Home Technologies Companies Locations Map Explorer FAQ ChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Home Technologies Companies Locations Map Explorer FAQ ChatGPT Help
Capacity Market Search
Menu
Home
  • Technologies
  • Companies
  • Locations
  • Map Explorer
  • FAQ
  • ChatGPT

  • Help

  • Login
  • Register

  • Theme
  • Light
  • Dark
  • Auto
  • Understanding AuctionsSearch ResultsComponent GroupingSortingMap ViewContact Us

    Search Guide

    This registry provides comprehensive search capabilities across all Capacity Market components:

    • Company Search: Enter a company name (e.g., "Drax", "EDF") to see all their components
    • Location Search: Search by city, region, or postcode (e.g., "Manchester", "SW1")
    • CMU ID Search: Enter a specific CMU ID to find exact components
    • Technology Search: Enter technology types like "Hydro", "OCGT", or "Battery"

    The search is intelligent and will try to determine what you're looking for based on your query.

    You can combine search terms to narrow results, such as "London Battery" to find battery storage in London.

    Searches are not case-sensitive, and partial matches are supported (e.g., "Manch" will find "Manchester").

    Understanding Auctions

    The Capacity Market runs regular auctions where providers compete to secure agreements. There are two main types:

    • T-4 auctions: Held 4 years ahead of the delivery year
    • T-1 auctions: Held 1 year ahead to fine-tune capacity requirements

    Each auction results in agreements that specify how much capacity providers must deliver and the payment they'll receive.

    Auction years are displayed as badges (e.g., 2023-24) that you can click to view details for that specific auction year.

    The Capacity Market ensures the UK has sufficient electricity supply during periods of high demand or system stress.

    Providers receive payments for ensuring their capacity is available, creating a more stable and resilient electricity market.

    Search Results

    Search results are grouped by location and show important details about each component:

    • Active Components with auction years 2024-25 or later
    • In-Active Components with only auction years before 2024-25
    • Company Name Click to view all components for this company
    • Technology Click to search for this technology type
    • CMU: XXX Click to search for this CMU ID
    • Auction Year Click to view details for this specific auction

    Each result shows the component's capacity, location details, and participation in specific auction years.

    You can sort results by relevance, location, or date using the sort options.

    Pagination controls appear at the bottom when there are multiple pages of results.

    Component Grouping

    Components at the same location with the same description are grouped together to reduce duplication.

    Each group shows:

    • All CMU IDs for components at that location
    • All auction years, sorted with newest first
    • An Active/Inactive status based on auction years

    Grouping helps identify multi-year contracts and related components at the same site.

    The total capacity shown combines all components in the group.

    Components can be expanded to show individual details by clicking the expand icon.

    Sorting and Filtering

    You can sort search results by:

    • Relevance: Most relevant matches first
    • Location: Alphabetical order by location name
    • Date: By auction year (newest or oldest first)
    • Capacity: Highest or lowest capacity first

    Click the column headers to change sort order.

    You can filter results using the search refinements at the top of the results page:

    • Filter by technology type (e.g., only show batteries)
    • Filter by active status (show only active or inactive components)
    • Filter by auction year (show only components from specific auctions)

    Map Explorer & Map View

    We provide two map-based tools for exploring capacity market data:

    Map Explorer

    The Map Explorer is our advanced interactive mapping tool, specifically designed for comprehensive data exploration with:

    • Mobile-Optimized Interface: Responsive design that works perfectly on phones and tablets
    • Advanced Filtering: Filter by technology type, company, delivery year, and active status
    • Smart Sidebar: Desktop users get a dedicated filter panel, mobile users get collapsible filters
    • Full-Screen Map: Maximizes map space for detailed geographical analysis
    Search Map View

    The Search Map View combines search functionality with map visualization, offering:

    • Search-First Approach: Start with text searches, then visualize results on the map
    • Integrated Results: Search results and map display work together
    • Performance Optimized: Streamlined for fast search result mapping

    Both tools provide a visual representation of capacity distribution across the UK, but serve different exploration needs.

