Tongland, Kirkcudbrightshire, DG6 4LT, Scotland
DG6 4LT
Last updated: 08 Aug 2025 12:05 UTC
21 Components Hydro DRAX RIVER HYDRO LIMITED
Total Capacity: 91.75 MW
Components: 21
Technologies:
Hydro
Unique CMUs: 6

Secondary Trading Contacts

Contact Information

Component Descriptions

Tongland hydro power station - Unit 1, part of the Galloway hydroelectric scheme

Used by 4 CMUs

Tongland hydro power station - Unit 1, part of the Galloway hydroelectric scheme The registered capacity of the Tongland power station is 41.25MVA or 33MW at 0.8PF and each of the 3 identical generating unit components is 11MW.

Used by 2 CMUs

Tongland hydro power station - Unit 2, part of the Galloway hydroelectric scheme

Used by 4 CMUs

Tongland hydro power station - Unit 2, part of the Galloway hydroelectric scheme The registered capacity of the Tongland Power Station is 41.25MVA or 33MW at 0.8PF and each of the 3 identical generating unit components are 11MW.

Used by 2 CMUs

Tongland hydro power station - Unit 3, part of the Galloway hydroelectric scheme

Used by 4 CMUs

Tongland hydro power station - Unit 3, part of the Galloway hydroelectric scheme The registered capacity of the Tongland Power Station is 41.25MVA or 33MW at 0.8PF and each of the 3 identical generating unit components are 11MW.

