Hydro", "OCGT", or "Battery"

    The search is intelligent and will try to determine what you're looking for based on your query.

    You can combine search terms to narrow results, such as "London Battery" to find battery storage in London.

    Searches are not case-sensitive, and partial matches are supported (e.g., "Manch" will find "Manchester").

    Understanding Auctions

    The Capacity Market runs regular auctions where providers compete to secure agreements. There are two main types:

    • T-4 auctions: Held 4 years ahead of the delivery year
    • T-1 auctions: Held 1 year ahead to fine-tune capacity requirements

    Each auction results in agreements that specify how much capacity providers must deliver and the payment they'll receive.

    Auction years are displayed as badges (e.g., 2023-24) that you can click to view details for that specific auction year.

    The Capacity Market ensures the UK has sufficient electricity supply during periods of high demand or system stress.

    Providers receive payments for ensuring their capacity is available, creating a more stable and resilient electricity market.

    Search Results

    Search results are grouped by location and show important details about each component:

    • Active Components with auction years 2024-25 or later
    • In-Active Components with only auction years before 2024-25
    • Company Name Click to view all components for this company
    • Technology Click to search for this technology type
    • CMU: XXX Click to search for this CMU ID
    • Auction Year Click to view details for this specific auction

    Each result shows the component's capacity, location details, and participation in specific auction years.

    You can sort results by relevance, location, or date using the sort options.

    Pagination controls appear at the bottom when there are multiple pages of results.

    Component Grouping

    Components at the same location with the same description are grouped together to reduce duplication.

    Each group shows:

    • All CMU IDs for components at that location
    • All auction years, sorted with newest first
    • An Active/Inactive status based on auction years

    Grouping helps identify multi-year contracts and related components at the same site.

    The total capacity shown combines all components in the group.

    Components can be expanded to show individual details by clicking the expand icon.

    Sorting and Filtering

    You can sort search results by:

    • Relevance: Most relevant matches first
    • Location: Alphabetical order by location name
    • Date: By auction year (newest or oldest first)
    • Capacity: Highest or lowest capacity first

    Click the column headers to change sort order.

    You can filter results using the search refinements at the top of the results page:

    • Filter by technology type (e.g., only show batteries)
    • Filter by active status (show only active or inactive components)
    • Filter by auction year (show only components from specific auctions)

    Map Explorer & Map View

    We provide two map-based tools for exploring capacity market data:

    Map Explorer

    The Map Explorer is our advanced interactive mapping tool, specifically designed for comprehensive data exploration with:

    • Mobile-Optimized Interface: Responsive design that works perfectly on phones and tablets
    • Advanced Filtering: Filter by technology type, company, delivery year, and active status
    • Smart Sidebar: Desktop users get a dedicated filter panel, mobile users get collapsible filters
    • Full-Screen Map: Maximizes map space for detailed geographical analysis
    Search Map View

    The Search Map View combines search functionality with map visualization, offering:

    • Search-First Approach: Start with text searches, then visualize results on the map
    • Integrated Results: Search results and map display work together
    • Performance Optimized: Streamlined for fast search result mapping

    Both tools provide a visual representation of capacity distribution across the UK, but serve different exploration needs.

    Map Features:
    • Technology Colors: Different technology types are shown with distinct colors on the map for easy identification:
      GasDSRNuclearCHPSolarWind
      BatteryBiomassHydroInterconnectorCoalOther
    • Technology Legend: The map legend shows all available technologies with their corresponding colors and component counts
    • Search Results on Map: You can view any search results on the map by clicking "View on Map" from search results pages
    • Smart Clustering: Areas with multiple components are automatically grouped into clusters - click clusters to zoom in and see individual components
    • Interactive Markers: Click on individual markers to see detailed information about components at that location

    Use the map controls to zoom in on specific regions or areas of interest. The map automatically adjusts clustering based on your zoom level to provide the clearest view of capacity distribution.

    Contact Us

    We're here to help with any questions about the Capacity Market Registry.

