Search Map View Statistics Support Us Help Login Register
West of Sellindge Substation, Church Lane, Sellindge, Aldington, Ashford TN25 6AF
1 Component Storage (Duration 2h) PIVOTED POWER LLP
Total Capacity: 8.03 MW
Components: 1
Technologies:
Storage (Duration 2h)
Unique CMUs: 1

Secondary Trading Contacts

Contact Information

Component Descriptions

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Used by 1 CMU

CMU Identifiers

Components at this Location

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
CMU: PPSL22
Storage (Duration 2h) PIVOTED POWER LLP Parent: Pivot Power (Holding) Limited
Capacity Information:
De-Rated Capacity (Registry) 8.034
Connection/DSR Capacity 34
Anticipated Capacity 8.034