Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help
Capacity Market Search
Menu
Home
  • Technologies
  • Companies
  • Locations
  • Map Explorer
  • FAQ
  • Trading Board
  • ChatGPT

  • Buy Me A Coffee
  • Help

  • Login
  • Register

  • Theme
  • Light
  • Dark
  • Auto
  • Understanding AuctionsSearch ResultsComponent GroupingSortingMap ViewContact Us

    Search Guide

    This registry provides comprehensive search capabilities across all Capacity Market components:

    • Company Search: Enter a company name (e.g., "Drax", "EDF") to see all their components
    • Location Search: Search by city, region, or postcode (e.g., "Manchester", "SW1")
    • CMU ID Search: Enter a specific CMU ID to find exact components
    • Technology Search: Enter technology types like "Hydro", "OCGT", or "Battery"

    The search is intelligent and will try to determine what you're looking for based on your query.

    You can combine search terms to narrow results, such as "London Battery" to find battery storage in London.

    Searches are not case-sensitive, and partial matches are supported (e.g., "Manch" will find "Manchester").

    Understanding Auctions

    The Capacity Market runs regular auctions where providers compete to secure agreements. There are two main types:

    • T-4 auctions: Held 4 years ahead of the delivery year
    • T-1 auctions: Held 1 year ahead to fine-tune capacity requirements

    Each auction results in agreements that specify how much capacity providers must deliver and the payment they'll receive.

    Auction years are displayed as badges (e.g., 2023-24) that you can click to view details for that specific auction year.

    The Capacity Market ensures the UK has sufficient electricity supply during periods of high demand or system stress.

    Providers receive payments for ensuring their capacity is available, creating a more stable and resilient electricity market.

    Search Results

    Search results are grouped by location and show important details about each component:

    • Active Components with auction years 2024-25 or later
    • In-Active Components with only auction years before 2024-25
    • Company Name Click to view all components for this company
    • Technology Click to search for this technology type
    • CMU: XXX Click to search for this CMU ID
    • Auction Year Click to view details for this specific auction

    Each result shows the component's capacity, location details, and participation in specific auction years.

    You can sort results by relevance, location, or date using the sort options.

    Pagination controls appear at the bottom when there are multiple pages of results.

    Component Grouping

    Components at the same location with the same description are grouped together to reduce duplication.

    Each group shows:

    • All CMU IDs for components at that location
    • All auction years, sorted with newest first
    • An Active/Inactive status based on auction years

    Grouping helps identify multi-year contracts and related components at the same site.

    The total capacity shown combines all components in the group.

    Components can be expanded to show individual details by clicking the expand icon.

    Sorting and Filtering

    You can sort search results by:

    • Relevance: Most relevant matches first
    • Location: Alphabetical order by location name
    • Date: By auction year (newest or oldest first)
    • Capacity: Highest or lowest capacity first

    Click the column headers to change sort order.

    You can filter results using the search refinements at the top of the results page:

    • Filter by technology type (e.g., only show batteries)
    • Filter by active status (show only active or inactive components)
    • Filter by auction year (show only components from specific auctions)

    Map Explorer & Map View

    We provide two map-based tools for exploring capacity market data:

    Map Explorer

    The Map Explorer is our advanced interactive mapping tool, specifically designed for comprehensive data exploration with:

    • Mobile-Optimized Interface: Responsive design that works perfectly on phones and tablets
    • Advanced Filtering: Filter by technology type, company, delivery year, and active status
    • Smart Sidebar: Desktop users get a dedicated filter panel, mobile users get collapsible filters
    • Full-Screen Map: Maximizes map space for detailed geographical analysis
    Search Map View

    The Search Map View combines search functionality with map visualization, offering:

    • Search-First Approach: Start with text searches, then visualize results on the map
    • Integrated Results: Search results and map display work together
    • Performance Optimized: Streamlined for fast search result mapping

    Both tools provide a visual representation of capacity distribution across the UK, but serve different exploration needs.