    Email

    For general inquiries and support:

    For LLMs

    Complete programmatic access guide for LLMs:

    Search / All Locations / All Postcodes / NW10 / NW10 8JP

    Brentfield Road Willesden London NW10 8JP

    199.32 MW
    Total Capacity
    26
    Components
    Prequalified
    Prequalification
    * Latest auction year on record
    Descriptions:
    • Taylor's Lane OCGT GT Unit 2 This unit is fuelled by Gas Oil as specified by BS 6892 Class A2 Please see letter uploaded to metering section to explain determination of Connection Capacity
    • Taylor's Lane OCGT GT Unit 2 Unit fuelled by Diesel as specified in BS EN590
    • Taylor's Lane OCGT GT Unit 2 Unit fuelled by Gas Oil as specified in BS2869 Class A2
    • Taylor's Lane OCGT GT Unit 2 Unit fuelled by Gas Oil as specified in BS2869 Class A2 Please see letter uploaded to metering section that explains calculation of Connection Capacity
    • Taylor's Lane OCGT GT Unit 3 Unit fuelled by Diesel as specified in BS EN590
    Trading Contacts:
    UNIPER GLOBAL COMMODITIES SE
    '+49021145794440

    CMU Registry Data

    CMU TAL103
    63.456 UNIPER UK LIMITED
    Prequalified
  • ✓ Prequalified
  • 2028-29
    Capacity Information
    De-Rated Capacity
    63.456
    Connection/DSR Capacity
    67.875
    Anticipated Capacity
    63.456
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Diesel
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    Uniper Holding GmbH
    Registered Holder
    UNIPER GLOBAL COMMODITIES SE
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2028-TAL103-001
    Agreement Term
    1
    _id
    16045
    CMU ID
    TAL103
    Auction
    Capacity Auction
    Auction Name
    2028-29 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Taylor's Lane GT3
    Name of Applicant
    UNIPER GLOBAL COMMODITIES SE
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    Date of Issue of Capacity Agreement
    2025-04-04
    Auction Acquired Capacity Obligation
    63.456
    Secondary Trading Contact - Telephone
    '+49021145794440
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2028/2029
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2028-29T-42028-29 (T-4) Four Year Ahead Capacity Auction
    63.46 MW Prequalified
    Component ID: 410824
    Capacity: 63.46 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TQ 209 844
    • Location and Post Code: Brentfield Road Willesden London NW10 8JP
    • Primary Fuel of Component: Diesel
    • Generating Technology Class: Open Cycle Gas Turbine (OCGT)
    • Description of CMU Components: Taylor's Lane OCGT GT Unit 3 Unit fuelled by Diesel as specified in BS EN590
    CMU TAL102
    67.196 UNIPER UK LIMITED
    Prequalified
  • ✓ Prequalified
  • 2028-29
    Capacity Information
    De-Rated Capacity
    67.196
    Connection/DSR Capacity
    71.875
    Anticipated Capacity
    67.196
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Diesel
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    Uniper Holding GmbH
    Registered Holder
    UNIPER GLOBAL COMMODITIES SE
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2028-TAL102-001
    Agreement Term
    1
    _id
    16044
    CMU ID
    TAL102
    Auction
    Capacity Auction
    Auction Name
    2028-29 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Taylor's Lane GT2
    Name of Applicant
    UNIPER GLOBAL COMMODITIES SE
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    Date of Issue of Capacity Agreement
    2025-04-04
    Auction Acquired Capacity Obligation
    67.196
    Secondary Trading Contact - Telephone
    '+49021145794440
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2028/2029
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2028-29T-42028-29 (T-4) Four Year Ahead Capacity Auction
    67.20 MW Prequalified
    Component ID: 410818
    Capacity: 67.20 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TQ 209 844
    • Location and Post Code: Brentfield Road Willesden London NW10 8JP
    • Primary Fuel of Component: Diesel
    • Generating Technology Class: Open Cycle Gas Turbine (OCGT)
    • Description of CMU Components: Taylor's Lane OCGT GT Unit 2 Unit fuelled by Diesel as specified in BS EN590
    CMU TAYL92
    67.823 UNIPER GLOBAL COMMODITIES …
    Prequalified
  • ✓ Prequalified
  • 2027-28
    Capacity Information
    De-Rated Capacity
    67.823
    Connection/DSR Capacity
    71.885
    Anticipated Capacity
    67.932
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Diesel
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    Uniper Holding GmbH
    Registered Holder
    UNIPER GLOBAL COMMODITIES SE
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2027-TAYL92-001
    Agreement Term
    1
    _id
    14991
    CMU ID
    TAYL92
    Auction
    Capacity Auction
    Auction Name
