Search Map View Statistics Support Us Help Login Register
Land off, Old School, Lane Hereford, HR4 9BP
3 Components Storage (Duration 1h) Combined Heat and Power (CHP) NORIKER PERSEVERANCE LTD
Total Capacity: 7.13 MW
Components: 3
Technologies:
Storage (Duration 1h), Combined Heat and Power (CHP)
Unique CMUs: 3

Secondary Trading Contacts

Contact Information

Component Descriptions

A 13MW New Build Battery Storage site

Used by 1 CMU

A 6MW New Build CHP site

Used by 1 CMU

A New Build Battery Storage site

Used by 1 CMU

Components at this Location

A 13MW New Build Battery Storage site
CMU: PERSB2
Storage (Duration 1h) NORIKER PERSEVERANCE LTD Parent: Terra Firma (Wingrave) Ltd
Capacity Information:
De-Rated Capacity (Registry) 3.22
Connection/DSR Capacity 13
Anticipated Capacity 3.22
A 6MW New Build CHP site
CMU: PERSG3
Combined Heat and Power (CHP) NORIKER PERSEVERANCE LTD Parent: Terra Firma (Wingrave) Ltd
Capacity Information:
De-Rated Capacity (Registry) 5.48
Connection/DSR Capacity 6
Anticipated Capacity 5.48
A New Build Battery Storage site
CMU: PERSB3
Storage (Duration 1h) NORIKER PERSEVERANCE LTD Parent: Terra Firma (Wingrave) Ltd
Capacity Information:
De-Rated Capacity (Registry) 1.653
Connection/DSR Capacity 14
Anticipated Capacity 1.653