    Map Features:
    • Technology Colors: Different technology types are shown with distinct colors on the map for easy identification:
      GasDSRNuclearCHPSolarWind
      BatteryBiomassHydroInterconnectorCoalOther
    • Technology Legend: The map legend shows all available technologies with their corresponding colors and component counts
    • Search Results on Map: You can view any search results on the map by clicking "View on Map" from search results pages
    • Smart Clustering: Areas with multiple components are automatically grouped into clusters - click clusters to zoom in and see individual components
    • Interactive Markers: Click on individual markers to see detailed information about components at that location

    Use the map controls to zoom in on specific regions or areas of interest. The map automatically adjusts clustering based on your zoom level to provide the clearest view of capacity distribution.

    Contact Us

    We're here to help with any questions about the Capacity Market Registry.

    Email

    For general inquiries and support:

    For LLMs

    Complete programmatic access guide for LLMs:

    Search / All Locations / All Postcodes / L69 / L69 3GB

    Energy Center, Ashton Street, Liverpool, L69 3GB

    No capacity
    Total Capacity
    L69 3GB
    Postcode
    49
    Components
    Prequalified
    Prequalification
    * Latest auction year on record
    Descriptions:
    • One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB
    • One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
    Trading Contacts:

    CMU Registry Data

    CMU GC2420
    4.604 ENEL X UK …
    Prequalified
  • ✓ Prequalified
  • 2024-25
    Capacity Information
    De-Rated Capacity
    4.604
    Connection/DSR Capacity
    5.027
    Anticipated Capacity
    6.759
    Max Obligation Period
    1
    Unit Information
    CMU Type
    Non CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    ENEL X INTERNATIONAL S.R.L.
    Registered Holder
    ENEL X UK LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2024-GC2420-001
    Obligation Summary
    01/10/2024 - 30/09/2025:4.604 MW
    Agreement Term
    1
    _id
    11449
    CMU ID
    GC2420
    Auction
    Capacity Auction
    Auction Name
    2024-25 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    GC2420
    Name of Applicant
    ENEL X UK LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    Secondary Trading Contact - Email
    Date of Issue of Capacity Agreement
    2024-08-30
    List of Traded Capacity Obligations
    T1: 4.604 MW
    Period for which the transfer applies
    T1: 01/10/2024 - 30/09/2025
    Secondary Trading Contact - Telephone
    '+4402037954936
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2024/2025
    Auction Participation History
    2024-25T-42024-25 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 375895
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 357 904
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Generating Technology Class: Combined Heat and Power (CHP)
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
    2024-25T-42024-25 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 375894
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 357 904
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Generating Technology Class: Combined Heat and Power (CHP)
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB
    2024-25T-42024-25 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 375896
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 357 904
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Generating Technology Class: Combined Heat and Power (CHP)
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
    CMU GENH17
    4.592 ENEL X UK …
    Prequalified
  • ✓ Prequalified
  • 2023-24
    Capacity Information
    De-Rated Capacity
    4.592
    Connection/DSR Capacity
    5.027
    Anticipated Capacity
    4.592
    Max Obligation Period
    1
    Unit Information
    CMU Type
    Non CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    ENEL X INTERNATIONAL S.R.L.
    Registered Holder
    ENEL X UK LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2023-GENH17-001
    Obligation Summary
    01/10/2023 - 30/09/2024:4.500 MW
    Agreement Term
    1
    _id
    9882
    CMU ID
    GENH17
    Auction
    Capacity Auction
    Auction Name
    2023-24 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    GCMU17
    Name of Applicant
    ENEL X UK LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    Secondary Trading Contact - Email
    Date of Issue of Capacity Agreement
    2023-09-04
    List of Traded Capacity Obligations
    T1: 4.500 MW
    Period for which the transfer applies
    T1: 01/10/2023 - 30/09/2024
    Secondary Trading Contact - Telephone
    '+4402037954936
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2023/2024
    Auction Participation History
    2023-24T-42023-24 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 184445
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 357 904
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Generating Technology Class: Combined Heat and Power (CHP)
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
    2023-24T-42023-24 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 184443
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 357 904
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Generating Technology Class: Combined Heat and Power (CHP)
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB
    2023-24T-42023-24 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 184444
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 357 904
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Generating Technology Class: Combined Heat and Power (CHP)
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
    CMU DSRB17
    6.362 ENEL X UK …
    Prequalified
  • ✓ Prequalified
  • 2022-23
    Capacity Information
    De-Rated Capacity
    6.362
    Connection/DSR Capacity
    6.998
    Anticipated Capacity
    6.362
    Max Obligation Period
    1
    Unit Information
    CMU Type