    2027-28 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Taylor's Lane GT2
    Name of Applicant
    UNIPER GLOBAL COMMODITIES SE
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2024-04-08
    Auction Acquired Capacity Obligation
    67.823
    Secondary Trading Contact - Telephone
    '+49021145794440
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2027/2028
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2027-28T-42027-28 (T-4) Four Year Ahead Capacity Auction
    67.82 MW Prequalified
    Component ID: 331892
    Capacity: 67.82 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TQ 209 844
    • Location and Post Code: Brentfield Road Willesden London NW10 8JP
    • Primary Fuel of Component: Diesel
    • Generating Technology Class: Open Cycle Gas Turbine (OCGT)
    • Description of CMU Components: Taylor's Lane OCGT GT Unit 2 Unit fuelled by Diesel as specified in BS EN590
    CMU TAYL93
    64.049 UNIPER GLOBAL COMMODITIES …
    Prequalified
  • ✓ Prequalified
  • 2027-28
    Capacity Information
    De-Rated Capacity
    64.049
    Connection/DSR Capacity
    67.885
    Anticipated Capacity
    64.158
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Diesel
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    Uniper Holding GmbH
    Registered Holder
    UNIPER GLOBAL COMMODITIES SE
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2027-TAYL93-001
    Agreement Term
    1
    _id
    14992
    CMU ID
    TAYL93
    Auction
    Capacity Auction
    Auction Name
    2027-28 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Taylor's Lane GT3
    Name of Applicant
    UNIPER GLOBAL COMMODITIES SE
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2024-04-08
    Auction Acquired Capacity Obligation
    64.049
    Secondary Trading Contact - Telephone
    '+49021145794440
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2027/2028
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2027-28T-42027-28 (T-4) Four Year Ahead Capacity Auction
    64.05 MW Prequalified
    Component ID: 277852
    Capacity: 64.05 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TQ 209 844
    • Location and Post Code: Brentfield Road Willesden London NW10 8JP
    • Primary Fuel of Component: Diesel
    • Generating Technology Class: Open Cycle Gas Turbine (OCGT)
    • Description of CMU Components: Taylor's Lane OCGT GT Unit 3 Unit fuelled by Diesel as specified in BS EN590
    CMU TAYL82
    68.418 UNIPER GLOBAL COMMODITIES …
    Prequalified
  • ✓ Prequalified
  • 2026-27
    Capacity Information
    De-Rated Capacity
    68.418
    Connection/DSR Capacity
    71.883
    Anticipated Capacity
    68.53
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Diesel
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    Uniper Holding GmbH
    Registered Holder
    UNIPER GLOBAL COMMODITIES SE
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2026-TAYL82-001
    Agreement Term
    1
    _id
    14148
    CMU ID
    TAYL82
    Auction
    Capacity Auction
    Auction Name
    2026-27 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Taylor's Lane GT2
    Name of Applicant
    UNIPER GLOBAL COMMODITIES SE
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2023-03-31
    Auction Acquired Capacity Obligation
    68.418
    Secondary Trading Contact - Telephone
    '+49021145794440
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2026/2027
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2026-27T-42026-27 (T-4) Four Year Ahead Capacity Auction
    68.42 MW Prequalified
    Component ID: 64302
    Capacity: 68.42 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TQ 209 844
    • Location and Post Code: Brentfield Road Willesden London NW10 8JP
    • Generating Technology Class: Open Cycle Gas Turbine (OCGT)
    • Description of CMU Components: Taylor's Lane OCGT GT Unit 2 Unit fuelled by Diesel as specified in BS EN590
    CMU TAYL83
    64.611 UNIPER GLOBAL COMMODITIES …
    Prequalified
  • ✓ Prequalified
  • 2026-27
    Capacity Information
    De-Rated Capacity
    64.611
    Connection/DSR Capacity
    67.883
    Anticipated Capacity
    64.722
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Diesel
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    Uniper Holding GmbH
    Registered Holder
    UNIPER GLOBAL COMMODITIES SE
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2026-TAYL83-001
    Agreement Term
    1
    _id
    14149
    CMU ID
    TAYL83
    Auction
    Capacity Auction
    Auction Name
    2026-27 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Taylor's Lane GT3
    Name of Applicant
    UNIPER GLOBAL COMMODITIES SE
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2023-03-31
    Auction Acquired Capacity Obligation
    64.611
    Secondary Trading Contact - Telephone
    '+49021145794440
