Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help
Capacity Market Search
Menu
Home
  • Technologies
  • Companies
  • Locations
  • Map Explorer
  • FAQ
  • Trading Board
  • ChatGPT

  • Buy Me A Coffee
  • Help

  • Login
  • Register

  • Theme
  • Light
  • Dark
  • Auto
  • Understanding AuctionsSearch ResultsComponent GroupingSortingMap ViewContact Us

    Search Guide

    This registry provides comprehensive search capabilities across all Capacity Market components:

    • Company Search: Enter a company name (e.g., "Drax", "EDF") to see all their components
    • Location Search: Search by city, region, or postcode (e.g., "Manchester", "SW1")
    • CMU ID Search: Enter a specific CMU ID to find exact components
    • Technology Search: Enter technology types like "Hydro", "OCGT", or "Battery"

    The search is intelligent and will try to determine what you're looking for based on your query.

    You can combine search terms to narrow results, such as "London Battery" to find battery storage in London.

    Searches are not case-sensitive, and partial matches are supported (e.g., "Manch" will find "Manchester").

    Understanding Auctions

    The Capacity Market runs regular auctions where providers compete to secure agreements. There are two main types:

    • T-4 auctions: Held 4 years ahead of the delivery year
    • T-1 auctions: Held 1 year ahead to fine-tune capacity requirements

    Each auction results in agreements that specify how much capacity providers must deliver and the payment they'll receive.

    Auction years are displayed as badges (e.g., 2023-24) that you can click to view details for that specific auction year.

    The Capacity Market ensures the UK has sufficient electricity supply during periods of high demand or system stress.

    Providers receive payments for ensuring their capacity is available, creating a more stable and resilient electricity market.

    Search Results

    Search results are grouped by location and show important details about each component:

    • Active Components with auction years 2024-25 or later
    • In-Active Components with only auction years before 2024-25
    • Company Name Click to view all components for this company
    • Technology Click to search for this technology type
    • CMU: XXX Click to search for this CMU ID
    • Auction Year Click to view details for this specific auction

    Each result shows the component's capacity, location details, and participation in specific auction years.

    You can sort results by relevance, location, or date using the sort options.

    Pagination controls appear at the bottom when there are multiple pages of results.

    Component Grouping

    Components at the same location with the same description are grouped together to reduce duplication.

    Each group shows:

    • All CMU IDs for components at that location
    • All auction years, sorted with newest first
    • An Active/Inactive status based on auction years

    Grouping helps identify multi-year contracts and related components at the same site.

    The total capacity shown combines all components in the group.

    Components can be expanded to show individual details by clicking the expand icon.

    Sorting and Filtering

    You can sort search results by:

    • Relevance: Most relevant matches first
    • Location: Alphabetical order by location name
    • Date: By auction year (newest or oldest first)
    • Capacity: Highest or lowest capacity first

    Click the column headers to change sort order.

    You can filter results using the search refinements at the top of the results page:

    • Filter by technology type (e.g., only show batteries)
    • Filter by active status (show only active or inactive components)
    • Filter by auction year (show only components from specific auctions)

    Map Explorer & Map View

    We provide two map-based tools for exploring capacity market data:

    Map Explorer

    The Map Explorer is our advanced interactive mapping tool, specifically designed for comprehensive data exploration with:

    • Mobile-Optimized Interface: Responsive design that works perfectly on phones and tablets
    • Advanced Filtering: Filter by technology type, company, delivery year, and active status
    • Smart Sidebar: Desktop users get a dedicated filter panel, mobile users get collapsible filters
    • Full-Screen Map: Maximizes map space for detailed geographical analysis
    Search Map View

    The Search Map View combines search functionality with map visualization, offering:

    • Search-First Approach: Start with text searches, then visualize results on the map
    • Integrated Results: Search results and map display work together
    • Performance Optimized: Streamlined for fast search result mapping

    Both tools provide a visual representation of capacity distribution across the UK, but serve different exploration needs.

