Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire YO25 9RB (address in planning application) Scurf Dyke Farm, Cranswick, YO25 9RD (address of grid connection point) - The CMU is a 52MW/52MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 26 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 13 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 33 kV Ring Main Unit (RMU)

Component ID: SCU002
Last updated: 30 Jul 2025 10:46 UTC

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) 9.10 MW
  • De-Rated Capacity (CMU Registry) 5.78
  • Connection Capacity (CMU Registry) 48.90 MW
  • Anticipated Capacity (CMU Registry) 5.89 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name FP LUX SCURF DYKE SOLAR LIMITED
  • Parent Company (CMU Registry) N/A
  • Secondary Trading Email (CMU Registry) [email protected]
  • Secondary Trading Phone (CMU Registry) +4401314663689

Field Value
_id 588991
Type T-1
rank 0.0706241
CMU ID SCU002
Auction Name 2023-24 (T-1) One Year Ahead Capacity Auction
Component ID SCU002
Delivery Year 2023
De-Rated Capacity 9.095
OS Grid Reference TA 045 528
Proven DSR Capacity (empty)
Location and Post Code Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire YO25 9RB (address in planning application) Scurf Dyke Farm, Cranswick, YO25 9RD (address of grid connection point)
Connection / DSR Capacity 48.9
Primary Fuel of Component (empty)
Generating Technology Class Storage (Duration 1h)
Description of CMU Components The CMU is a 52MW/52MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 26 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 13 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 33 kV Ring Main Unit (RMU)
Permitted on-Site Generating Unit (empty)
Pre-Refurbishing De-Rated Capacity (empty)
Post-Refurbishing De-Rated Capacity (empty)
Generating Capacity of on-site Generating Unit (empty)

Field Value
_id 14014
Type T-4
CMU ID SCU002
Auction Capacity Auction
Agent Name (empty)
Beta Value (empty)
Auction Name 2026-27 (T-4) Four Year Ahead Capacity Auction
CM Unit Name Scurf Dyke Solar Limited
CM Unit Type Non CMRS
TEC Deferral (empty)
Unproven DSR (empty)
Delivery Year 2026
Opt Out Status Opt-In
Opt-Out Reason (empty)
Parent Company (empty)
DSR Test Method (empty)
Is FCM required (empty)
CM Unit Category New Build Generating CMU
Storage Facility Yes
De-Rated Capacity 5.775
Name of Applicant FP LUX SCURF DYKE SOLAR LIMITED
Primary Fuel Type Storage - Battery
Registered Holder (empty)
Annual Penalty Cap (empty)
Monthly Penalty Cap (empty)
Proven DSR Capacity (empty)
DSR Bidding Capacity (empty)
Amount of Credit Cover 57750
Termination Fee 1 Rate (empty)
Termination Fee 2 Rate (empty)
Termination Fee 3 Rate (empty)
Termination Fee 4 Rate (empty)
Termination Fee 5 Rate (empty)
Connection / DSR Capacity 48.9
Maximum Obligation Period 15
Capacity Agreement Awarded (empty)
Pre-Qualification Decision Not Prequalified
Capacity obligation Summary (empty)
Pre-Refurbishing CMU Status (empty)
Transmission / Distribution Distribution
Unique Agreement Identifier (empty)
New Build Yet to Satisfy FCM (empty)
Planning Consents Conditions (empty)
Anticipated De-Rated Capacity 5.893
Term of the Capacity Agreement (empty)
Nature of the Security Interest (empty)
CMU confirmed entry into Auction (empty)
Is Connection Agreement required (empty)
Pre-Refurbishment Bidding Status (empty)
Secondary Trading Contact - Email [email protected]
Date for provision of deferred TEC (empty)
Pre-Refurbishing De-Rated Capacity (empty)
Date of Issue of Capacity Agreement (empty)
List of Traded Capacity Obligations (empty)
Post-Refurbishing De-Rated Capacity (empty)
Auction Acquired Capacity Obligation (empty)
Date of Issue of DSR Test Certificate (empty)
Has Capacity Agreement been Suspended (empty)
Period for which the transfer applies (empty)
Secondary Trading Contact - Telephone '+4401314663689
Capacity Agreement has been Terminated (empty)
Duration of Capacity Agreement Awarded (empty)
Date for Financial Commitment Milestone (empty)
Delivery Years for which Agreement Valid (empty)
Connection Agreement Deferral Declaration (empty)
Date of Termination of Capacity Agreement (empty)
Latest Date SCM is expected to be achieved (empty)
Subject to Substantial Completion Milestone (empty)
Subject to a Minimum Completion Requirement (empty)
Earliest Date SCM is expected to be achieved (empty)
Is copy of Grid Connection Agreement required (empty)
Anticipated Pre-Refurbishing De-Rated Capacity (empty)
Anticipated Post-Refurbishing De-Rated Capacity (empty)
Legal Name of any Person with a Security Interest (empty)
Date for provision of deferred Connection Agreement (empty)
Duration of Capacity Agreement in First Bidding Round (empty)
Long-Stop Date for the Minimum Completion Requirement (empty)