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2026/2027
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2026-27T-42026-27 (T-4) Four Year Ahead Capacity Auction
    64.61 MW Prequalified
    Component ID: 277394
    Capacity: 64.61 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TQ 209 844
    • Location and Post Code: Brentfield Road Willesden London NW10 8JP
    • Generating Technology Class: Open Cycle Gas Turbine (OCGT)
    • Description of CMU Components: Taylor's Lane OCGT GT Unit 3 Unit fuelled by Diesel as specified in BS EN590
    CMU TAYL72
    68.638 UNIPER GLOBAL COMMODITIES …
    Prequalified
  • ✓ Prequalified
  • 2025-26
    Capacity Information
    De-Rated Capacity
    68.638
    Connection/DSR Capacity
    71.895
    Anticipated Capacity
    68.738
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Diesel
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    Uniper Holding GmbH
    Registered Holder
    UNIPER GLOBAL COMMODITIES SE
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2025-TAYL72-001
    Agreement Term
    1
    _id
    13288
    CMU ID
    TAYL72
    Auction
    Capacity Auction
    Auction Name
    2025-26 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Taylor's Lane GT2
    Name of Applicant
    UNIPER GLOBAL COMMODITIES SE
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2022-04-01
    Auction Acquired Capacity Obligation
    68.638
    Secondary Trading Contact - Telephone
    '+49021145794440
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2025/2026
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2025-26T-42025-26 (T-4) Four Year Ahead Capacity Auction
    68.64 MW Prequalified
    Component ID: 584
    Capacity: 68.64 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TQ 209 844
    • Location and Post Code: Brentfield Road Willesden London NW10 8JP
    • Generating Technology Class: Open Cycle Gas Turbine (OCGT)
    • Description of CMU Components: Taylor's Lane OCGT GT Unit 2 Unit fuelled by Gas Oil as specified in BS2869 Class A2
    CMU TAYL73
    64.819 UNIPER GLOBAL COMMODITIES …
    Prequalified
  • ✓ Prequalified
  • 2025-26
    Capacity Information
    De-Rated Capacity
    64.819
    Connection/DSR Capacity
    67.895
    Anticipated Capacity
    64.92
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Diesel
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    Uniper Holding GmbH
    Registered Holder
    UNIPER GLOBAL COMMODITIES SE
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2025-TAYL73-001
    Agreement Term
    1
    _id
    13289
    CMU ID
    TAYL73
    Auction
    Capacity Auction
    Auction Name
    2025-26 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Taylor's Lane GT3
    Name of Applicant
    UNIPER GLOBAL COMMODITIES SE
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2022-04-01
    Auction Acquired Capacity Obligation
    64.819
    Secondary Trading Contact - Telephone
    '+49021145794440
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2025/2026
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2025-26T-42025-26 (T-4) Four Year Ahead Capacity Auction
    64.82 MW Prequalified
    Component ID: 184839
    Capacity: 64.82 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TQ 209 844
    • Location and Post Code: Brentfield Road Willesden London NW10 8JP
    • Generating Technology Class: Open Cycle Gas Turbine (OCGT)
    • Description of CMU Components: Taylor's Lane OCGT GT Unit 3 Unit fuelled by Gas Oil as specified in BS 2869 Class A2
    CMU TAYL63
    62.74 UNIPER GLOBAL COMMODITIES …
    Prequalified
  • ✓ Prequalified
  • 2024-25
    Capacity Information
    De-Rated Capacity
    62.74
    Connection/DSR Capacity
    65.89
    Anticipated Capacity
    62.845
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Diesel
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    Uniper Holding GmbH
    Registered Holder
    UNIPER GLOBAL COMMODITIES SE
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2024-TAYL63-001
    Agreement Term
    1
    _id
    11786
    CMU ID
    TAYL63
    Auction
    Capacity Auction
    Auction Name
    2024-25 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Taylor's Lane GT3
    Name of Applicant
    UNIPER GLOBAL COMMODITIES SE
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2021-04-19
    Auction Acquired Capacity Obligation
    62.74
    Secondary Trading Contact - Telephone
    '+49021145794440
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2024/2025
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2024-25T-42024-25 (T-4) Four Year Ahead Capacity Auction
    62.74 MW Prequalified
    Component ID: 140677
    Capacity: 62.74 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TQ 209 844
    • Location and Post Code: Brentfield Road Willesden London NW10 8JP