    Map Features:
    • Technology Colors: Different technology types are shown with distinct colors on the map for easy identification:
      GasDSRNuclearCHPSolarWind
      BatteryBiomassHydroInterconnectorCoalOther
    • Technology Legend: The map legend shows all available technologies with their corresponding colors and component counts
    • Search Results on Map: You can view any search results on the map by clicking "View on Map" from search results pages
    • Smart Clustering: Areas with multiple components are automatically grouped into clusters - click clusters to zoom in and see individual components
    • Interactive Markers: Click on individual markers to see detailed information about components at that location

    Use the map controls to zoom in on specific regions or areas of interest. The map automatically adjusts clustering based on your zoom level to provide the clearest view of capacity distribution.

    Contact Us

    We're here to help with any questions about the Capacity Market Registry.

    Email

    For general inquiries and support:

    For LLMs

    Complete programmatic access guide for LLMs:

    Search / All Locations / All Postcodes / ME3 / ME3 0AG

    Medway Power Station, Rochester, Medway, ME3 0AG

    702.50 MW
    Total Capacity
    ME3 0AG
    Postcode
    25
    Components
    Active*
    2028-29
    Prequalified
    Prequalification
    * Latest auction year on record
    Descriptions:
    • Medway
    • Medway CCGT
    Trading Contacts:

