Home Technologies Companies Locations Map Explorer FAQ Trading Board Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Loading...
Loading...

Search Results for "FK7"

8 unique locations (34 components)

Cowie Sterling FK7 7BQ (9 components)

14.710 MW CHP generation (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
13.44 MW
Cowie Stirling FK7 7BQ (2 components)

14.700MW CHP located at Cowie, Stirling. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Cowie, Stirling, FK7 7BQ (3 components)

2*7.5MW Gas Turbines (2)

Inactive • 2020-21 (T-4), 2017-18 (T-1)
FK7 (5 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-4), 2024-25 (T-1)
Land (see map) off 15 Borrowmeadow Road, Springkerse Industrial Estate, Stirling FK7 7FB (2 components)

CMU consists of gas-powered reciprocating engines connected to the SPEN distribution network at 11kV. The size will be16MW, consisting of a number of gas generating sets. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Norbord Cowie Station Road Cowie Stirling FK7 7BQ (8 components)

3.600MW of demand reduction (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
NORBORD LTD STATION ROAD COWIE FK7 7BW (1 component)

Turn down CMU

Inactive • 2017-18 (TR)
Station Rd, Cowie, Stirling FK7 7BQ (4 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (2)

Active • 2027-28 (T-4), 2024-25 (T-1)
Loading map...
Showing 8 locations