Home Technologies Companies Locations Map Explorer FAQ Trading Board Buy Me A Coffee Help Login Register
Theme
Light Dark Auto

Blackburn Meadows Power Station, Alsing Road, Tinsley, Sheffield, S9 1HF - A site with a 10MW, 5MWh (2C) Lithium Ion Battery system, the system is connected to the distribution network via the same connection as a nearby biomass power station. The battery system is completely independent in terms of operation, metering, ownership etc to the Biomass Station. The battery system is providing frequency response services (specifically Enhanced Frequency Response (EFR)) to National Grid Electricity Transmission plc.

Component ID: BBM-18
Last updated: 31 Jul 2025 17:25 UTC
CMU ID:
Description:
A site with a 10MW, 5MWh (2C) Lithium Ion Battery system, the system is connected to the distribution network via the same connection as a nearby biomass power station. The battery system is completely independent in terms of operation, metering, ownership etc to the Biomass Station. The battery system is providing frequency response services (specifically Enhanced Frequency Response (EFR)) to National Grid Electricity Transmission plc.
Auction:
2019-20 (T-1) One Year Ahead Capacity Auction

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) N/A
  • De-Rated Capacity (CMU Registry) 1.75
  • Connection Capacity (CMU Registry) 10 MW
  • Anticipated Capacity (CMU Registry) 1.75 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name E.ON UK CHP LIMITED
  • Parent Company (CMU Registry) N/A
  • Secondary Trading Email (CMU Registry) [email protected]
  • Secondary Trading Phone (CMU Registry) 07816292478

Field Value
_id 615393
Type T-1
rank 0.0901673
CMU ID BBM-18
Auction Name 2019-20 (T-1) One Year Ahead Capacity Auction
Component ID BBMBAT
Delivery Year 2019
De-Rated Capacity (empty)
OS Grid Reference SK 398 916
Proven DSR Capacity (empty)
Location and Post Code Blackburn Meadows Power Station, Alsing Road, Tinsley, Sheffield, S9 1HF
Connection / DSR Capacity (empty)
Primary Fuel of Component (empty)
Generating Technology Class Storage (Duration 0.5h)
Description of CMU Components A site with a 10MW, 5MWh (2C) Lithium Ion Battery system, the system is connected to the distribution network via the same connection as a nearby biomass power station. The battery system is completely independent in terms of operation, metering, ownership etc to the Biomass Station. The battery system is providing frequency response services (specifically Enhanced Frequency Response (EFR)) to National Grid Electricity Transmission plc.
Permitted on-Site Generating Unit (empty)
Pre-Refurbishing De-Rated Capacity (empty)
Post-Refurbishing De-Rated Capacity (empty)
Generating Capacity of on-site Generating Unit (empty)

Field Value
_id 2262
Type T-1
CMU ID BBM-18
Auction Capacity Auction
Agent Name (empty)
Beta Value (empty)
Auction Name 2019-20 (T-1) One Year Ahead Capacity Auction
CM Unit Name Blackburn Meadows Battery
CM Unit Type Non CMRS
TEC Deferral (empty)
Unproven DSR (empty)
Delivery Year 2019
Opt Out Status Opt-In
Opt-Out Reason (empty)
Parent Company (empty)
DSR Test Method (empty)
Is FCM required (empty)
CM Unit Category Existing Generating CMU
Storage Facility Yes
De-Rated Capacity 1.75
Name of Applicant E.ON UK CHP LIMITED
Primary Fuel Type Storage - Battery
Registered Holder E.ON UK CHP LIMITED
Annual Penalty Cap 1
Monthly Penalty Cap 2
Proven DSR Capacity (empty)
DSR Bidding Capacity (empty)
Amount of Credit Cover (empty)
Termination Fee 1 Rate Β£5000.00 /MW
Termination Fee 2 Rate Β£25000.00 /MW
Termination Fee 3 Rate Β£10000.00 /MW
Termination Fee 4 Rate Β£15000.00 /MW
Termination Fee 5 Rate Β£35000.00 /MW
Connection / DSR Capacity 10
Maximum Obligation Period 1
Capacity Agreement Awarded Yes
Pre-Qualification Decision Prequalified
Capacity obligation Summary (empty)
Pre-Refurbishing CMU Status (empty)
Transmission / Distribution Distribution
Unique Agreement Identifier CAN-2019-BBM-18-001
New Build Yet to Satisfy FCM (empty)
Planning Consents Conditions (empty)
Anticipated De-Rated Capacity 1.75
Term of the Capacity Agreement 1
Nature of the Security Interest (empty)
CMU confirmed entry into Auction Yes
Is Connection Agreement required (empty)
Pre-Refurbishment Bidding Status (empty)
Secondary Trading Contact - Email [email protected]
Date for provision of deferred TEC (empty)
Pre-Refurbishing De-Rated Capacity (empty)
Date of Issue of Capacity Agreement 2019-07-22
List of Traded Capacity Obligations (empty)
Post-Refurbishing De-Rated Capacity (empty)
Auction Acquired Capacity Obligation 1.75
Date of Issue of DSR Test Certificate (empty)
Has Capacity Agreement been Suspended (empty)
Period for which the transfer applies (empty)
Secondary Trading Contact - Telephone 07816292478
Capacity Agreement has been Terminated (empty)
Duration of Capacity Agreement Awarded 1
Date for Financial Commitment Milestone (empty)
Delivery Years for which Agreement Valid 2019/2020
Connection Agreement Deferral Declaration (empty)
Date of Termination of Capacity Agreement (empty)
Latest Date SCM is expected to be achieved (empty)
Subject to Substantial Completion Milestone (empty)
Subject to a Minimum Completion Requirement (empty)
Earliest Date SCM is expected to be achieved (empty)
Is copy of Grid Connection Agreement required (empty)
Anticipated Pre-Refurbishing De-Rated Capacity (empty)
Anticipated Post-Refurbishing De-Rated Capacity (empty)
Legal Name of any Person with a Security Interest (empty)
Date for provision of deferred Connection Agreement (empty)
Duration of Capacity Agreement in First Bidding Round 1
Long-Stop Date for the Minimum Completion Requirement (empty)