Home Technologies Companies Locations Map Explorer FAQ Trading Board Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Loading...
Loading...

Search Results for "IP8"

18 unique locations (37 components)

Blankenham Nursery, Great Blankenham, Bramford, Ipswich, Suffolk, IP8 4JU (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2027-28 (T-4)
6.79 MW
BRAMFORD-TYE LA WW, Tye Lane, Bramford, Ipswich, Suffolk, IP8 4LW (4 components)

Diesel Generator, Dorman, 6SETCR (2)

Inactive • 2017-18 (T-1), 2016-17 (TR)
Bramford WS, BRAMFORD-TYE LA WW, Tye Lane, Bramford, IPSWICH, IP8 4LW (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
12.56 MW
Bullen Lane, Bramford, Mid Suffolk, Suffolk, England, IP8 4JH, United Kingdom (1 component)

The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.

Active • 2027-28 (T-4)
122.81 MW
IP8 (4 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-1)
Land at Brook Farm, off Church Hill Road, North of Burstall, IP8 4LA (1 component)

This is a new battery storage plant, based on of lithium ion cells to be installed in multiple ISO compliant battery containers.

Inactive • 2021-22 (T-4)
Land east of Bramford Substation, Bullen Lane, Bramford, IP8 4JH (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
22.99 MW
11.67 MW
Land to the east of the Channel, Burstall, Suffolk, IP8 4JL (1 component)

Lithium-based battery energy storage system.

Active • 2026-27 (T-4)
8.89 MW
Land to the North of Tye Lane, Ipswich, IP8 4NP (4 components)

CMU is a photovoltaic system (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.92 MW
LEY BURSTALL HILL BURSTALL IPSWICH SUFFOLK IP8 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
Loraine Way, Bramford, IP8 4JU (2 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant.
Active • 2026-27 (T-4), 2025-26 (T-4)
6.85 MW
SPROUGHTON-RIVER INTAKE WA , SPROUGHTON, IP8 3BG (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (2)

Active • 2024-25 (T-4), 2023-24 (T-1)
SPROUGHTON-RIVER INTAKE WA, SPROUGHTON, IP8 3BG (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (2)

Active • 2024-25 (T-4), 2023-24 (T-1)
ST. MARYS CLOSE BRAMFORD IPSWICH IP8 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
Loading map...
Showing 18 locations