    CMU Registry Data

    CMU MEDP-1
    623 Medway Power Limited
    Prequalified (7)
  • ✓ Prequalified
  • ✓ Prequalified
  • ✓ Prequalified
  • ✓ Prequalified
  • ✓ Prequalified
  • ✓ Prequalified
  • ✓ Prequalified
  • 2028-29 2021-2028
    Capacity Information
    De-Rated Capacity
    623
    Connection/DSR Capacity
    700
    Anticipated Capacity
    623
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Category
    Existing Generating CMU
    Commercial Information
    Termination Fee Rate 1
    £5,000/MW
    Termination Fee Rate 2
    £25,000/MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Registered Holder
    SSE plc
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-A-T-4-2019-MEDP-1-00001
    Agreement Term
    1
    _id
    3059
    CMU ID
    MEDP-1
    Auction
    Capacity Auction
    Auction Name
    2019-20 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Medway
    Name of Applicant
    Medway Power Limited
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    Date of Issue of Capacity Agreement
    2016-01-13
    Auction Acquired Capacity Obligation
    623
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2019/2020
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2028-29T-42028-29 (T-4) Four Year Ahead Capacity Auction
    31.15 MW Prequalified
    Component ID: 493843
    Capacity: 31.15 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • De-Rated Capacity: 668.483
    • OS Grid Reference: TQ 871 746
    • Location and Post Code: Medway Power Station, Rochester, Medway, ME3 0AG
    • Connection / DSR Capacity: 735
    • Primary Fuel of Component: Gas
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Medway CCGT
    2028-29T-42028-29 (T-4) Four Year Ahead Capacity Auction
    31.15 MW Prequalified
    Component ID: 493850
    Capacity: 31.15 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • De-Rated Capacity: 668.483
    • OS Grid Reference: TQ 871 746
    • Location and Post Code: Medway Power Station, Rochester, Medway, ME3 0AG
    • Connection / DSR Capacity: 735
    • Primary Fuel of Component: Gas
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Medway CCGT
    2027-28T-42027-28 (T-4) Four Year Ahead Capacity Auction
    31.15 MW Prequalified
    Component ID: 64289
    Capacity: 31.15 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • De-Rated Capacity: 673.187
    • OS Grid Reference: TQ 871 746
    • Location and Post Code: Medway Power Station, Rochester, Medway, ME3 0AG
    • Connection / DSR Capacity: 735
    • Primary Fuel of Component: Gas
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Medway CCGT
    2026-27T-42026-27 (T-4) Four Year Ahead Capacity Auction
    31.15 MW Prequalified
    Component ID: 140273
    Capacity: 31.15 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • De-Rated Capacity: 671.349
    • OS Grid Reference: TQ 871 746
    • Location and Post Code: Medway Power Station, Rochester, Medway, ME3 0AG
    • Connection / DSR Capacity: 735
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Medway CCGT
    2025-26T-12025-26 (T-1) One Year Ahead Capacity Auction
    31.15 MW Prequalified
    Component ID: 530495
    Capacity: 31.15 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • De-Rated Capacity: 668.483
    • OS Grid Reference: TQ 871 746
    • Location and Post Code: Medway Power Station, Rochester, Medway, ME3 0AG
    • Connection / DSR Capacity: 735
    • Primary Fuel of Component: Gas
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Medway CCGT
    2025-26T-12025-26 (T-1) One Year Ahead Capacity Auction
    668.48 MW Prequalified
    Component ID: 573220
    Capacity: 668.48 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • De-Rated Capacity: 668.483
    • OS Grid Reference: TQ 871 746
    • Location and Post Code: Medway Power Station, Rochester, Medway, ME3 0AG
    • Connection / DSR Capacity: 735
    • Primary Fuel of Component: Gas
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Medway CCGT
    2023-24T-12023-24 (T-1) One Year Ahead Capacity Auction
    31.15 MW Prequalified
    Component ID: 566552
    Capacity: 31.15 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • De-Rated Capacity: 671.349
    • OS Grid Reference: TQ 871 746
    • Location and Post Code: Medway Power Station, Rochester, Medway, ME3 0AG
    • Connection / DSR Capacity: 735
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Medway CCGT
    2023-24T-12023-24 (T-1) One Year Ahead Capacity Auction
    671.35 MW Prequalified
    Component ID: 714086
    Capacity: 671.35 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • De-Rated Capacity: 671.349
    • OS Grid Reference: TQ 871 746
    • Location and Post Code: Medway Power Station, Rochester, Medway, ME3 0AG
    • Connection / DSR Capacity: 735
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Medway CCGT
    2023-24T-42023-24 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 54752
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NZ 407 424
    • Location and Post Code: Kitching Road, Peterlee, SR8 2HP
    • Generating Technology Class: Reciprocating engines
    • Description of CMU Components: A gas fuelled generating station.
    2023-24T-42023-24 (T-4) Four Year Ahead Capacity Auction
