Home Technologies Companies Locations Map Explorer FAQ Trading Board Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Loading...
Loading...

Search Results for "BS11"

14 unique locations (52 components)

ADM Milling -Avonmouth, Avonmouth Old Dock, Avonmouth, Bristol BS11 9DL, United Kingdom (3 components)

The CMU Component reduces import demand by turning on back up generation. (3)

Active • 2024-25 (T-4), 2023-24 (T-1) ...
Asda Bristol CDC Distribution Centre, St Andrews Road, Kings Weston Lane BS11 9FG (10 components)
• Load curtailment from refridgeration
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Avonmouth Dock, Bristol, Avon, BS11 9DL (3 components)

Flour & semolina milling business (3)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Avonmouth ERF, Severn Road, Chittering, Bristol, BS11 0YU (5 components)
• Twin stream Energy from Waste plant with a connection capacity of 38MW, a construction export guarantee of 34.1MW and a … (2)
• Twin stream Energy from Waste plant with a connection capacity of 37.216MW, a construction export guarantee of 34.1MW and a …
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Bristol Port near Land next to Chittening Road,Bristol,BS11 0YU (2 components)

20 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Bristol Port near Land next to Chittening Road,Bristol,BS11 0YU (2)

Inactive • 2020-21 (T-4), 2017-18 (T-1)
BRISTOL WASTE WATER TREATMENT WORKS, KINGS WESTON LANE, BRISTOL, BS11 0YS (1 component)

On site reduction in consumption

Active • 2024-25 (T-1)
Fire Station Lane, Avonmouth, Bristol, BS11 9EH (4 components)

Gas fired reciprocating engines. (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Poplar Way West. Cabot Park, Avonmouth, Bristol, Avon, BS11 0YW (1 component)

Demand reduction from on-site generation

Inactive • 2017-18 (T-1)
Rockingham South, Smoke Land, Avonmouth BS11 0YT (5 components)
• 3 x 2MW OCGT gas reciprocating engines
• 4 x 2MW OCGT gas reciprocating engines
• 5 x 2MW OCGT gas engines The CMU will using the existing grid connection point use ty the connected CMUs …
Active • 2027-28 (T-4), 2021-22 (T-4) ...
9.44 MW
Rockingham South, Smoke Lane, Avonmouth, BS11 0YT (2 components)
• 2 x 2 MW OCGT gas reciprocating engine
• 5 x 2MW OCGT gas reciprocating engine
Inactive • 2020-21 (T-4)
Rockingham South, Smoke Lane, Avonmouth, BS11 0YT. (1 component)

The CMU will consist of 1 x 2 MW OCGT gas fired engine. It will have its own individual metering arrangements, but will share the grid connection point with 4 …

Inactive • 2022-23 (T-4)
SPILLERS MILLING TD AVONMOUTH DOCK BRISTOL BS11 9DL (1 component)

Flour milling

Inactive • 2017-18 (TR)
Steam Lane, Avonmouth industrial Estate, Bristol, BS11 0YT (2 components)

20 x 1.1MWh battery modules connected to provide 10MW max instantaneous output and 20MWh energy output per day. All batteries are class [XX]. (2)

Active • 2026-27 (T-4), 2023-24 (T-1)
2.36 MW
XPO - Avonmouth, St AndrewsRoad, Avonmouth, Bristol BS11 9HP (12 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Loading map...
Showing 14 locations