Search Results for "CB25"

9 unique locations (24 components)

60-70 Reach Road Burwell CB25 0AH (3 components)
• 10MW of onshore wind generation
• 40MW of solar generation covering lower Portland Farm and land off Newnam Drove.
• 49.900MW storage installation
Active • 2024-25 (T-4)
Ely Road Waterbeach Cambridge Cambridgeshire CB25 9PG (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Goosehall Farm, Factory Road, Burwell, CB25 0BN (2 components)

A 5MW/5MWh Storage: minimum 1.0 hour duration battery facility sharing an existing connection with an existing solar farm but electrically separate with its own independent Import and Export metering system … (2)

Active • 2025-26 (T-4), 2022-23 (T-1)
Land at Weirs Drove, Cambridge, CB25 0BP (5 components)

49.900MW/49.900MWh battery storage asset, 1 hour duration (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Land North West Of Electricity Sub-Station Weirs Drove Burwell CB25 0BP (1 component)

30MW/30MWh one hour battery storage asset located near BURWB1 asset

Active • 2026-27 (T-4)
3.54 MW
Land off Ely Road, Chittering, Cambridge, Cambridgeshire, CB25 9PN (5 components)
• Gas-fired reciprocating engines fitted with heat and CO2 recovery equipment, plus transformers, switch gear and associated controls with a total …
• Gas-fired reciprocating engines fitted with heat and CO2 recovery equipment, plus transformers, switch gear and associated controls with a total …
• Gas-fired reciprocating engines fitted with heat and CO2 recovery equipment, plus transformers, switchgear and associated controls with a total connection …
Active • 2024-25 (T-4), 2023-24 (T-1) ...
Land to the East of Weirs Drove, Burwell, Cambridge, CB25 0BP, UK (1 component)

The CMU component at the Burwell Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 49.900MW each.

Inactive • 2021-22 (T-4)
Site North of Hightown Drove Burwell Cambridgeshire, CB25 0FU (3 components)
• CMU is a photovoltaic system (2)
• Burwell MPAN ID: 1050002283664 CMU is a photovoltaic system connected to the transmission system.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
5.22 MW
The fields close to Chear Farm Bungalow, Ely Road, Chittering, Cambridge, CB25 9PN (2 components)
• FENGEN (CMU) is a load reduction asset using lighting and battery energy storage (BESS) for growing of vegetables on an …
• FENGH2 (CMU) is a new build generating 06.000MW gas fired CHP plant.
Active • 2028-29 (T-4)
5.41 MW