    31.15 MW Prequalified
    Component ID: 54671
    Capacity: 31.15 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TQ 871 746
    • Location and Post Code: Medway Power Station, Rochester, Medway, ME3 0AG
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Medway CCGT
    2022-23T-12022-23 (T-1) One Year Ahead Capacity Auction
    31.15 MW Prequalified
    Component ID: 615912
    Capacity: 31.15 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TQ 871 746
    • Location and Post Code: Medway Power Station, Rochester, Medway, ME3 0AG
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Medway CCGT
    2022-23T-12022-23 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 714688
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TQ 871 746
    • Location and Post Code: Medway Power Station, Rochester, Medway, ME3 0AG
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Medway CCGT
    2022-23T-12022-23 (T-1) One Year Ahead Capacity Auction
    31.15 MW Prequalified
    Component ID: 567154
    Capacity: 31.15 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TQ 871 746
    • Location and Post Code: Medway Power Station, Rochester, Medway, ME3 0AG
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Medway CCGT
    2022-23T-?2022-23 (T-3) Three Year Ahead Capacity Auction
    31.15 MW Prequalified
    Component ID: 63865
    Capacity: 31.15 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TQ 871 746
    • Location and Post Code: Medway Power Station, Rochester, Medway, ME3 0AG
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Medway CCGT
    2022-23T-42022-23 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 220003
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NN 321 098
    • Location and Post Code: Sloy Power Station, Arrochar, G83 7DP
    • Generating Technology Class: Hydro
    • Description of CMU Components: Genset 3
    2021-22T-42021-22 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 140215
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NZ 531 242
    • Location and Post Code: Seal Sands, Middlesborough, TS2 1UB
    • Generating Technology Class: CHP and autogeneration
    • Description of CMU Components: One of four SURF (Aggreko) model CHP units rated at 1375kVA
    2021-22T-42021-22 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 140297
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NS 853 665
    • Location and Post Code: FORREST FARM, CALDERCRUIX, AIRDRIE, LANARKSHIRE, ML6 8NX
    • Generating Technology Class: DSR
    • Description of CMU Components: The CMU Component reduces import demand by turning off equipment and other non-essential loads.
    CMU MEDP28
    668.483 MEDWAY POWER LIMITED
    Prequalified
  • ✓ Prequalified
  • 2028-29
    Capacity Information
    De-Rated Capacity
    668.483
    Connection/DSR Capacity
    735
    Anticipated Capacity
    668.483
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    SSE plc
    Registered Holder
    MEDWAY POWER LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2028-MEDP28-001
    Agreement Term
    1
    _id
    15797
    CMU ID
    MEDP28
    Auction
    Capacity Auction
    Auction Name
    2028-29 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Medway
    Name of Applicant
    MEDWAY POWER LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    Date of Issue of Capacity Agreement
    2025-04-04
    Auction Acquired Capacity Obligation
    668.483
    Secondary Trading Contact - Telephone
    '+441738340483
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2028/2029
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2028-29T-42028-29 (T-4) Four Year Ahead Capacity Auction
    668.48 MW Prequalified
    Component ID: 493852
    Capacity: 668.48 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TQ 871 746
    • Location and Post Code: Medway Power Station, Rochester, Medway, ME3 0AG
    • Primary Fuel of Component: Gas
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Medway CCGT
    CMU REST03
  • Unknown
  • 2028-29
    Capacity Information
    De-Rated Capacity
    N/A
    Connection/DSR Capacity
    N/A
    Anticipated Capacity
    N/A
    Max Obligation Period
    N/A
    Unit Information
    CMU Type
    N/A
    Primary Fuel
    N/A
    Category
    N/A
    Storage Facility
    N/A
    Commercial Information
    Termination Fee Rate 1
    N/A
    Termination Fee Rate 2
    N/A
    Termination Fee Rate 3
    N/A
    Termination Fee Rate 4
    N/A
    Termination Fee Rate 5
    N/A
    Annual Penalty Cap
    N/A
    Monthly Penalty Cap
    N/A
    Organization
    Company Name
    N/A
    Parent Company
    N/A
    Registered Holder
    N/A
    Opt Out Status
    N/A
    Agreement Details
    Agreement Awarded
    N/A
    Agreement ID
    N/A
    Obligation Summary
    N/A
    Agreement Term
    N/A
    Auction Participation History
    2028-29T-42028-29 (T-4) Four Year Ahead Capacity Auction
    668.48 MWUnknown
    Component ID: 536568
    Capacity: 668.48 MW
    Status: Unknown
    Auction-specific values (differ from CMU baseline):
    • De-Rated Capacity: 668.483
    • OS Grid Reference: TQ 871 746
    • Location and Post Code: Medway Power Station, Rochester, Medway, ME3 0AG
