Land east of Bramford Substation, Bullen Lane, Bramford, IP8 4JH
3 Components Storage (Duration 2h) Storage (Duration 4h) DAMSONGREEN ENERGYFARM LIMITED
Total Capacity: 22.99 MW
Components: 3
Technologies:
Storage (Duration 2h), Storage (Duration 4h)
Unique CMUs: 3

Secondary Trading Contacts

Contact Information

Component Descriptions

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Used by 3 CMUs

Components at this Location

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
CMU: PPBF22
Storage (Duration 2h) DAMSONGREEN ENERGYFARM LIMITED Parent: EDF Energy Renewables Ltd
Capacity Information:
De-Rated Capacity (Registry) 8.979
Connection/DSR Capacity 38
Anticipated Capacity 8.979
CMU: PPBF23
Storage (Duration 2h) DAMSONGREEN ENERGYFARM LIMITED Parent: EDF Energy Renewables Ltd
Capacity Information:
De-Rated Capacity (Registry) 12.461
Connection/DSR Capacity 54.965
Anticipated Capacity 12.461
CMU: PPBF24
Storage (Duration 4h) PIVOTED POWER LLP Parent: EDF Energy Renewables Ltd
Capacity Information:
De-Rated Capacity (Registry) 14.007
Connection/DSR Capacity 25.857
Anticipated Capacity 14.007