Home Technologies Companies Locations Map Explorer FAQ Trading Board Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW
TS22 5PW
Last updated: 18 Jul 2025 13:05 UTC
5 Components Battery Storage (Duration 1h) GSES 1 LIMITED
Total Capacity: 0.20 MW
Components: 5
Technologies:
Battery, Storage (Duration 1h)
Unique CMUs: 4

Secondary Trading Contacts

Contact Information

Component Descriptions

1.200MW of battery storage located at Durham.

Used by 1 CMU

1.200MW of storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW

Used by 1 CMU

Battery storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.

Used by 3 CMUs

CMU Identifiers

4 CMUs at this location (showing first 4):

AGABS3 ANC1A1 ANC1B1 ANC1B2

Components at this Location

Click on yellow auction year badges to see individual component pages

1.200MW of storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW
CMU: AGABS3
Storage (Duration 1h) GSES 1 LIMITED Parent: Gore Street Energy Storage Fund PLC
Capacity Information:
De-Rated Capacity (Registry) 1.2
Connection/DSR Capacity 6
Anticipated Capacity 1.198
Battery storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
CMU: ANC1A1
Storage (Duration 1h) GSES 1 LIMITED Parent: Gore Street Energy Storage Fund PLC
Capacity Information:
De-Rated Capacity (Registry) 0.495
Connection/DSR Capacity 4.2
Anticipated Capacity 0.496
CMU: ANC1B1
Storage (Duration 1h) GSES 1 LIMITED Parent: Gore Street Energy Storage Fund PLC
Capacity Information:
De-Rated Capacity (Registry) 0.24
Connection/DSR Capacity 3.1
Anticipated Capacity 0.24
CMU: ANC1B2
Storage (Duration 1h) GSES 1 LIMITED Parent: Gore Street Energy Storage Fund PLC
Capacity Information:
De-Rated Capacity (Registry) 0.27
Connection/DSR Capacity 2.6
Anticipated Capacity 0.27