    • Generating Technology Class: Open Cycle Gas Turbine (OCGT)
    • Description of CMU Components: Taylor's Lane OCGT GT Unit 3 Unit fuelled by Gas Oil as specified in BS 2869 Class A2
    CMU TAYL62
    70.358 UNIPER GLOBAL COMMODITIES …
    Prequalified
  • ✓ Prequalified
  • 2024-25
    Capacity Information
    De-Rated Capacity
    70.358
    Connection/DSR Capacity
    73.89
    Anticipated Capacity
    70.463
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Diesel
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    Uniper Holding GmbH
    Registered Holder
    UNIPER GLOBAL COMMODITIES SE
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2024-TAYL62-001
    Agreement Term
    1
    _id
    11785
    CMU ID
    TAYL62
    Auction
    Capacity Auction
    Auction Name
    2024-25 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Taylor's Lane GT2
    Name of Applicant
    UNIPER GLOBAL COMMODITIES SE
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2021-04-19
    Auction Acquired Capacity Obligation
    70.358
    Secondary Trading Contact - Telephone
    '+49021145794440
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2024/2025
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2024-25T-42024-25 (T-4) Four Year Ahead Capacity Auction
    70.36 MW Prequalified
    Component ID: 54728
    Capacity: 70.36 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TQ 209 844
    • Location and Post Code: Brentfield Road Willesden London NW10 8JP
    • Generating Technology Class: Open Cycle Gas Turbine (OCGT)
    • Description of CMU Components: Taylor's Lane OCGT GT Unit 2 Unit fuelled by Gas Oil as specified in BS2869 Class A2
    CMU TAYL52
    70.166 UNIPER GLOBAL COMMODITIES …
    Prequalified (2)
  • ✓ Prequalified
  • ✓ Prequalified
  • 2023-24 2022-2023
    Capacity Information
    De-Rated Capacity
    70.166
    Connection/DSR Capacity
    73.874
    Anticipated Capacity
    70.285
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Diesel
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    Uniper Holding GmbH
    Registered Holder
    UNIPER GLOBAL COMMODITIES SE
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2023-TAYL52-001
    Agreement Term
    1
    _id
    10314
    CMU ID
    TAYL52
    Auction
    Capacity Auction
    Auction Name
    2023-24 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Taylor's Lane GT2
    Name of Applicant
    UNIPER GLOBAL COMMODITIES SE
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2020-04-17
    Auction Acquired Capacity Obligation
    70.166
    Secondary Trading Contact - Telephone
    '+49021145794440
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2023/2024
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2023-24T-42023-24 (T-4) Four Year Ahead Capacity Auction
    35.08 MW Prequalified
    Component ID: 220203
    Capacity: 35.08 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TQ 209 844
    • Location and Post Code: Brentfield Road Willesden London NW10 8JP
    • Generating Technology Class: Open Cycle Gas Turbine (OCGT)
    • Description of CMU Components: Taylor's Lane OCGT GT Unit 2 Unit fuelled by Gas Oil as specified in BS2869 Class A2
    2022-23T-?2022-23 (T-3) Three Year Ahead Capacity Auction
    35.08 MW Prequalified
    Component ID: 366793
    Capacity: 35.08 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TQ 209 844
    • Location and Post Code: Brentfield Road Willesden London NW10 8JP
    • Generating Technology Class: Open Cycle Gas Turbine (OCGT)
    • Description of CMU Components: Taylor's Lane OCGT GT Unit 2 Unit fuelled by Gas Oil as specified in BS2869 Class A2
    CMU TAYL53
    62.567 UNIPER GLOBAL COMMODITIES …
    Prequalified (2)
  • ✓ Prequalified
  • ✓ Prequalified
  • 2023-24 2022-2023
    Capacity Information
    De-Rated Capacity
    62.567
    Connection/DSR Capacity
    65.874
    Anticipated Capacity
    62.687
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Diesel
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    Uniper Holding GmbH
    Registered Holder
    UNIPER GLOBAL COMMODITIES SE
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2023-TAYL53-001
    Agreement Term
    1
    _id
    10315
    CMU ID
    TAYL53
    Auction
    Capacity Auction
    Auction Name
    2023-24 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Taylor's Lane GT3
    Name of Applicant
    UNIPER GLOBAL COMMODITIES SE
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2020-04-17
    Auction Acquired Capacity Obligation
    62.567
    Secondary Trading Contact - Telephone
    '+49021145794440
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2023/2024
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2023-24T-42023-24 (T-4) Four Year Ahead Capacity Auction
    31.28 MW Prequalified
    Component ID: 140651
