Siemens Energy Construction Site Moray West 400kv Substation, Whitehillock Farm, Aberdeenshire, AB55 5PH The CMU Component is an offshore wind farm. An Ordnance Survey Grid reference of the CMU Component is provided below. - The CMU component is an offshore wind farm which consists of: ? 40 X SGRE DD 222 X 14.7 MW Wind Turbine Generators (WTG). ? 40 X monopile foundations (MP). ? 40 X transition pieces (TP). ? 2x Offshore Substation Platforms (OSP). ? 2x 220kV approx. 50km Offshore Export Cables. ? 40x 66kV associated inter array cables, organised in eight strings connected to OSP 1 and OSP 2. ? Metering equipment installed at the OSP 1 and OSP 2. ? Cable landfall and transition joint close to Portsoy. ? 2x Horizontal Directional Drilled (HDD) ducts below the shoreline. ? 2x 220kV approx. 25km Onshore Export Cables. ? 1x interconnector cable between the OSPs. ? Connection to the National Grid at Blackhillock Substation.

Component ID: MOWWL1
Last updated: 05 Aug 2025 07:45 UTC
CMU ID:
Technology:
Description:
The CMU component is an offshore wind farm which consists of: ? 40 X SGRE DD 222 X 14.7 MW Wind Turbine Generators (WTG). ? 40 X monopile foundations (MP). ? 40 X transition pieces (TP). ? 2x Offshore Substation Platforms (OSP). ? 2x 220kV approx. 50km Offshore Export Cables. ? 40x 66kV associated inter array cables, organised in eight strings connected to OSP 1 and OSP 2. ? Metering equipment installed at the OSP 1 and OSP 2. ? Cable landfall and transition joint close to Portsoy. ? 2x Horizontal Directional Drilled (HDD) ducts below the shoreline. ? 2x 220kV approx. 25km Onshore Export Cables. ? 1x interconnector cable between the OSPs. ? Connection to the National Grid at Blackhillock Substation.
Auction:
2026-27 (T-4) Four Year Ahead Capacity Auction

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) 47.56 MW
  • De-Rated Capacity (CMU Registry) 47.56
  • Connection Capacity (CMU Registry) 573 MW
  • Anticipated Capacity (CMU Registry) 47.56 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name MORAY OFFSHORE WINDFARM (WEST) LIMITED
  • Parent Company (CMU Registry) Moray West Holdings Limited
  • Secondary Trading Email (CMU Registry) [email protected]
  • Secondary Trading Phone (CMU Registry) +4401352748300

Field Value
_id 1596
Type T-4
rank 0.0706241
CMU ID MOWWL1
Auction Name 2026-27 (T-4) Four Year Ahead Capacity Auction
Component ID MOWWL1
Delivery Year 2026
De-Rated Capacity 47.559
OS Grid Reference ND 407 124
Location and Post Code Siemens Energy Construction Site Moray West 400kv Substation, Whitehillock Farm, Aberdeenshire, AB55 5PH The CMU Component is an offshore wind farm. An Ordnance Survey Grid reference of the CMU Component is provided below.
Connection / DSR Capacity 573
Primary Fuel of Component (empty)
Generating Technology Class Offshore Wind
Description of CMU Components The CMU component is an offshore wind farm which consists of: ? 40 X SGRE DD 222 X 14.7 MW Wind Turbine Generators (WTG). ? 40 X monopile foundations (MP). ? 40 X transition pieces (TP). ? 2x Offshore Substation Platforms (OSP). ? 2x 220kV approx. 50km Offshore Export Cables. ? 40x 66kV associated inter array cables, organised in eight strings connected to OSP 1 and OSP 2. ? Metering equipment installed at the OSP 1 and OSP 2. ? Cable landfall and transition joint close to Portsoy. ? 2x Horizontal Directional Drilled (HDD) ducts below the shoreline. ? 2x 220kV approx. 25km Onshore Export Cables. ? 1x interconnector cable between the OSPs. ? Connection to the National Grid at Blackhillock Substation.
Permitted on-Site Generating Unit (empty)
Pre-Refurbishing De-Rated Capacity (empty)
Post-Refurbishing De-Rated Capacity (empty)
Generating Capacity of on-site Generating Unit (empty)

