Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Search / All Locations / All Postcodes / BS35 / BS35 3TD

Old Gloucester Road, Alveston, Bristol, UK, BS35 3TD

2.25 MW (CMU ALBES1)
Total Capacity
BS35 3TD
Postcode
4
Components
Active*
2026-27
Prequalified
Prequalification (2026)
Existing Generating CMU New Build Generating CMU BR
* Latest auction year on record
Company:
ECOTRICITY (SMART GRID) LIMITED Active 2026 4 components
Descriptions:
β€’ This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable …
β€’ This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable …
β€’ This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable …
Trading Contacts:
ECOTRICITY (SMART GRID) LIMITED

Grid Services

Balancing Reserve (BR)

Total Units 1
Total Revenue Β£842
Energy Delivered 44 MWh
Balancing Reserve Units at this Location
AG-REC05L
ECOTRICITY (SMART GRID) LIMITED
Batteries
Overall Performance:
Total: Β£842
Delivered: 44 MWh
Avg: Β£21.25/MWh
Latest Activity:

Β£15.00/MWh
5.0 MWh
PBR
Other Locations at This Postcode 1 location{{ other_locations|length|pluralize }}

CMU Registry Data

CMU ALBESS
3.671 ECOTRICITY (SMART GRID) …
Prequalified New Build Generating CMU 2026-27 (T-4) Four Year Ahead Capacity Auction
CMU ALBESE
2.715 ECOTRICITY (SMART GRID) …
Prequalified Existing Generating CMU 2025-26 (T-1) One Year Ahead Capacity Auction
CMU ALBES1
2.248 ECOTRICITY (SMART GRID) …
Prequalified New Build Generating CMU 2024-25 (T-1) One Year Ahead Capacity Auction