Home Technologies Companies Locations Map Explorer FAQ Trading Board Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Capacity Market Search
Menu
Home
  • Technologies
  • Companies
  • Locations
  • Map Explorer
  • FAQ
  • Trading Board
  • Buy Me A Coffee
  • Help

  • Login
  • Register

  • Theme
  • Light
  • Dark
  • Auto
  • Welcome to Capacity Market Search
    🗺️ 1 week free trial to explore all features!

    You can explore the basic features, but will need to register for continued access to premium features like the interactive map.

    Choose your contribution amount
    Unlimited access to all premium features

    Secure payment • No subscription • Lifetime access

    Understanding AuctionsSearch ResultsComponent GroupingSortingMap ViewContact Us

    Search Guide

    This registry provides comprehensive search capabilities across all Capacity Market components:

    • Company Search: Enter a company name (e.g., "Drax", "EDF") to see all their components
    • Location Search: Search by city, region, or postcode (e.g., "Manchester", "SW1")
    • CMU ID Search: Enter a specific CMU ID to find exact components
    • Technology Search: Enter technology types like "Hydro", "OCGT", or "Battery"

    The search is intelligent and will try to determine what you're looking for based on your query.

    You can combine search terms to narrow results, such as "London Battery" to find battery storage in London.

    Searches are not case-sensitive, and partial matches are supported (e.g., "Manch" will find "Manchester").

    Understanding Auctions

    The Capacity Market runs regular auctions where providers compete to secure agreements. There are two main types:

    • T-4 auctions: Held 4 years ahead of the delivery year
    • T-1 auctions: Held 1 year ahead to fine-tune capacity requirements

    Each auction results in agreements that specify how much capacity providers must deliver and the payment they'll receive.

    Auction years are displayed as badges (e.g., 2023-24) that you can click to view details for that specific auction year.

    The Capacity Market ensures the UK has sufficient electricity supply during periods of high demand or system stress.

    Providers receive payments for ensuring their capacity is available, creating a more stable and resilient electricity market.

    Search Results

    Search results are grouped by location and show important details about each component:

    • Active Components with auction years 2024-25 or later
    • In-Active Components with only auction years before 2024-25
    • Company Name Click to view all components for this company
    • Technology Click to search for this technology type
    • CMU: XXX Click to search for this CMU ID
    • Auction Year Click to view details for this specific auction

    Each result shows the component's capacity, location details, and participation in specific auction years.

    You can sort results by relevance, location, or date using the sort options.

    Pagination controls appear at the bottom when there are multiple pages of results.

    Component Grouping

    Components at the same location with the same description are grouped together to reduce duplication.

    Each group shows:

    • All CMU IDs for components at that location
    • All auction years, sorted with newest first
    • An Active/Inactive status based on auction years

    Grouping helps identify multi-year contracts and related components at the same site.

    The total capacity shown combines all components in the group.

    Components can be expanded to show individual details by clicking the expand icon.

    Sorting and Filtering

    You can sort search results by:

    • Relevance: Most relevant matches first
    • Location: Alphabetical order by location name
    • Date: By auction year (newest or oldest first)
    • Capacity: Highest or lowest capacity first

    Click the column headers to change sort order.

    You can filter results using the search refinements at the top of the results page:

    • Filter by technology type (e.g., only show batteries)
    • Filter by active status (show only active or inactive components)
    • Filter by auction year (show only components from specific auctions)

    Map Explorer & Map View

    We provide two map-based tools for exploring capacity market data:

    Map Explorer

    The Map Explorer is our advanced interactive mapping tool, specifically designed for comprehensive data exploration with:

    • Mobile-Optimized Interface: Responsive design that works perfectly on phones and tablets
    • Advanced Filtering: Filter by technology type, company, delivery year, and active status
    • Smart Sidebar: Desktop users get a dedicated filter panel, mobile users get collapsible filters
    • Full-Screen Map: Maximizes map space for detailed geographical analysis
    Search Map View

    The Search Map View combines search functionality with map visualization, offering:

    • Search-First Approach: Start with text searches, then visualize results on the map
    • Integrated Results: Search results and map display work together
    • Performance Optimized: Streamlined for fast search result mapping

    Both tools provide a visual representation of capacity distribution across the UK, but serve different exploration needs.

    Map Features:
    • Technology Colors: Different technology types are shown with distinct colors on the map for easy identification:
      GasDSRNuclearCHPSolarWind
      BatteryBiomassHydroInterconnectorCoalOther
    • Technology Legend: The map legend shows all available technologies with their corresponding colors and component counts
    • Search Results on Map: You can view any search results on the map by clicking "View on Map" from search results pages
    • Smart Clustering: Areas with multiple components are automatically grouped into clusters - click clusters to zoom in and see individual components
    • Interactive Markers: Click on individual markers to see detailed information about components at that location

    Use the map controls to zoom in on specific regions or areas of interest. The map automatically adjusts clustering based on your zoom level to provide the clearest view of capacity distribution.

