Home Technologies Companies Locations Map Explorer FAQ Trading Board Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Loading...
Loading...

Search Results for "KA1"

22 unique locations (59 components)

adjacent to Kilmarnock South Substation KA1 3TN (2 components)
• 200MW battery storage located near to the SPT Kilmarnock South substation, split into two BMU's
• 200MW battery storage located near to theSPT Kilmarnock South substation, split into two BMU's
Active • 2026-27 (T-4)
47.26 MW
adjacent to Kilmarnock South Substation KA1 3TN (12 components)

Lithium ion battery storage plant (2)

Active • 2026-27 (T-4), 2025-26 (T-1)
150.05 MW
Asda Kilmarnock, 10 Queens Drive , Kilmarnock, KA1 3XF (11 components)
• Load curtailment (2)
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Braehead Farm Riccarton Kilmarnock KA1 5LN (4 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on agricultural land, approximately 250 Metres north of Kilmarnock Substation. …

Active • 2028-29 (T-4)
71.20 MW
Camsiscan Farm, Craigie, South Ayrshire, Scotland, KA1 5JT (4 components)
• An 87.500 MW Battery Storage Site Component.
• An 87.500 MW New Build Battery Storage Site Component
• An 87.500 MW New Build Battery Storage Site Component.
Active • 2028-29 (T-4)
55.20 MW
Craigie, South Ayrshire, Scotland, KA1 5JT (2 components)

A 175MW New Build Battery Storage Site Component

Active • 2027-28 (T-4)
40.32 MW
KA1 (1 component)

Domestic EV charger

Active • 2024-25 (T-4)
KA10 (3 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-4), 2024-25 (T-1)
KA11 (1 component)

Domestic demand turn down

Active • 2024-25 (T-1)
KA12 (1 component)

Domestic EV charger

Active • 2024-25 (T-1)
KA13 (3 components)
• Domestic EV charger (2)
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-1)
KA16 (1 component)

Domestic EV charger

Active • 2024-25 (T-4)
KA18 (1 component)

Domestic demand turn down

Active • 2024-25 (T-1)
Land at Inchbean Farm, Kilmarnock, East Ayrshire, KA1 5JP (1 component)

The CMU component is an energy storage system comprised of lithium ion batteries and associated infrastructure.

Active • 2028-29 (T-4)
8.80 MW
Morrishill Drive BEITH AYRSHIRE KA15 (1 component)

EV charging at residential premises

Inactive • 2023-24 (T-1)
OTTOLINE DRIVE TROON AYRSHIRE KA10 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
PENNANT PLACE, IRVINE, KA11 (1 component)

EV charging on residential premises

Active • 2026-27 (T-4)
Stables Townend Estate Kilmarnock Ayrshire KA1 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
Stable Wynd, Troon, Ayrshire, KA10 (1 component)

EV charging on residential premises

Active • 2026-27 (T-4)
Stagecoach Group Plc, Western Bus Station, Town Centre Kilmarnock, KA1 1JU (3 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
Stagecoach Services Ltd, Bus Depot, Mackinlay Place Kilmarnock, KA1 3DN (3 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
Loading map...
Showing 22 locations