    Capacity: 31.28 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TQ 209 844
    • Location and Post Code: Brentfield Road Willesden London NW10 8JP
    • Generating Technology Class: Open Cycle Gas Turbine (OCGT)
    • Description of CMU Components: Taylor's Lane OCGT GT Unit 3 Unit fuelled by Gas Oil as specified in BS 2869 Class A2
    2022-23T-?2022-23 (T-3) Three Year Ahead Capacity Auction
    31.28 MW Prequalified
    Component ID: 331937
    Capacity: 31.28 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TQ 209 844
    • Location and Post Code: Brentfield Road Willesden London NW10 8JP
    • Generating Technology Class: Open Cycle Gas Turbine (OCGT)
    • Description of CMU Components: Taylor's Lane OCGT GT Unit 3 Unit fuelled by Gas Oil as specified in BS 2869 Class A2
    CMU TAYL43
    62.673 UNIPER GLOBAL COMMODITIES …
    Prequalified
  • ✓ Prequalified
  • 2022-23
    Capacity Information
    De-Rated Capacity
    62.673
    Connection/DSR Capacity
    65.875
    Anticipated Capacity
    62.792
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Diesel
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Organization
    Company Name
    N/A
    Parent Company
    Uniper Holding GmbH
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    No
    _id
    8804
    CMU ID
    TAYL43
    Auction
    Capacity Auction
    Auction Name
    2022-23 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Taylor's Lane GT3
    Name of Applicant
    UNIPER GLOBAL COMMODITIES SE
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Secondary Trading Contact - Telephone
    '+49021145794440
    Auction Participation History
    2022-23T-42022-23 (T-4) Four Year Ahead Capacity Auction
    62.67 MW Prequalified
    Component ID: 159046
    Capacity: 62.67 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TQ 209 844
    • Location and Post Code: Brentfield Road Willesden London NW10 8JP
    • Generating Technology Class: Open Cycle Gas Turbine (OCGT)
    • Description of CMU Components: Taylor's Lane OCGT GT Unit 3 Unit fuelled by Gas Oil as specified in BS 2869 Class A2
    CMU TAYL42
    70.285 UNIPER GLOBAL COMMODITIES …
    Prequalified
  • ✓ Prequalified
  • 2022-23
    Capacity Information
    De-Rated Capacity
    70.285
    Connection/DSR Capacity
    73.875
    Anticipated Capacity
    70.404
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Diesel
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Organization
    Company Name
    N/A
    Parent Company
    Uniper Holding GmbH
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    No
    _id
    8803
    CMU ID
    TAYL42
    Auction
    Capacity Auction
    Auction Name
    2022-23 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Taylor's Lane GT2
    Name of Applicant
    UNIPER GLOBAL COMMODITIES SE
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Secondary Trading Contact - Telephone
    '+49021145794440
    Auction Participation History
    2022-23T-42022-23 (T-4) Four Year Ahead Capacity Auction
    70.29 MW Prequalified
    Component ID: 114309
    Capacity: 70.29 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TQ 209 844
    • Location and Post Code: Brentfield Road Willesden London NW10 8JP
    • Generating Technology Class: Open Cycle Gas Turbine (OCGT)
    • Description of CMU Components: Taylor's Lane OCGT GT Unit 2 Unit fuelled by Gas Oil as specified in BS2869 Class A2
    CMU TAYL32
    70.025 UNIPER GLOBAL COMMODITIES …
    Prequalified
  • ✓ Prequalified
  • 2021-22
    Capacity Information
    De-Rated Capacity
    70.025
    Connection/DSR Capacity
    73.858
    Anticipated Capacity
    70.159
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Diesel
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    Uniper Holding GmbH
    Registered Holder
    UNIPER GLOBAL COMMODITIES SE
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2021-TAYL32-001
    Agreement Term
    1
    _id
    6275
    CMU ID
    TAYL32
    Auction
    Capacity Auction
    Agent Name
    Applications and Correspondence on behalf of UGC SE
    Auction Name
    2021-22 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Taylor's Lane GT2 (140 MW TEC)
    Name of Applicant
    UNIPER GLOBAL COMMODITIES SE
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2018-03-20
    Auction Acquired Capacity Obligation
    70.025
    Secondary Trading Contact - Telephone
    '+49021145794440
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2021/2022
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2021-22T-42021-22 (T-4) Four Year Ahead Capacity Auction
    70.03 MW Prequalified
    Component ID: 149911
    Capacity: 70.03 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TQ 209 844
    • Location and Post Code: Brentfield Road Willesden London NW10 8JP
