Asda Carcroft, High Street Carcroft, Doncaster, DN6 8DN (9 components)
• Load curtailment (2)
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
ASDA Carcroft, High Street Carcroft, Doncaster, DN6 8DN (1 component)

Disabling load of refrigeration plant through remote switch.

Inactive • 2019-20 (T-1)
Asda Redhouse Warehouse Doncaster, Redhouse Interchange, Adwick-Le-Street, DN6 7FB (10 components)
• Load curtailment from refridgeration
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Askern 1 CMM Generation Campsall Road Askern Doncaster DN6 0BZ (3 components)
• 1x 2.00MW Containerised Generating sets.
• Gas fired generating sets.
Inactive • 2021-22 (T-4), 2016-17 (TR)
Askern 1 CMM Generation Campsall Road Askern Doncaster DN6 0FD (2 components)

Gas generating unit(s) (2)

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Askern CMM Generation, Campsall Road, Askern, Doncaster DN6 0BZ (4 components)
• Battery storage (2)
• Gas fired generating units
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Askern CMM Generation Campsall Road Askern Doncaster DN6 0FD (2 components)

Gas reciprocating engines (2)

Active • 2025-26 (T-4), 2024-25 (T-1)
Askern CMM Generation, Campsall Road, Askern, Doncaster DN6 0FD (8 components)
• Gas fired generating unit(s)
• Gas fired reciprocating engines
• Gas-fired reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
COTTAGE BACK LANE CAMPSALL DONCASTER DN6 (1 component)

EV charging at residential premises

Inactive • 2023-24 (T-1)
COTTAGE MOSS ROAD ASKERN DONCASTER DN6 (1 component)

EV charging at residential premises

Active • 2026-27 (T-4)
DN6 (5 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-4), 2024-25 (T-1)
Doncaster Road Askern, Doncaster, South Yorkshire, uk, DN6 (1 component)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

Active • 2025-26 (T-1)
Thorpe Marsh Ash Fields Ash Fields Road off Marsh Lane Thorpe in Balne/Barnby Dun Doncaster DN6 0EA (10 components)

New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.

Active • 2028-29 (T-4)
584.36 MW
Thorpe Marsh Ash Fields, Ash Fields Road, off Marsh Lane, Thorpe in Balne/Barnby Dun, Doncaster, DN6 0EA (2 components)

New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.

Active • 2027-28 (T-4)
86.18 MW
Trumfleet Generation Site, Marsh Lane, Trumfleet, Doncaster. DN6 0DU (13 components)
• The CMU will be formed of multiple individual diesel reciprocating generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...