    • Connection / DSR Capacity: 735
    • Primary Fuel of Component: Gas
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Medway CCGT
    CMU WINC01
  • Unknown
  • 2027-28
    Capacity Information
    De-Rated Capacity
    N/A
    Connection/DSR Capacity
    N/A
    Anticipated Capacity
    N/A
    Max Obligation Period
    N/A
    Unit Information
    CMU Type
    N/A
    Primary Fuel
    N/A
    Category
    N/A
    Storage Facility
    N/A
    Commercial Information
    Termination Fee Rate 1
    N/A
    Termination Fee Rate 2
    N/A
    Termination Fee Rate 3
    N/A
    Termination Fee Rate 4
    N/A
    Termination Fee Rate 5
    N/A
    Annual Penalty Cap
    N/A
    Monthly Penalty Cap
    N/A
    Organization
    Company Name
    N/A
    Parent Company
    N/A
    Registered Holder
    N/A
    Opt Out Status
    N/A
    Agreement Details
    Agreement Awarded
    N/A
    Agreement ID
    N/A
    Obligation Summary
    N/A
    Agreement Term
    N/A
    Auction Participation History
    2027-28T-42027-28 (T-4) Four Year Ahead Capacity Auction
    673.19 MWUnknown
    Component ID: 64281
    Capacity: 673.19 MW
    Status: Unknown
    Auction-specific values (differ from CMU baseline):
    • De-Rated Capacity: 673.187
    • OS Grid Reference: TQ 871 746
    • Location and Post Code: Medway Power Station, Rochester, Medway, ME3 0AG
    • Connection / DSR Capacity: 735
    • Primary Fuel of Component: Gas
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Medway CCGT
    CMU HJF241
  • Unknown
  • 2026-27
    Capacity Information
    De-Rated Capacity
    N/A
    Connection/DSR Capacity
    N/A
    Anticipated Capacity
    N/A
    Max Obligation Period
    N/A
    Unit Information
    CMU Type
    N/A
    Primary Fuel
    N/A
    Category
    N/A
    Storage Facility
    N/A
    Commercial Information
    Termination Fee Rate 1
    N/A
    Termination Fee Rate 2
    N/A
    Termination Fee Rate 3
    N/A
    Termination Fee Rate 4
    N/A
    Termination Fee Rate 5
    N/A
    Annual Penalty Cap
    N/A
    Monthly Penalty Cap
    N/A
    Organization
    Company Name
    N/A
    Parent Company
    N/A
    Registered Holder
    N/A
    Opt Out Status
    N/A
    Agreement Details
    Agreement Awarded
    N/A
    Agreement ID
    N/A
    Obligation Summary
    N/A
    Agreement Term
    N/A
    Auction Participation History
    2026-27T-42026-27 (T-4) Four Year Ahead Capacity Auction
    671.35 MWUnknown
    Component ID: 140263
    Capacity: 671.35 MW
    Status: Unknown
    Auction-specific values (differ from CMU baseline):
    • De-Rated Capacity: 671.349
    • OS Grid Reference: TQ 871 746
    • Location and Post Code: Medway Power Station, Rochester, Medway, ME3 0AG
    • Connection / DSR Capacity: 735
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Medway CCGT
    CMU F2MI23
  • Unknown
  • 2024-25
    Capacity Information
    De-Rated Capacity
    N/A
    Connection/DSR Capacity
    N/A
    Anticipated Capacity
    N/A
    Max Obligation Period
    N/A
    Unit Information
    CMU Type
    N/A
    Primary Fuel
    N/A
    Category
    N/A
    Storage Facility
    N/A
    Commercial Information
    Termination Fee Rate 1
    N/A
    Termination Fee Rate 2
    N/A
    Termination Fee Rate 3
    N/A
    Termination Fee Rate 4
    N/A
    Termination Fee Rate 5
    N/A
    Annual Penalty Cap
    N/A
    Monthly Penalty Cap
    N/A
    Organization
    Company Name
    N/A
    Parent Company
    N/A
    Registered Holder
    N/A
    Opt Out Status
    N/A
    Agreement Details
    Agreement Awarded
    N/A
    Agreement ID
    N/A
    Obligation Summary
    N/A
    Agreement Term
    N/A
    Auction Participation History
    2024-25T-12024-25 (T-1) One Year Ahead Capacity Auction
    673.19 MWUnknown
    Component ID: 140287
    Capacity: 673.19 MW
    Status: Unknown
    Auction-specific values (differ from CMU baseline):
    • De-Rated Capacity: 673.187
    • OS Grid Reference: TQ 871 746
    • Location and Post Code: Medway Power Station, Rochester, Medway, ME3 0AG
    • Connection / DSR Capacity: 735
    • Primary Fuel of Component: Gas
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Medway CCGT
    CMU MED231
    671.349 MEDWAY POWER LIMITED
    Prequalified
  • ✓ Prequalified
  • 2023-24
    Capacity Information
    De-Rated Capacity
    671.349
    Connection/DSR Capacity
    735
    Anticipated Capacity
    671.349
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    SSE plc
    Registered Holder
    MEDWAY POWER LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2023-MED231-001
    Agreement Term
    1
    _id
    9216
    CMU ID
    MED231
    Auction
    Capacity Auction
    Auction Name
    2023-24 (T-1) One Year Ahead Capacity Auction
    CM Unit Name
    Medway
    Name of Applicant
    MEDWAY POWER LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2023-03-24
    Auction Acquired Capacity Obligation
    671.349
    Secondary Trading Contact - Telephone
    '+441738341632
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2023/2024
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2023-24T-12023-24 (T-1) One Year Ahead Capacity Auction
    671.35 MW Prequalified