    Map Features:
    • Technology Colors: Different technology types are shown with distinct colors on the map for easy identification:
      GasDSRNuclearCHPSolarWind
      BatteryBiomassHydroInterconnectorCoalOther
    • Technology Legend: The map legend shows all available technologies with their corresponding colors and component counts
    • Search Results on Map: You can view any search results on the map by clicking "View on Map" from search results pages
    • Smart Clustering: Areas with multiple components are automatically grouped into clusters - click clusters to zoom in and see individual components
    • Interactive Markers: Click on individual markers to see detailed information about components at that location

    Use the map controls to zoom in on specific regions or areas of interest. The map automatically adjusts clustering based on your zoom level to provide the clearest view of capacity distribution.

    Contact Us

    We're here to help with any questions about the Capacity Market Registry.

    Email

    For general inquiries and support:

    For LLMs

    Complete programmatic access guide for LLMs:

    Loading...
    Loading...

    Search Results for "PE1"

    52 unique locations (531 components) - Page 1 of 2

    All Markets
  • Capacity Market
  • SFFR
  • Balancing Reserve
  • NEW
  • Active
  • Inactive
  • Sort by: Relevance A-Z Components MW Date
    110 Oxney Road Great Britain PE1 5NG(3 components)

    Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

    DSRPE1
    Active • 2025-26 (T-4), 2025-26 (T-1)
    0.0098 MW (Est from CMU) (part of 0.01 MW aggregated CMU)
    (Estimated)
    1 To 17 Inclusive, Titan Drive, Peterborough, PE1 5XN(1 component)

    CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

    Storage (Duration 2.5h)PE1
    Active • 2028-29 (T-4)
    0.05 MW (part of 0.05 MW aggregated CMU)
    (Estimated)
    ASDA Store, West Rivergate Shopping Centre Viersen Platz PE1 1ET(12 components)

    Load curtailment from refridgeration

    DSRPE1
    Active • 2028-29 (T-4), 2025-26 (T-4) ...
    31.92 MW (Est from CMU) (part of 31.92 MW aggregated CMU)
    (Estimated)
    Atkinson Street, Peterborough, PE1(1 component)

    Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

    DSRPE1
    Active • 2025-26 (T-1)
    8.23 MW (Est from CMU) (part of 8.23 MW aggregated CMU)
    (Estimated)
    Carisbrooke Way Weston Hills Spalding Lincolnshire PE12(11 components)

    EV charging at residential premises

    DSREV ChargingPE1
    Active • 2027-28 (T-4), 2026-27 (T-4) ...
    No capacity data
    (Estimated)
    Cawood Lane, Gosberton, Spalding, PE11(1 component)

    Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

    DSRPE1
    Active • 2025-26 (T-1)
    8.23 MW (Est from CMU) (part of 8.23 MW aggregated CMU)
    (Estimated)
    Centrica Peterborough Power Station, Storeys Bar Road, Peterborough, PE1 5NT.(23 components)

    Centrica Peterborough Power Station (PPS) is an Open Cycle Gas Turbine (OCGT) electricity generating station.

    Open Cycle Gas Turbine (OCGT)OCGT and Reciprocating Engines (Fuel Type - Gas)PE1
    Active • 2024-25 (T-4), 2023-24 (T-4) ...
    650.00 MW (Est from CMU)
    (Estimated)
    CHURCH ROAD LEVERINGTON WISBECH PE13(4 components)

    EV charging at residential premises

    EV ChargingPE1
    Active • 2027-28 (T-4), 2026-27 (T-4) ...
    0.06 MW (Est from CMU) (part of 0.06 MW aggregated CMU)
    (Estimated)
    Dogsthorpe Landfill Site Welland Road Peterborough Cambridgeshire PE1 3TD(7 components)

    Gas reciprocating engines

    Reciprocating enginesOCGT and Reciprocating Engines (Fuel Type - Gas)PE1
    Active • 2027-28 (T-4), 2026-27 (T-4) ...
    7.64 MW (Est from CMU) (part of 7.64 MW aggregated CMU)
    (Estimated)
    Dogsthorpe Landfill Site Welland Road Peterborough Cambridgeshire PE1 4TE(9 components)

    2 gas reciprocating engines with a combined export output of approximately 2MW. The generating equipment is connected to the distribution network via an import/export meter.