    Non CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    ENEL X INTERNATIONAL S.R.L.
    Registered Holder
    ENEL X UK LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2022-DSRB17-001
    Obligation Summary
    01/10/2022 - 30/09/2023:5.931 MW
    Agreement Term
    1
    _id
    6520
    CMU ID
    DSRB17
    Auction
    Capacity Auction
    Auction Name
    2022-23 (T-1) One Year Ahead Capacity Auction
    CM Unit Name
    GCMU17
    Name of Applicant
    ENEL X UK LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2022-09-06
    List of Traded Capacity Obligations
    T1: 5.931 MW
    Period for which the transfer applies
    T1: 01/10/2022 - 30/09/2023
    Secondary Trading Contact - Telephone
    '+4402037954936
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2022/2023
    Auction Participation History
    2022-23T-12022-23 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 537001
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 357 904
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Generating Technology Class: Combined Heat and Power (CHP)
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
    2022-23T-12022-23 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 536999
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 357 904
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Generating Technology Class: Combined Heat and Power (CHP)
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB
    2022-23T-12022-23 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 537000
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 357 904
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Generating Technology Class: Combined Heat and Power (CHP)
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
    CMU NGEN17
    6.201 ENEL X UK …
    Prequalified (2)
  • ✓ Prequalified
  • ✓ Prequalified
  • 2022-23 2020-2022
    Capacity Information
    De-Rated Capacity
    6.201
    Connection/DSR Capacity
    6.891
    Anticipated Capacity
    6.202
    Max Obligation Period
    1
    Unit Information
    CMU Type
    Non CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Organization
    Company Name
    N/A
    Parent Company
    ENEL X INTERNATIONAL S.R.L.
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    No
    _id
    7475
    CMU ID
    NGEN17
    Auction
    Capacity Auction
    Auction Name
    2022-23 (T-3) Three Year Ahead Capacity Auction
    CM Unit Name
    GCMU17
    Name of Applicant
    ENEL X UK LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Secondary Trading Contact - Telephone
    '+4402037954936
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2022-23T-?2022-23 (T-3) Three Year Ahead Capacity Auction
    Prequalified
    Component ID: 185476
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 358 905
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Generating Technology Class: Combined Heat and Power (CHP)
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
    2022-23T-?2022-23 (T-3) Three Year Ahead Capacity Auction
    Prequalified
    Component ID: 185477
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 358 905
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Generating Technology Class: Combined Heat and Power (CHP)
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
    2022-23T-?2022-23 (T-3) Three Year Ahead Capacity Auction
    Prequalified
    Component ID: 185475
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 358 905
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Generating Technology Class: Combined Heat and Power (CHP)
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB
    2020-21T-12020-21 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 585227
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 358 905
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Generating Technology Class: Combined Heat and Power (CHP)
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
    2020-21T-12020-21 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 536468
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 358 905
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Generating Technology Class: Combined Heat and Power (CHP)
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
    2020-21T-12020-21 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 536469
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 358 905
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Generating Technology Class: Combined Heat and Power (CHP)
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
    2020-21T-12020-21 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 536467
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 358 905
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Generating Technology Class: Combined Heat and Power (CHP)
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB
    CMU XGEN17
    6.033 ENEL X UK …
    Prequalified (2)
  • ✓ Prequalified
  • ✓ Prequalified
  • 2022-23 2019-2022
    Capacity Information
    De-Rated Capacity
    6.033
    Connection/DSR Capacity
    6.702
    Anticipated Capacity
    6.032
    Max Obligation Period
    1
    Unit Information
    CMU Type
    Non CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Organization
    Company Name
    N/A
    Parent Company
    ENEL X INTERNATIONAL S.R.L.
    Opt Out Status
    Opt-In
    Agreement Details
    _id
    8916
    CMU ID
    XGEN17
    Auction
    Capacity Auction
    Auction Name
    2022-23 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    GCMU17
    Name of Applicant
    ENEL X UK LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Secondary Trading Contact - Telephone
    '+4402037954936
    Auction Participation History
    2022-23T-42022-23 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 54621
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 358 905
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Generating Technology Class: Combined Heat and Power (CHP)
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
    2022-23T-42022-23 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 54622
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 358 905
