High Garrett, Sisted, Braintree, Essex, CM77 8BX - CMU component is a 8.444 MWp solar PV site and shares its 10.900 MW export and import MPAN connection with a second PV asset, which has a capacity of 4.997 MWp. This smaller PV site is non-CMU as it it ineligible since it claims the RO subsidy. As the connection is oversized compared to the CMU, the limiting factor to the CMU capacity is the MWp of the generating assets which share the connection. For the applicant CMU, there is 5.903 MW available. This is the difference between the available connection capacity and the MWp capacity of the RO generating asset.

Component ID: NESF04
Last updated: 03 Aug 2025 13:34 UTC
CMU ID:
Primary Fuel:
Solar
Description:
CMU component is a 8.444 MWp solar PV site and shares its 10.900 MW export and import MPAN connection with a second PV asset, which has a capacity of 4.997 MWp. This smaller PV site is non-CMU as it it ineligible since it claims the RO subsidy. As the connection is oversized compared to the CMU, the limiting factor to the CMU capacity is the MWp of the generating assets which share the connection. For the applicant CMU, there is 5.903 MW available. This is the difference between the available connection capacity and the MWp capacity of the RO generating asset.
Auction:
2028-29 (T-4) Four Year Ahead Capacity Auction

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) 0.37 MW
  • De-Rated Capacity (CMU Registry) 0.37
  • Connection Capacity (CMU Registry) 5.85 MW
  • Anticipated Capacity (CMU Registry) 0.37 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name NEXTPOWER HIGH GARRETT LIMITED
  • Parent Company (CMU Registry) NextEnergySolar Holdings III Ltd
  • Secondary Trading Email (CMU Registry) [email protected]
  • Secondary Trading Phone (CMU Registry) +4402039292200

Field Value
_id 530514
Type T-4
rank 0.0573088
CMU ID NESF04
Auction Name 2028-29 (T-4) Four Year Ahead Capacity Auction
Component ID HighGarrett
Delivery Year 2028
De-Rated Capacity 0.366
OS Grid Reference TL 784 264
Location and Post Code High Garrett, Sisted, Braintree, Essex, CM77 8BX
Connection / DSR Capacity 5.853
Primary Fuel of Component Solar
Generating Technology Class Solar Photovoltaic
Description of CMU Components CMU component is a 8.444 MWp solar PV site and shares its 10.900 MW export and import MPAN connection with a second PV asset, which has a capacity of 4.997 MWp. This smaller PV site is non-CMU as it it ineligible since it claims the RO subsidy. As the connection is oversized compared to the CMU, the limiting factor to the CMU capacity is the MWp of the generating assets which share the connection. For the applicant CMU, there is 5.903 MW available. This is the difference between the available connection capacity and the MWp capacity of the RO generating asset.
Permitted on-Site Generating Unit (empty)
Pre-Refurbishing De-Rated Capacity (empty)
Post-Refurbishing De-Rated Capacity (empty)
Generating Capacity of on-site Generating Unit (empty)

Field Value
_id 15782
Type T-4
CMU ID NESF04
Auction Capacity Auction
Agent Name (empty)
Beta Value (empty)
Auction Name 2028-29 (T-4) Four Year Ahead Capacity Auction
CM Unit Name High Garrett
CM Unit Type Non CMRS
TEC Deferral (empty)
Unproven DSR (empty)
Delivery Year 2028
Opt Out Status Opt-In
Opt-Out Reason (empty)
Parent Company NextEnergySolar Holdings III Ltd
DSR Test Method (empty)
Is FCM required (empty)
CM Unit Category Existing Generating CMU
Storage Facility No
De-Rated Capacity 0.366
Name of Applicant NEXTPOWER HIGH GARRETT LIMITED
Primary Fuel Type Solar
Registered Holder NEXTPOWER HIGH GARRETT LIMITED
Annual Penalty Cap 1
Monthly Penalty Cap 2
Proven DSR Capacity (empty)
DSR Bidding Capacity (empty)
Amount of Credit Cover (empty)
Termination Fee 1 Rate Β£5000.00 /MW
Termination Fee 2 Rate Β£25000.00 /MW
Termination Fee 3 Rate Β£10000.00 /MW
Termination Fee 4 Rate Β£15000.00 /MW
Termination Fee 5 Rate Β£35000.00 /MW
Connection / DSR Capacity 5.853
Maximum Obligation Period 1
Capacity Agreement Awarded Yes
Pre-Qualification Decision Prequalified
Capacity obligation Summary (empty)
Pre-Refurbishing CMU Status (empty)
Transmission / Distribution Distribution
Unique Agreement Identifier CAN-2028-NESF04-001
New Build Yet to Satisfy FCM (empty)
Planning Consents Conditions (empty)
Anticipated De-Rated Capacity 0.366
Term of the Capacity Agreement 1
Nature of the Security Interest (empty)
CMU confirmed entry into Auction Yes
Is Connection Agreement required (empty)
Pre-Refurbishment Bidding Status (empty)
Secondary Trading Contact - Email [email protected]
Date for provision of deferred TEC (empty)
Pre-Refurbishing De-Rated Capacity (empty)
Date of Issue of Capacity Agreement 2025-04-04
List of Traded Capacity Obligations (empty)
Post-Refurbishing De-Rated Capacity (empty)
Auction Acquired Capacity Obligation 0.366
Date of Issue of DSR Test Certificate (empty)
Has Capacity Agreement been Suspended (empty)
Period for which the transfer applies (empty)
Secondary Trading Contact - Telephone '+4402039292200
Capacity Agreement has been Terminated (empty)
Duration of Capacity Agreement Awarded 1
Date for Financial Commitment Milestone (empty)
Delivery Years for which Agreement Valid 2028/2029
Connection Agreement Deferral Declaration (empty)
Date of Termination of Capacity Agreement (empty)
Latest Date SCM is expected to be achieved (empty)
Subject to Substantial Completion Milestone (empty)
Subject to a Minimum Completion Requirement (empty)
Earliest Date SCM is expected to be achieved (empty)
Is copy of Grid Connection Agreement required (empty)
Anticipated Pre-Refurbishing De-Rated Capacity (empty)
Anticipated Post-Refurbishing De-Rated Capacity (empty)
Legal Name of any Person with a Security Interest (empty)
Date for provision of deferred Connection Agreement (empty)
Duration of Capacity Agreement in First Bidding Round 1
Long-Stop Date for the Minimum Completion Requirement (empty)