    • Generating Technology Class: OCGT and Reciprocating Engines (Fuel Type - Diesel)
    • Description of CMU Components: Taylor's Lane OCGT GT Unit 2 Unit fuelled by Gas Oil as specified in BS2869 Class A2 Please see letter uploaded to metering section that explains calculation of Connection Capacity
    CMU TAYL33
    62.44 UNIPER GLOBAL COMMODITIES …
    Prequalified
  • ✓ Prequalified
  • 2021-22
    Capacity Information
    De-Rated Capacity
    62.44
    Connection/DSR Capacity
    65.858
    Anticipated Capacity
    62.575
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Diesel
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    Uniper Holding GmbH
    Registered Holder
    UNIPER GLOBAL COMMODITIES SE
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2021-TAYL33-001
    Agreement Term
    1
    _id
    6276
    CMU ID
    TAYL33
    Auction
    Capacity Auction
    Agent Name
    Applications and Correspondence on behalf of UGC SE
    Auction Name
    2021-22 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Taylor's Lane GT3 (140 MW TEC)
    Name of Applicant
    UNIPER GLOBAL COMMODITIES SE
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2018-03-20
    Auction Acquired Capacity Obligation
    62.44
    Secondary Trading Contact - Telephone
    '+49021145794440
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2021/2022
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2021-22T-42021-22 (T-4) Four Year Ahead Capacity Auction
    62.44 MW Prequalified
    Component ID: 184383
    Capacity: 62.44 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TQ 209 844
    • Location and Post Code: Brentfield Road Willesden London NW10 8JP
    • Generating Technology Class: OCGT and Reciprocating Engines (Fuel Type - Diesel)
    • Description of CMU Components: Taylor's Lane OCGT GT Unit 3 Unit fuelled by Gas Oil as specified in BS 2869 Class A2 Please see letter uploaded to metering section that explains the calculation of Connection Capacity
    CMU TAYL23
    62.152 UNIPER GLOBAL COMMODITIES …
    Prequalified
  • ✓ Prequalified
  • 2020-21
    Capacity Information
    De-Rated Capacity
    62.152
    Connection/DSR Capacity
    66
    Anticipated Capacity
    62.152
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Registered Holder
    UNIPER GLOBAL COMMODITIES SE
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2020-TAYL23-001
    Agreement Term
    1
    _id
    4585
    CMU ID
    TAYL23
    Auction
    Capacity Auction
    Auction Name
    2020-21 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Taylor's Lane GT3 (140 MW TEC)
    Name of Applicant
    UNIPER GLOBAL COMMODITIES SE
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Date of Issue of Capacity Agreement
    2017-01-20
    Auction Acquired Capacity Obligation
    62.152
    Secondary Trading Contact - Telephone
    '+49021145794440
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2020/2021
    Auction Participation History
    2020-21T-42020-21 (T-4) Four Year Ahead Capacity Auction
    62.15 MW Prequalified
    Component ID: 149439
    Capacity: 62.15 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TQ 209 844
    • Location and Post Code: Brentfield Road Willesden London NW10 8JP
    • Description of CMU Components: Taylor's Lane OCGT GT Unit 3 Unit fuelled by Gas Oil as specified in BS 2869 Class A2 Please see letter uploaded to metering section that explains the calculation of Connection Capacity
    CMU TAYL22
    69.686 UNIPER GLOBAL COMMODITIES …
    Prequalified
  • ✓ Prequalified
  • 2020-21
    Capacity Information
    De-Rated Capacity
    69.686
    Connection/DSR Capacity
    74
    Anticipated Capacity
    69.686
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Registered Holder
    UNIPER GLOBAL COMMODITIES SE
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2020-TAYL22-001
    Agreement Term
    1
    _id
    4584
    CMU ID
    TAYL22
    Auction
    Capacity Auction
    Auction Name
    2020-21 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Taylor's Lane GT2 (140 MW TEC)
    Name of Applicant
    UNIPER GLOBAL COMMODITIES SE
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Date of Issue of Capacity Agreement
    2017-01-20
    Auction Acquired Capacity Obligation
    69.686
    Secondary Trading Contact - Telephone
    '+49021145794440
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2020/2021
    Auction Participation History
    2020-21T-42020-21 (T-4) Four Year Ahead Capacity Auction
    69.69 MW Prequalified
    Component ID: 291855
    Capacity: 69.69 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TQ 209 844
    • Location and Post Code: Brentfield Road Willesden London NW10 8JP
    • Description of CMU Components: Taylor's Lane OCGT GT Unit 2 Unit fuelled by Gas Oil as specified in BS2869 Class A2 Please see letter uploaded to metering section that explains calculation of Connection Capacity
