Home Technologies Companies Locations Map Explorer FAQ Trading Board Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Loading...
Loading...

Search Results for "DD8"

10 unique locations (30 components)

Asda Forfar, Site of St James Works DD8 2AE (6 components)
• Load drop (2)
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
COACH KIRKBUDDO DD8 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
DD8 (7 components)
• Domestic demand turn down (2)
• Domestic EV charger
Active • 2027-28 (T-4), 2025-26 (T-1) ...
Land 800m North of Suttieside Road, Forfar, Scotland, DD83NL (1 component)

2 hour Battery Energy Storage System

Active • 2028-29 (T-4)
4.36 MW
Land off Carseview Road, Forfar, DD8 3BS (7 components)
• 3 gas reciprocating engines used for power generation, with associated infrastructure. (2)
• Battery storage and associated infrastructure
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Orchardbank 1 Limited Battery Storage Site, Orchard Loan, Oilfield Machinery Ltd, Orchard Bank Industrial Estate, Forfar, DD8 1TD (1 component)

9.999MW/9.999MWh BESS located to the rear of Dean Park Orchard Loan in Orchardbank Industrial Estate

Active • 2025-26 (T-4)
Orchardbank Battery Storage, Orchard Loan, Oilfield Machinery Ltd, Orchardbank Industrial Estate, Forfar, DD8 1TD (3 components)
• This is a New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS). (2)
• This is an Existing Generation CMU with 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).
Active • 2027-28 (T-4), 2025-26 (T-1) ...
2.81 MW
Orchardbank Business Park, Forfar, Angus, Dundee, Scotland, DD8 1WG (2 components)

New build power station comprised of multiple reciprocating engines. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Orchard Bank Industrial Estate Forfar DD8 1TD (1 component)

9.999 MW battery storage located at Forfar.

Inactive • 2021-22 (T-4)
Loading map...
Showing 10 locations