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Generating Technology Class: Combined Heat and Power (CHP)
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
    2022-23T-42022-23 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 54620
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 358 905
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Generating Technology Class: Combined Heat and Power (CHP)
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB
    2019-20T-12019-20 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 611396
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 358 905
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Generating Technology Class: Combined Heat and Power (CHP)
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB
    2019-20T-12019-20 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 611397
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 358 905
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Generating Technology Class: Combined Heat and Power (CHP)
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
    2019-20T-12019-20 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 611398
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 358 905
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Generating Technology Class: Combined Heat and Power (CHP)
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
    2019-20T-12019-20 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 562639
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 358 905
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Generating Technology Class: Combined Heat and Power (CHP)
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
    2019-20T-12019-20 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 562640
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 358 905
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Generating Technology Class: Combined Heat and Power (CHP)
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
    2019-20T-12019-20 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 562638
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 358 905
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Generating Technology Class: Combined Heat and Power (CHP)
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB
    CMU GENX17
    6.004 ENEL X UK …
    Rejected
  • ✗ Rejected
  • 2021-22
    Capacity Information
    De-Rated Capacity
    6.004
    Connection/DSR Capacity
    6.67
    Anticipated Capacity
    6.003
    Max Obligation Period
    1
    Unit Information
    CMU Type
    Non CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Organization
    Company Name
    N/A
    Parent Company
    ENEL X INTERNATIONAL S.R.L.
    Opt Out Status
    Opt-In
    Agreement Details
    _id
    4926
    CMU ID
    GENX17
    Auction
    Capacity Auction
    Auction Name
    2021-22 (T-1) One Year Ahead Capacity Auction
    CM Unit Name
    GCMU17
    Name of Applicant
    ENEL X UK LIMITED
    Pre-Qualification Decision
    Rejected
    Transmission / Distribution
    Distribution
    Secondary Trading Contact - Email
    [email protected]
    Secondary Trading Contact - Telephone
    '+4402037954936
    Auction Participation History
    2021-22T-12021-22 (T-1) One Year Ahead Capacity Auction
    Rejected
    Component ID: 615527
    Status: Rejected
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 358 905
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Generating Technology Class: Combined Heat and Power (CHP)
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB
    2021-22T-12021-22 (T-1) One Year Ahead Capacity Auction
    Rejected
    Component ID: 566771
    Status: Rejected
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 358 905
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Generating Technology Class: Combined Heat and Power (CHP)
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
    2021-22T-12021-22 (T-1) One Year Ahead Capacity Auction
    Rejected
    Component ID: 566769
    Status: Rejected
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 358 905
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Generating Technology Class: Combined Heat and Power (CHP)
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB
    2021-22T-12021-22 (T-1) One Year Ahead Capacity Auction
    Rejected
    Component ID: 566770
    Status: Rejected
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 358 905
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Generating Technology Class: Combined Heat and Power (CHP)
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
    2021-22T-12021-22 (T-1) One Year Ahead Capacity Auction
    Rejected
    Component ID: 615529
    Status: Rejected
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 358 905
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Generating Technology Class: Combined Heat and Power (CHP)
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
    2021-22T-12021-22 (T-1) One Year Ahead Capacity Auction
    Rejected
    Component ID: 615528
    Status: Rejected
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 358 905
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Generating Technology Class: Combined Heat and Power (CHP)
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
    CMU EGEN17
    6.03 ENEL X UK …
    Prequalified (2)
  • ✓ Prequalified
  • ✓ Prequalified
  • 2021-22 2018-2021
    Capacity Information
    De-Rated Capacity
    6.03
    Connection/DSR Capacity
    6.7
    Anticipated Capacity
    6.03
    Max Obligation Period
    1
    Unit Information
    CMU Type
    Non CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    ENEL X INTERNATIONAL S.R.L.
    Registered Holder
    ENEL X UK LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2021-EGEN17-001
    Agreement Term
    1
    _id
    5486
    CMU ID
    EGEN17
    Auction
    Capacity Auction
    Auction Name
    2021-22 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    GCMU17
    Name of Applicant
    ENEL X UK LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2018-03-20
    Auction Acquired Capacity Obligation