    CMU TAYL13
    46.148 UNIPER GLOBAL COMMODITIES …
    Prequalified
  • ✓ Prequalified
  • 2017-18
    Capacity Information
    De-Rated Capacity
    46.148
    Connection/DSR Capacity
    49.01
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Registered Holder
    UNIPER GLOBAL COMMODITIES SE
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2017-TAYL13-001
    Agreement Term
    1
    _id
    796
    CMU ID
    TAYL13
    Auction
    Capacity Auction
    Auction Name
    2017-18 (T-1) One Year Ahead Capacity Auction
    CM Unit Name
    Taylor's Lane GT3 (99MW TEC)
    Name of Applicant
    UNIPER GLOBAL COMMODITIES SE
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Date of Issue of Capacity Agreement
    2017-02-15
    Auction Acquired Capacity Obligation
    46.148
    Secondary Trading Contact - Telephone
    '+49021145794440
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2017/2018
    Auction Participation History
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 626128
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TQ 209 844
    • Location and Post Code: Brentfield Road Willesden London NW10 8JP
    • Description of CMU Components: Taylor's Lane OCGT GT Unit 3 Unit fuelled by Gas Oil as specified in BS 2869 Class A2 Please see letter uploaded to metering section that explains the calculation of Connection Capacity
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 724904
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TQ 209 844
    • Location and Post Code: Brentfield Road Willesden London NW10 8JP
    • Description of CMU Components: Taylor's Lane OCGT GT Unit 3 Unit fuelled by Gas Oil as specified in BS 2869 Class A2 Please see letter uploaded to metering section that explains the calculation of Connection Capacity
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 577370
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TQ 209 844
    • Location and Post Code: Brentfield Road Willesden London NW10 8JP
    • Description of CMU Components: Taylor's Lane OCGT GT Unit 3 Unit fuelled by Gas Oil as specified in BS 2869 Class A2 Please see letter uploaded to metering section that explains the calculation of Connection Capacity
    CMU TAYL12
    46.614 UNIPER GLOBAL COMMODITIES …
    Prequalified
  • ✓ Prequalified
  • 2017-18
    Capacity Information
    De-Rated Capacity
    46.614
    Connection/DSR Capacity
    49.5
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Registered Holder
    UNIPER GLOBAL COMMODITIES SE
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2017-TAYL12-001
    Agreement Term
    1
    _id
    795
    CMU ID
    TAYL12
    Auction
    Capacity Auction
    Auction Name
    2017-18 (T-1) One Year Ahead Capacity Auction
    CM Unit Name
    Taylor's Lane GT2 (99MW TEC)
    Name of Applicant
    UNIPER GLOBAL COMMODITIES SE
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Date of Issue of Capacity Agreement
    2017-02-15
    Auction Acquired Capacity Obligation
    46.614
    Secondary Trading Contact - Telephone
    '+49021145794440
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2017/2018
    Auction Participation History
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 542067
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TQ 209 844
    • Location and Post Code: Brentfield Road Willesden London NW10 8JP
    • Description of CMU Components: Taylor's Lane OCGT GT Unit 2 This unit is fuelled by Gas Oil as specified by BS 6892 Class A2 Please see letter uploaded to metering section to explain determination of Connection Capacity
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 590825
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TQ 209 844
    • Location and Post Code: Brentfield Road Willesden London NW10 8JP
    • Description of CMU Components: Taylor's Lane OCGT GT Unit 2 This unit is fuelled by Gas Oil as specified by BS 6892 Class A2 Please see letter uploaded to metering section to explain determination of Connection Capacity
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 689601
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TQ 209 844
    • Location and Post Code: Brentfield Road Willesden London NW10 8JP
    • Description of CMU Components: Taylor's Lane OCGT GT Unit 2 This unit is fuelled by Gas Oil as specified by BS 6892 Class A2 Please see letter uploaded to metering section to explain determination of Connection Capacity
    Welcome to Capacity Market Search
    🗺️ 1 week free trial to explore all features!

    You can explore the basic features, but will need to register for continued access to premium features like the interactive map.

    Choose your contribution amount
    Unlimited access to all premium features

    Secure payment • No subscription • Lifetime access