Avlon Works, Severn Road, Hallen Bristol, BS10 7ZE, United Kingdom (3 components)
• CHP plant. (2)
• 2 x Gas reciprocating engines with a total rated gross power capacity of 2.758 MW.
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Land Off Severn Road Hallen Bristol South Gloucestershire BS10 7SE (1 component)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

Active • 2028-29 (T-4)
14.66 MW
Plot A Land at Severn Road Avonmouth BS10 7SE (7 components)
• 10 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Avonmouth Energy Park
• 25 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Avonmouth Energy Park
• 5 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Avonmouth Energy Park
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Plot B at Severn Road Avonmouth BS10 7SE (7 components)
• 15.000MW of Battery Energy Storage Systems
• 15MW of Battery Energy Storage Systems
• Existing Generator Battery Energy Storage System
Active • 2025-26 (T-4), 2025-26 (T-1) ...
1.36 MW
Plot B Land at Severn Road Avonmouth BS10 7SE (1 component)

Containerised High Speed Gas-fired reciprocating engines together with transformers, switchgear and associated control gear

Inactive • 2023-24 (T-4)
Plot C Land at Severn Road Avonmouth BS10 7SE (4 components)

The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. … (2)

Inactive • 2023-24 (T-4), 2022-23 (T-4)
Plot C, Land at Severn Road Avonmouth BS10 7SE (3 components)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours (2)

Active • 2027-28 (T-4), 2026-27 (T-4)
27.31 MW
Seabank Power Limited Severn Road, Hallen Bristol BS10 7SP (12 components)

Multi Shaft CCGT (Module 1) (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
2260.43 MW
Seabank Power Limited Severn Road, Hallen, Bristol BS10 7SP (11 components)

Single Shaft CCGT (Module 2) (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1141.17 MW
Severn Road, Almondsbury, Bristol, BS10 7GD (3 components)
• A new build, gas fuelled generation station (2)
• A new build, gas fuelled generation station.
Active • 2027-28 (T-4), 2026-27 (T-4)
47.08 MW
Severn Road, Avonmouth, BS10 7SE (1 component)

Gas fired reciprocating engines.

Inactive • 2022-23 (T-4)
SEVERN ROAD, AVONMOUTH BS10 7SE (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2020-21 (T-4)
Severnside Energy Recovery Centre Severn Road Hallen, Bristol South Gloucestershire BS10 7SP (5 components)
• New Build Energy from Waste Plant (2)
• Existing Energy from Waste Plant
Inactive • 2018-19 (T-1), 2017-18 (T-1) ...