    Reciprocating enginesPE1
    Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
    No capacity data
    (Estimated)
    Elizabeth Court, Cambridgeshire, St. Neots, PE19(1 component)

    Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

    DSRPE1
    Active • 2025-26 (T-1)
    8.23 MW (Est from CMU) (part of 8.23 MW aggregated CMU)
    (Estimated)
    FALLOW CORNER DROVE, MANEA, MARCH, CAMBRIDGESHIRE, PE15(1 component)

    Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

    DSRPE1
    Active • 2025-26 (T-1)
    8.23 MW (Est from CMU) (part of 8.23 MW aggregated CMU)
    (Estimated)
    Farrow Road, Lincolnshire, Spalding, PE12(1 component)

    Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

    DSRPE1
    Active • 2025-26 (T-1)
    8.23 MW (Est from CMU) (part of 8.23 MW aggregated CMU)
    (Estimated)
    Flag Fen STW (Baff), PETERBOROUGH (FLAG FEN) STW, Third Drove, Fengate, PETERBOROUGH, PE1 5QR(8 components)

    The CMU Component reduces import demand by turning on back up generation.

    DSRPE1
    Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
    No capacity data
    (Estimated)
    Fleet Street, Holbeach, Spalding, Lincolnshire, PE12(1 component)

    Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

    DSRPE1
    Active • 2025-26 (T-1)
    8.23 MW (Est from CMU) (part of 8.23 MW aggregated CMU)
    (Estimated)
    Forth Drove, Peterborough PE1 5NT(9 components)

    A Prospective New Build Gas reciprocating energy reserve facility

    Reciprocating enginesOCGT and Reciprocating Engines (Fuel Type - Gas)PE1
    Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
    No capacity data
    (Estimated)
    Friar's Pride Oxney Rd, Peterborough, PE1 5YW, United Kingdom(7 components)

    Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

    DSRPE1
    Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
    No capacity data
    (Estimated)
    ; FURZEFIELD ROAD BEACONSFIELD BUCKINGHAMSHIRE HP9(1 component)

    EV charging at residential premises

    DSRPE1
    Active • 2026-27 (T-4)
    No capacity data
    (Estimated)
    GRANGE ROAD BUSHEY HERTFORDSHIRE WD23(1 component)

    EV charging at residential premises

    DSRPE1
    Active • 2026-27 (T-4)
    No capacity data
    (Estimated)
    Guild Road, Wisbech, PE13(1 component)

    Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

    DSRPE1
    Active • 2025-26 (T-1)
    8.23 MW (Est from CMU) (part of 8.23 MW aggregated CMU)
    (Estimated)
    Haywain Drive Deeping St. Nicholas Spalding PE11(7 components)

    EV charging at residential premises

    DSREV ChargingPE1
    Active • 2024-25 (T-1), 2023-24 (T-1)
    No capacity data
    (Estimated)
    HEADLAND WAY HACONBY BOURNE LINCOLNSHIRE PE10(4 components)

    EV charging at residential premises

    DSREV ChargingPE1
    Active • 2023-24 (T-1)
    0.0084 MW (Est from CMU) (part of 0.01 MW aggregated CMU)
    (Estimated)
    London Road NEWARK NOTTINGHAMSHIRE NG24(1 component)

    EV charging at residential premises

    DSRPE1
    Active • 2027-28 (T-4)
    No capacity data
    (Estimated)
    Old Dover Road Canterbury Kent CT1(1 component)

