Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS
11 Components Storage (Duration 1h) Storage (Duration 1.5h) THRIVE RENEWABLES (WICKEN) LIMITED
Total Capacity: 1.46 MW
Components: 11
Technologies:
Storage (Duration 1h), Storage (Duration 1.5h)
Unique CMUs: 4

Secondary Trading Contacts

Contact Information

Component Descriptions

A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.

Used by 1 CMU

A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.

Used by 3 CMUs

Components at this Location

A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.
CMU: WKN001
Capacity Information:
De-Rated Capacity (Registry) 0.981
Connection/DSR Capacity 4.804
Anticipated Capacity 1.022
A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.
CMU: WKN004
Storage (Duration 1.5h) THRIVE RENEWABLES (WICKEN) LIMITED
Capacity Information:
De-Rated Capacity (Registry) 1.855
Connection/DSR Capacity 4.804
Anticipated Capacity 1.931
CMU: WKN005
Capacity Information:
De-Rated Capacity (Registry) 0.567
Connection/DSR Capacity 4.804
Anticipated Capacity 0.591