    Component ID: 615292
    Capacity: 671.35 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TQ 871 746
    • Location and Post Code: Medway Power Station, Rochester, Medway, ME3 0AG
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Medway CCGT
    CMU MED221
    668.262 MEDWAY POWER LIMITED
    Prequalified
  • ✓ Prequalified
  • 2022-23
    Capacity Information
    De-Rated Capacity
    668.262
    Connection/DSR Capacity
    735
    Anticipated Capacity
    668.262
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    SSE plc
    Registered Holder
    MEDWAY POWER LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2022-MED221-001
    Agreement Term
    1
    _id
    6707
    CMU ID
    MED221
    Auction
    Capacity Auction
    Auction Name
    2022-23 (T-1) One Year Ahead Capacity Auction
    CM Unit Name
    Medway
    Name of Applicant
    MEDWAY POWER LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2022-03-25
    Auction Acquired Capacity Obligation
    668.262
    Secondary Trading Contact - Telephone
    '+441738341632
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2022/2023
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2022-23T-12022-23 (T-1) One Year Ahead Capacity Auction
    668.26 MW Prequalified
    Component ID: 615894
    Capacity: 668.26 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TQ 871 746
    • Location and Post Code: Medway Power Station, Rochester, Medway, ME3 0AG
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Medway CCGT
    CMU GCMU16
  • Unknown
  • 2022-23
    Capacity Information
    De-Rated Capacity
    N/A
    Connection/DSR Capacity
    N/A
    Anticipated Capacity
    N/A
    Max Obligation Period
    N/A
    Unit Information
    CMU Type
    N/A
    Primary Fuel
    N/A
    Category
    N/A
    Storage Facility
    N/A
    Commercial Information
    Termination Fee Rate 1
    N/A
    Termination Fee Rate 2
    N/A
    Termination Fee Rate 3
    N/A
    Termination Fee Rate 4
    N/A
    Termination Fee Rate 5
    N/A
    Annual Penalty Cap
    N/A
    Monthly Penalty Cap
    N/A
    Organization
    Company Name
    N/A
    Parent Company
    N/A
    Registered Holder
    N/A
    Opt Out Status
    N/A
    Agreement Details
    Agreement Awarded
    N/A
    Agreement ID
    N/A
    Obligation Summary
    N/A
    Agreement Term
    N/A
    Auction Participation History
    2022-23T-?2022-23 (T-3) Three Year Ahead Capacity Auction
    Unknown
    Component ID: 63857
    Status: Unknown
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TQ 871 746
    • Location and Post Code: Medway Power Station, Rochester, Medway, ME3 0AG
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Medway CCGT
    CMU MEDP01
    666.3 MEDWAY POWER LIMITED
    Prequalified (2)
  • ✓ Prequalified
  • ✓ Prequalified
  • 2020-21 2017-2020
    Capacity Information
    De-Rated Capacity
    666.3
    Connection/DSR Capacity
    740.333
    Anticipated Capacity
    666.3
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Registered Holder
    MEDWAY POWER LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2020-MEDP01-001
    Agreement Term
    1
    _id
    4299
    CMU ID
    MEDP01
    Auction
    Capacity Auction
    Auction Name
    2020-21 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Medway
    Name of Applicant
    MEDWAY POWER LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Date of Issue of Capacity Agreement
    2017-01-20
    Auction Acquired Capacity Obligation
    666.3
    Secondary Trading Contact - Telephone
    '+441738340483
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2020/2021
    Auction Participation History
    2020-21T-42020-21 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 268617
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NZ 054 175
    • Location and Post Code: Harmire Road, Barnard Castle, County Durham, DL12 8D
    • Description of CMU Components: On-site existing CHP generating unit
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 683691
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TQ 871 746
    • Location and Post Code: Medway Power Station, Rochester, Medway, ME3 0AG
    • Description of CMU Components: Medway
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction
    162.13 MW Prequalified
    Component ID: 536157
    Capacity: 162.13 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TQ 871 746
    • Location and Post Code: Medway Power Station, Rochester, Medway, ME3 0AG
    • Description of CMU Components: Medway
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction
    162.13 MW Prequalified
    Component ID: 584915
    Capacity: 162.13 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TQ 871 746
    • Location and Post Code: Medway Power Station, Rochester, Medway, ME3 0AG
    • Description of CMU Components: Medway
    Welcome to Capacity Market Search
    🗺️ 1 week free trial to explore all features!

    You can explore the basic features, but will need to register for continued access to premium features like the interactive map.

    Choose your contribution amount
    Unlimited access to all premium features

    Secure payment • No subscription • Lifetime access