Field Value
_id 13910
Type T-4
CMU ID MOWWL1
Auction Capacity Auction
Agent Name (empty)
Beta Value (empty)
Auction Name 2026-27 (T-4) Four Year Ahead Capacity Auction
CM Unit Name Moray Offshore Windfarm (West) Limited
CM Unit Type CMRS
TEC Deferral (empty)
Unproven DSR (empty)
Delivery Year 2026
Opt Out Status Opt-In
Opt-Out Reason (empty)
Parent Company Moray West Holdings Limited
DSR Test Method (empty)
Is FCM required (empty)
CM Unit Category New Build Generating CMU
Storage Facility No
De-Rated Capacity 47.559
Name of Applicant MORAY OFFSHORE WINDFARM (WEST) LIMITED
Primary Fuel Type Offshore Wind
Registered Holder MORAY OFFSHORE WINDFARM (WEST) LIMITED
Annual Penalty Cap 1
Monthly Penalty Cap 2
Proven DSR Capacity (empty)
DSR Bidding Capacity (empty)
Amount of Credit Cover (empty)
Termination Fee 1 Rate Β£5000.00 /MW
Termination Fee 2 Rate Β£25000.00 /MW
Termination Fee 3 Rate Β£10000.00 /MW
Termination Fee 4 Rate Β£15000.00 /MW
Termination Fee 5 Rate Β£35000.00 /MW
Connection / DSR Capacity 573
Maximum Obligation Period 15
Capacity Agreement Awarded Yes
Pre-Qualification Decision Prequalified
Capacity obligation Summary (empty)
Pre-Refurbishing CMU Status (empty)
Transmission / Distribution Transmission
Unique Agreement Identifier CAN-2026-MOWWL1-001
New Build Yet to Satisfy FCM (empty)
Planning Consents Conditions (empty)
Anticipated De-Rated Capacity 47.559
Term of the Capacity Agreement 15
Nature of the Security Interest (empty)
CMU confirmed entry into Auction Yes
Is Connection Agreement required (empty)
Pre-Refurbishment Bidding Status (empty)
Secondary Trading Contact - Email [email protected]
Date for provision of deferred TEC (empty)
Pre-Refurbishing De-Rated Capacity (empty)
Date of Issue of Capacity Agreement 2023-03-31
List of Traded Capacity Obligations (empty)
Post-Refurbishing De-Rated Capacity (empty)
Auction Acquired Capacity Obligation 47.559
Date of Issue of DSR Test Certificate (empty)
Has Capacity Agreement been Suspended (empty)
Period for which the transfer applies (empty)
Secondary Trading Contact - Telephone '+4401352748300
Capacity Agreement has been Terminated (empty)
Duration of Capacity Agreement Awarded 15
Date for Financial Commitment Milestone (empty)
Delivery Years for which Agreement Valid 2026/2027, 2027/2028, 2028/2029, 2029/2030, 2030/2031, 2031/2032, 2032/2033, 2033/2034, 2034/2035, 2035/2036, 2036/2037, 2037/2038, 2038/2039, 2039/2040, 2040/2041
Connection Agreement Deferral Declaration (empty)
Date of Termination of Capacity Agreement (empty)
Latest Date SCM is expected to be achieved 2025-09-01
Subject to Substantial Completion Milestone Yes
Subject to a Minimum Completion Requirement Yes
Earliest Date SCM is expected to be achieved 2025-01-07
Is copy of Grid Connection Agreement required (empty)
Anticipated Pre-Refurbishing De-Rated Capacity (empty)
Anticipated Post-Refurbishing De-Rated Capacity (empty)
Legal Name of any Person with a Security Interest (empty)
Date for provision of deferred Connection Agreement (empty)
Duration of Capacity Agreement in First Bidding Round 15
Long-Stop Date for the Minimum Completion Requirement 2027-10-01