    6.03
    Secondary Trading Contact - Telephone
    '+4402037954936
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2021/2022
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2021-22T-42021-22 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 185505
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 357 904
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Generating Technology Class: CHP and autogeneration
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB
    2021-22T-42021-22 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 185507
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 357 904
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Generating Technology Class: CHP and autogeneration
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
    2021-22T-42021-22 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 185506
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 357 904
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Generating Technology Class: CHP and autogeneration
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
    2018-19T-12018-19 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 584743
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 357 904
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Generating Technology Class: CHP and autogeneration
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB
    2018-19T-12018-19 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 584744
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 357 904
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Generating Technology Class: CHP and autogeneration
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
    2018-19T-12018-19 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 584745
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 357 904
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Generating Technology Class: CHP and autogeneration
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
    2018-19T-12018-19 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 535986
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 357 904
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Generating Technology Class: CHP and autogeneration
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
    2018-19T-12018-19 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 535985
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 357 904
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Generating Technology Class: CHP and autogeneration
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB
    2018-19T-12018-19 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 535987
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 357 904
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Generating Technology Class: CHP and autogeneration
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
    CMU GCMU17
    6.03 ENEL X UK …
    Prequalified (2)
  • ✓ Prequalified
  • ✓ Prequalified
  • 2020-21 2017-2020
    Capacity Information
    De-Rated Capacity
    6.03
    Connection/DSR Capacity
    6.7
    Anticipated Capacity
    6.03
    Max Obligation Period
    1
    Unit Information
    CMU Type
    Non CMRS
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Registered Holder
    ENEL X UK LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2020-GCMU17-001
    Agreement Term
    1
    _id
    4152
    CMU ID
    GCMU17
    Auction
    Capacity Auction
    Auction Name
    2020-21 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    GCMU17
    Name of Applicant
    ENEL X UK LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Distribution
    CMU confirmed entry into Auction
    Yes
    Date of Issue of Capacity Agreement
    2017-01-20
    Auction Acquired Capacity Obligation
    6.03
    Secondary Trading Contact - Telephone
    '+4402037954936
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2020/2021
    Auction Participation History
    2020-21T-42020-21 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 714
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 357 904
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB
    2020-21T-42020-21 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 715
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 357 904
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
    2020-21T-42020-21 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 716
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 357 904
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 541079
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 357 904
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 666208
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 357 904
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 589819
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 357 904
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 541080
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 357 904
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 589818
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 357 904
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 589820
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 357 904
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 666206
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 357 904
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 666207
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 357 904
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 541078
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SJ 357 904
    • Location and Post Code: Energy Center, Ashton Street, Liverpool, L69 3GB
    • Description of CMU Components: One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB
    Welcome to Capacity Market Search
    🗺️ 1 week free trial to explore all features!

    You can explore the basic features, but will need to register for continued access to premium features like the interactive map.

    Choose your contribution amount
    Unlimited access to all premium features

    Secure payment • No subscription • Lifetime access