Used by 2 CMUs

Components at this Location

Click on yellow auction year badges to see individual component pages

Tongland hydro power station - Unit 1, part of the Galloway hydroelectric scheme
CMU: DX21TO
Hydro DRAX RIVER HYDRO LIMITED Parent: Drax Hydro Limited
Capacity Information:
De-Rated Capacity (Registry) 31.763
Connection/DSR Capacity 34.847
Anticipated Capacity 31.763
2025-26 (T-4) Four Year Ahead Capacity Auction
CMU: DX22TO
Hydro DRAX RIVER HYDRO LIMITED Parent: Drax Hydro Limited
Capacity Information:
De-Rated Capacity (Registry) 31.628
Connection/DSR Capacity 34.706
Anticipated Capacity 31.628
2026-27 (T-4) Four Year Ahead Capacity Auction
CMU: DX23TO
Hydro DRAX RIVER HYDRO LIMITED Parent: Drax Hydro Limited
Capacity Information:
De-Rated Capacity (Registry) 30.096
Connection/DSR Capacity 33
Anticipated Capacity 30.096
2027-28 (T-4) Four Year Ahead Capacity Auction
CMU: DX24TO
Hydro DRAX RIVER HYDRO LIMITED Parent: Drax Hydro Limited
Capacity Information:
De-Rated Capacity (Registry) 30.03
Connection/DSR Capacity 33
Anticipated Capacity 30.03
2028-29 (T-4) Four Year Ahead Capacity Auction
Tongland hydro power station - Unit 1, part of the Galloway hydroelectric scheme The registered capacity of the Tongland power station is 41.25MVA or 33MW at 0.8PF and each of the 3 identical generating unit components is 11MW.
CMU: DX19TO
Hydro DRAX RIVER HYDRO LIMITED Parent: Drax Hydro Limited
Capacity Information:
De-Rated Capacity (Registry) 29.586
Connection/DSR Capacity 33
Anticipated Capacity 29.585
2023-24 (T-4) Four Year Ahead Capacity Auction 2022-23 (T-3) Three Year Ahead Capacity Auction
CMU: DX20TO
Hydro DRAX RIVER HYDRO LIMITED Parent: Drax Hydro Limited
Capacity Information:
De-Rated Capacity (Registry) 30.027
Connection/DSR Capacity 33
Anticipated Capacity 30.027
2024-25 (T-4) Four Year Ahead Capacity Auction
Tongland hydro power station - Unit 2, part of the Galloway hydroelectric scheme
CMU: DX21TO
Hydro DRAX RIVER HYDRO LIMITED Parent: Drax Hydro Limited
Capacity Information:
De-Rated Capacity (Registry) 31.763
Connection/DSR Capacity 34.847
Anticipated Capacity 31.763
2025-26 (T-4) Four Year Ahead Capacity Auction
CMU: DX22TO
Hydro DRAX RIVER HYDRO LIMITED Parent: Drax Hydro Limited
Capacity Information:
De-Rated Capacity (Registry) 31.628
Connection/DSR Capacity 34.706
Anticipated Capacity 31.628
2026-27 (T-4) Four Year Ahead Capacity Auction
CMU: DX23TO
Hydro DRAX RIVER HYDRO LIMITED Parent: Drax Hydro Limited
Capacity Information:
De-Rated Capacity (Registry) 30.096
Connection/DSR Capacity 33
Anticipated Capacity 30.096
2027-28 (T-4) Four Year Ahead Capacity Auction
CMU: DX24TO
Hydro DRAX RIVER HYDRO LIMITED Parent: Drax Hydro Limited
Capacity Information:
De-Rated Capacity (Registry) 30.03
Connection/DSR Capacity 33
Anticipated Capacity 30.03
2028-29 (T-4) Four Year Ahead Capacity Auction
Tongland hydro power station - Unit 2, part of the Galloway hydroelectric scheme The registered capacity of the Tongland Power Station is 41.25MVA or 33MW at 0.8PF and each of the 3 identical generating unit components are 11MW.
CMU: DX19TO
Hydro DRAX RIVER HYDRO LIMITED Parent: Drax Hydro Limited
Capacity Information:
De-Rated Capacity (Registry) 29.586
Connection/DSR Capacity 33
Anticipated Capacity 29.585
2023-24 (T-4) Four Year Ahead Capacity Auction 2022-23 (T-3) Three Year Ahead Capacity Auction
CMU: DX20TO
Hydro DRAX RIVER HYDRO LIMITED Parent: Drax Hydro Limited
Capacity Information:
De-Rated Capacity (Registry) 30.027
Connection/DSR Capacity 33
Anticipated Capacity 30.027
2024-25 (T-4) Four Year Ahead Capacity Auction
Tongland hydro power station - Unit 3, part of the Galloway hydroelectric scheme
CMU: DX21TO
Hydro DRAX RIVER HYDRO LIMITED Parent: Drax Hydro Limited
Capacity Information:
De-Rated Capacity (Registry) 31.763
Connection/DSR Capacity 34.847
Anticipated Capacity 31.763
2025-26 (T-4) Four Year Ahead Capacity Auction
CMU: DX22TO
Hydro DRAX RIVER HYDRO LIMITED Parent: Drax Hydro Limited
Capacity Information:
De-Rated Capacity (Registry) 31.628
Connection/DSR Capacity 34.706
Anticipated Capacity 31.628
2026-27 (T-4) Four Year Ahead Capacity Auction
CMU: DX23TO
Hydro DRAX RIVER HYDRO LIMITED Parent: Drax Hydro Limited
Capacity Information:
De-Rated Capacity (Registry) 30.096
Connection/DSR Capacity 33
Anticipated Capacity 30.096
2027-28 (T-4) Four Year Ahead Capacity Auction
CMU: DX24TO
Hydro DRAX RIVER HYDRO LIMITED Parent: Drax Hydro Limited
Capacity Information:
De-Rated Capacity (Registry) 30.03
Connection/DSR Capacity 33
Anticipated Capacity 30.03
2028-29 (T-4) Four Year Ahead Capacity Auction
Tongland hydro power station - Unit 3, part of the Galloway hydroelectric scheme The registered capacity of the Tongland Power Station is 41.25MVA or 33MW at 0.8PF and each of the 3 identical generating unit components are 11MW.
CMU: DX19TO
Hydro DRAX RIVER HYDRO LIMITED Parent: Drax Hydro Limited
Capacity Information:
De-Rated Capacity (Registry) 29.586
Connection/DSR Capacity 33
Anticipated Capacity 29.585
2023-24 (T-4) Four Year Ahead Capacity Auction 2022-23 (T-3) Three Year Ahead Capacity Auction
CMU: DX20TO
Hydro DRAX RIVER HYDRO LIMITED Parent: Drax Hydro Limited
Capacity Information:
De-Rated Capacity (Registry) 30.027
Connection/DSR Capacity 33
Anticipated Capacity 30.027
2024-25 (T-4) Four Year Ahead Capacity Auction