    EV charging at residential premises

    DSRPE1
    Active • 2027-28 (T-4)
    14.29 MW (Est from CMU) (part of 14.29 MW aggregated CMU)
    (Estimated)
    OUNDLE ROAD ORTON LONGUEVILLE PETERBOROUGH CAMBRIDGESHIRE PE2(1 component)

    EV charging at residential premises

    DSRPE1
    Active • 2027-28 (T-4)
    14.29 MW (Est from CMU) (part of 14.29 MW aggregated CMU)
    (Estimated)
    PE1(13 components)

    Domestic demand turn down

    DSREV ChargingPE1
    Active • 2027-28 (T-4), 2025-26 (T-4) ...
    24.78 MW (Est from CMU) (part of 24.78 MW aggregated CMU)
    (Estimated)
    PE10(43 components)

    Domestic EV charger

    DSREV ChargingPE1
    Active • 2025-26 (T-4), 2025-26 (T-1) ...
    110.93 MW (Est from CMU) (part of 110.93 MW aggregated CMU)
    (Estimated)
    PE11(68 components)

    Domestic demand turn down

    DSREV ChargingPE1
    Active • 2027-28 (T-4), 2025-26 (T-4) ...
    188.39 MW (Est from CMU) (part of 188.39 MW aggregated CMU)
    (Estimated)
    PE12(54 components)

    Domestic EV charger

    DSREV ChargingPE1
    Active • 2025-26 (T-4), 2025-26 (T-1) ...
    284.39 MW (Est from CMU) (part of 284.39 MW aggregated CMU)
    (Estimated)
    PE13(21 components)

    Domestic demand turn down

    DSREV ChargingPE1
    Active • 2027-28 (T-4), 2025-26 (T-4) ...
    22.48 MW (Est from CMU) (part of 22.48 MW aggregated CMU)
    (Estimated)
    PE14(11 components)

    Domestic demand turn down

    DSREV ChargingPE1
    Active • 2027-28 (T-4), 2025-26 (T-4) ...
    41.31 MW (Est from CMU) (part of 41.31 MW aggregated CMU)
    (Estimated)
    PE15(17 components)

    Domestic EV charger

    DSREV ChargingPE1
    Active • 2025-26 (T-4), 2025-26 (T-1) ...
    23.52 MW (Est from CMU) (part of 23.52 MW aggregated CMU)
    (Estimated)
    PE16(8 components)

    Domestic EV

    DSRPE1
    Active • 2025-26 (T-1), 2024-25 (T-1)
    4.83 MW (Est from CMU) (part of 4.83 MW aggregated CMU)
    (Estimated)
    PE19(92 components)

    Domestic demand turn down

    DSREV ChargingPE1
    Active • 2027-28 (T-4), 2025-26 (T-4) ...
    214.88 MW (Est from CMU) (part of 214.88 MW aggregated CMU)
    (Estimated)
    PETERBOROUGH (FLAG FEN) STW, Third Drove, Stanground North, Peterborough, PE1 5YT(23 components)

    Diesel Generator, Perkins

    OCGTPE1
    Inactive • 2017-18 (T-1), 2016-17 (TR)
    2.15 MW (Est from CMU) (part of 2.15 MW aggregated CMU)
    (Estimated)
    Peterborough Power Station, Storeys Bar Road, Peterborough, PE1 5NT(5 components)

    Existing OCGT plant.

