Land to the East of Bumble Bee Farm Gainsborough Road (A620) Saundby DN22 9ER
DN22 9ER
Last updated: 08 Aug 2025 15:16 UTC
2 Components Storage (Duration 1.5h) ENSO GREEN HOLDINGS LIMITED
Total Capacity: 31.60 MW
Components: 2
Technologies:
Storage (Duration 1.5h)
Unique CMUs: 2

Secondary Trading Contacts

Component Descriptions

A 110.000 MW / 165.000 MWh battery energy storage system

Used by 1 CMU

A 120.000 MW / 180.000 MWh battery energy storage system

Used by 1 CMU

CMU Identifiers

Components at this Location

Click on yellow auction year badges to see individual component pages

A 110.000 MW / 165.000 MWh battery energy storage system
CMU: WESB02
Storage (Duration 1.5h) ENSO GREEN HOLDINGS LIMITED Parent: CERO GENERATION HOLDINGS UK LIMITED
Capacity Information:
De-Rated Capacity (Registry) 12.672
Connection/DSR Capacity 110
Anticipated Capacity 12.672
2027-28 (T-4) Four Year Ahead Capacity Auction
A 120.000 MW / 180.000 MWh battery energy storage system
CMU: WSB001
Storage (Duration 1.5h) ENSO GREEN HOLDINGS A LIMITED Parent: Cero Generation Holdings UK Limited
Capacity Information:
De-Rated Capacity (Registry) 18.924
Connection/DSR Capacity 120
Anticipated Capacity 18.924
2028-29 (T-4) Four Year Ahead Capacity Auction