13 unique locations (82 components)

160 Corporation Road, Newport, Gwent, NP19 0WF (8 components)
• 0.39MW Battery Storage located at Newport Bus depot (2)
• Bus depot site
Active • 2027-28 (T-4), 2026-27 (T-4) ...
CORPORATION ROAD NEWPORT GWENT NP19 4XE (1 component)

Turn-down CMU with a de-rated volume of 0.869

Inactive • 2017-18 (TR)
CORPORATION ROAD NEWPORT NP19 4XF (2 components)

Gas fired CHP at Corporation Road (2)

Active • 2025-26 (T-1), 2024-25 (T-1)
3.34 MW
Land at Traston Road, Newport NP19 4PW (1 component)

The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. …

Inactive • 2022-23 (T-4)
Land at Traston Road, Newport, NP19 4PW (1 component)

Grid-scale energy storage system based on Lithium Ion, capable of exporting 20MW for a 1 hour duration installed on designated land within a compound at Newport

Active • 2025-26 (T-4)
Land East Of Clarke Energy Production, Traston Road, Newport NP19 4PW (2 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2017-18 (T-1)
Liberty Steel Newport, Coroporation Road, Newport, NP19 4XE (4 components)
• 6 diesel generators built on an existing industrial site, although alternative fuels are being tested before a final decision is … (2)
• 6 diesel generators built on an existing industrial site although alternative fuel sources are also being considered.
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Liberty Steel Newport, Corporation Road, Newport, NP19 4XE (1 component)

A series of diesel fired generators, although other technologies are also being considered.

Inactive • 2020-21 (T-4)
Llanwern Steelworks Newport Gwent NP19 4QZ United Kingdom (22 components)
• Industrial Steelmaking / Manufacturing Site. The DSR capacity (MW) is the proven DSR capacity. The DSR Test Certificate applies to … (2)
• Industrial Steelmaking / Manufacturing Site. The DSR capacity (MW) is the proven DSR capacity. The DSR Test Certificate applies to … (2)
• Industrial Steelmaking / Manufacturing Site. The DSR capacity (MW) is the proven DSR capacity. The DSR Test Certificate applies to …
Active • 2025-26 (T-1), 2024-25 (T-1) ...
Llanwern Steelworks Newport Gwent NP19 4QZ United Kingdom (17 components)
• Industrial Steelmaking / Manufacturing Site. The DSR capacity (MW) is the proven DSR capacity. The DSR Test Certificate applies to … (2)
• Industrial Steelmaking / Manufacturing Site. The DSR capacity (MW) is the proven DSR capacity. The DSR Test Certificate applies to …
Active • 2025-26 (T-1), 2024-25 (T-1) ...
Traston Road, Newport, NP19 4PW (1 component)

A 18MW distribution connected energy storage plant comprising of batteries

Active • 2025-26 (T-4)
Traston Road, Off Corporation Road, Newport , Gwent, NP19 4RQ (18 components)

The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.30 MW
UK Power Reserve, Traston Road, Newport, South Wales, NP19 4RQ (4 components)
• CMU ID 22NEW4, a new build battery storage CMU
• CMU ID 23NEW1, a new build battery storage CMU
• CMU ID 24NEW1, a new build battery storage CMU
Active • 2026-27 (T-4), 2025-26 (T-1) ...
8.47 MW