    Open Cycle Gas Turbine (OCGT)PE1
    Active • 2028-29 (T-4), 2027-28 (T-4) ...
    918.41 MW (Est from CMU)
    (Estimated)
    PONDTAIL DRIVE, HORSHAM, WEST SUSSEX, RH12(1 component)

    EV charging on residential premises

    DSRPE1
    Active • 2026-27 (T-4)
    No capacity data
    (Estimated)
    Royston Road, London, SE20(1 component)

    EV charging on residential premises

    DSRPE1
    Active • 2026-27 (T-4)
    No capacity data
    (Estimated)
    Southfields, Lincolnshire, Bourne, Lincolnshire, PE10(1 component)

    Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

    DSRPE1
    Active • 2025-26 (T-1)
    8.23 MW (Est from CMU) (part of 8.23 MW aggregated CMU)
    (Estimated)
    South Street, Peterborough, PE1(1 component)

    Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

    DSRPE1
    Active • 2025-26 (T-1)
    8.23 MW (Est from CMU) (part of 8.23 MW aggregated CMU)
    (Estimated)
    Sparrowbill Way Bristol Avon BS34(1 component)

    EV charging at residential premises

    DSRPE1
    Active • 2027-28 (T-4)
    14.29 MW (Est from CMU) (part of 14.29 MW aggregated CMU)
    (Estimated)
    Station Road Spalding Lincolnshire PE11(4 components)

    EV charging at residential premises

    DSREV ChargingPE1
    Active • 2023-24 (T-1)
    0.0084 MW (Est from CMU) (part of 0.01 MW aggregated CMU)
    (Estimated)
    Strongs Bank, Holbeach, PE12(1 component)

    Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

    DSRPE1
    Active • 2025-26 (T-1)
    8.23 MW (Est from CMU) (part of 8.23 MW aggregated CMU)
    (Estimated)
    THE CLOSE AVON CASTLE RINGWOOD HAMPSHIRE BH24(12 components)

    EV charging at residential premises

    DSREV ChargingPE1
    Active • 2027-28 (T-4), 2026-27 (T-4) ...
    27.42 MW (Est from CMU) (part of 27.42 MW aggregated CMU)
    (Estimated)
    The Common, Spalding, Lincolnshire, PE12(1 component)

    Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

    DSRPE1
    Active • 2025-26 (T-1)
    8.23 MW (Est from CMU) (part of 8.23 MW aggregated CMU)
    (Estimated)
    The Pingles, Thurlby , PE10(1 component)

    Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

    DSRPE1
    Active • 2025-26 (T-1)
    8.23 MW (Est from CMU) (part of 8.23 MW aggregated CMU)
    (Estimated)
    Trumps Farm Landfill Site Kitsmead Lane Chertsey Surrey KT16 0DS Peterborough PE1 3TD(2 components)

    2 gas reciprocating engines rated at approximately 1MW each. All associated gas delivery equipment and switchgear is included. The generating units are connected top the distribution network.

    OCGT and Reciprocating Engines (Fuel Type - Gas)PE1
    Active • 2021-22 (T-4)
    No capacity data
    (Estimated)
    VICEROY DRIVE PINCHBECK SPALDING LINCOLNSHIRE PE11(4 components)

    EV charging at residential premises

    DSREV ChargingPE1
    Active • 2023-24 (T-1)
    0.0084 MW (Est from CMU) (part of 0.01 MW aggregated CMU)
    (Estimated)
    VIEW CHURCH ROAD WALPOLE ST. PETER WISBECH CAMBRIDGESHIRE PE14(12 components)

    EV charging at residential premises

    DSREV ChargingPE1
    Active • 2027-28 (T-4), 2026-27 (T-4) ...
    97.73 MW (Est from CMU) (part of 97.73 MW aggregated CMU)
    (Estimated)
    WALNUT ROAD WALPOLE ST. PETER WISBECH CAMBRIDGESHIRE PE14(12 components)

    EV charging at residential premises

    DSREV ChargingPE1
    Active • 2027-28 (T-4), 2026-27 (T-4) ...
    97.73 MW (Est from CMU) (part of 97.73 MW aggregated CMU)
    (Estimated)
    Loading map...
    Welcome to Capacity Market Search
    🗺️ 1 week free trial to explore all features!

    You can explore the basic features, but will need to register for continued access to premium features like the interactive map.

    Choose your contribution amount
    Unlimited access to all premium features

    Secure payment • No subscription • Lifetime access