    Contact Us

    We're here to help with any questions about the Capacity Market Registry.

    Email

    For general inquiries and support:

    For LLMs

    Complete programmatic access guide for LLMs:

    Loading...
    Loading...

    Search Results for "CB25"

    9 unique locations (24 components)

    All
  • Active
  • Inactive
  • All Markets
  • Capacity Market
  • SFFR
  • Sort by: Relevance A-Z Components MW Date
    All
  • Active
  • Inactive
  • All Markets
  • Capacity Market
  • SFFR
  • Sort:
    60-70 Reach Road Burwell CB25 0AH(3 components)
    • 10MW of onshore wind generation
    • 40MW of solar generation covering lower Portland Farm and land off Newnam Drove.
    • 49.900MW storage installation
    BatteryOnshore WindSolar PhotovoltaicStorage (Duration 1h)East Anglia Grid Storage One LimitedCB25
    Active • 2024-25 (T-4)
    Ely Road Waterbeach Cambridge Cambridgeshire CB25 9PG(2 components)

    New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)

    Reciprocating enginesCONRAD ENERGY (DEVELOPMENTS) LIMITEDCB25
    Inactive • 2023-24 (T-4), 2022-23 (T-3)
    Goosehall Farm, Factory Road, Burwell, CB25 0BN(2 components)

    A 5MW/5MWh Storage: minimum 1.0 hour duration battery facility sharing an existing connection with an existing solar farm but electrically separate with its own independent Import and Export metering system … (2)

    BatteryStorage (Duration 1h)LIGHTSOURCE SPV 115 LIMITEDCB25
    Active • 2025-26 (T-4), 2022-23 (T-1)
    Land at Weirs Drove, Cambridge, CB25 0BP(5 components)

    49.900MW/49.900MWh battery storage asset, 1 hour duration (3)

    BatteryStorage (Duration 1h)CARE POWER (BURWELL 1) LIMITEDCB25
    Active • 2025-26 (T-4), 2024-25 (T-1) ...
    Land North West Of Electricity Sub-Station Weirs Drove Burwell CB25 0BP(1 component)

    30MW/30MWh one hour battery storage asset located near BURWB1 asset

    BatteryStorage (Duration 1h)CARE POWER (BURWELL 1) LIMITEDCB25
    Active • 2026-27 (T-4)
    3.54 MW
    Land off Ely Road, Chittering, Cambridge, Cambridgeshire, CB25 9PN(5 components)
    • Gas-fired reciprocating engines fitted with heat and CO2 recovery equipment, plus transformers, switch gear and associated controls with a total …
    • Gas-fired reciprocating engines fitted with heat and CO2 recovery equipment, plus transformers, switch gear and associated controls with a total …
    • Gas-fired reciprocating engines fitted with heat and CO2 recovery equipment, plus transformers, switchgear and associated controls with a total connection …
    Combined Heat and Power (CHP)FENLAND GLASSHOUSE LIMITEDCB25
    Active • 2024-25 (T-4), 2023-24 (T-1) ...
    Land to the East of Weirs Drove, Burwell, Cambridge, CB25 0BP, UK(1 component)

    The CMU component at the Burwell Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 49.900MW each.

    BatteryStorageAura Power Storage Solutions LtdCB25
    Inactive • 2021-22 (T-4)
    Site North of Hightown Drove Burwell Cambridgeshire, CB25 0FU(3 components)
    • CMU is a photovoltaic system (2)
    • Burwell MPAN ID: 1050002283664 CMU is a photovoltaic system connected to the transmission system.
    Solar PhotovoltaicEast Anglia Grid Storage One LimitedCB25
    Active • 2026-27 (T-4), 2025-26 (T-1) ...
    5.22 MW
    The fields close to Chear Farm Bungalow, Ely Road, Chittering, Cambridge, CB25 9PN(2 components)
    • FENGEN (CMU) is a load reduction asset using lighting and battery energy storage (BESS) for growing of vegetables on an …
    • FENGH2 (CMU) is a new build generating 06.000MW gas fired CHP plant.
    DSRBatteryCombined Heat and Power (CHP)WATTS FARM SOLAR LIMITEDCB25
    Active • 2028-29 (T-4)
    5.41 MW
    Loading map...
    Welcome to Capacity Market Search
    🗺️ 1 week free trial to explore all features!

    You can explore the basic features, but will need to register for continued access to premium features like the interactive map.

    Choose your contribution amount
    Unlimited access to all premium features

    Secure payment • No subscription • Lifetime access