Home Technologies Companies Locations Map Explorer FAQ Trading Board Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Loading...
Loading...

Search Results for "ME3"

32 unique locations (226 components)

ARCHERY CLOSE, CLIFFE WOODS, ROCHESTER, KENT, ME3 (1 component)

EV charging on residential premises

Active • 2026-27 (T-4)
BRAEBURN DRIVE, HOO, ROCHESTER, ME3 (1 component)

EV charging on residential premises

Active • 2026-27 (T-4)
Britned Convertor station, Gate C, Grain road, Isle of Grain, Kent, ME3 0AE (3 components)

BritNed is a 1200MW (TEC) electricity interconnector connecting the electricity transmission systems in the Netherlands and GB. (2)

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Britned Convertor Station, Gate C, Grain Road, Isle of Grain, Kent, ME3 0AE (9 components)
• BritNed is a 1200MW (TEC) electricity interconnector connecting the electricity transmission systems in the Netherlands and Great Britain.
• BritNed is a 1320MW (CEC) electricity interconnector connecting the electricity transmission systems in the Netherlands and Great Britain.
• BritNed is a electricity interconnector connecting the electricity transmission systems in the Netherlands and Great Britain.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
CORNER COOLING STREET CLIFFE ROCHESTER ME3 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
Grain CHP Power Station Isle of Grain Rochester Kent ME3 0AR (9 components)

Gas-fired reciprocating engine

Inactive • 2020-21 (T-4)
Grain LNG Importation Terminal, Isle of Grain, Rochester, Kent ME3 0AB (1 component)

Back Up Generator

Inactive • 2023-24 (T-1)
Grain Rd, Rochester ME3 9RE (2 components)

35 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets (2)

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Grain Road Isle of Grain Rochester Kent ME3 0EH (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Grain Road Isle of Grain Rochester ME3 0AB (5 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
6.66 MW
Grain Road, Isle of Grain, Rochester, ME3 0AB (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)

Active • 2024-25 (T-4), 2021-22 (T-1)
Grain Road Rochester ME3 0AJ (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
HARRISON DRIVE HIGH HALSTOW ROCHESTER KENT ME3 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
Kingsnorth, Hoo, Rochester, Kent, ME3 9TX (11 components)
• Combined Cycle Gas Turbine plant (2)
• A new combined cycle gas turbine (unit 5) at Damhead Creek 2 power plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3868.03 MW
Kingsnorth, Hoo. St Werburgh, Rochester, Kent, ME3 9TX (2 components)

Combined Cycle Gas Turbine plant (2)

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (8 components)
• New build Combined Cycle Gas Turbine plant (2)
• Combined Cycle Gas Turbine plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (Next to Damhead Creek Power Station CMU SP17DC) (3 components)
• New build Combined Cycle Gas Turbine plant
• New build Open Cycle Gas Turbine plant
• New reciprocating generating plant.
Inactive • 2021-22 (T-4)
Kingsnorth Industrial Estate, Rochester, ME3 9ND (2 components)

CMU Component is 700kVA reciprocating diesel engine.

Inactive • 2020-21 (T-4)
Kingsnorth Works Industrial Estate, Hoo, Rochester Kent ME3 9ND (3 components)

A generating station consisting of multiple reciprocating engines and alternators located on a single site. Voltage to be transformed, where appropriate, to export. (2)

Inactive • 2018-19 (T-1), 2017-18 (T-1)
ME3 (9 components)
• Domestic demand turn down (2)
• Domestic EV charger
Active • 2027-28 (T-4), 2025-26 (T-1) ...
Medway Power Station, Rochester, Medway, ME3 0AG (18 components)

Medway CCGT (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
3352.85 MW
National Grid Grain LNG Importation Terminal Isle of Grain Kent ME3 0AB (1 component)

Gas pumping site

Inactive • 2017-18 (TR)
Perry?s Farm, Isle of Grain, ME3 0AW (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4)
Power Station Road Isle of Grain Rochester ME3 0AR (60 components)
• Grain B CCGT Unit 6 Grain B power station provides heat to the Grain LNG regasification facility.
• Grain B CCGT Unit 7 Grain B power station provides heat to the Grain LNG regasification facility.
• Grain B CCGT Unit 8. Grain B power station provides heat to the Grain LNG regasification facility.
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4000.25 MW
Power Station Road Isle of Grain Rochester ME3 0AR (55 components)
• Grain B CCGT Unit 6 Grain B power station provides heat to the Grain LNG regasification facility.
• Grain B CCGT Unit 7 Grain B power station provides heat to the Grain LNG regasification facility.
• Grain B CCGT Unit 8. Grain B power station provides heat to the Grain LNG regasification facility.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4000.25 MW
TENNYSON AVENUE CLIFFE WOODS ROCHESTER ME3 (1 component)

EV charging at residential premises

Active • 2026-27 (T-4)
TENNYSON AVENUE, CLIFFE WOODS, ROCHESTER, ME3 (1 component)

EV charging on residential premises

Active • 2026-27 (T-4)
Toad Hall Crescent ROCHESTER KENT ME3 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
Loading map...
Showing 32 locations