Trident Park ERF, Glass Avenue, Cardiff, CF24 5EN
CF24 5EN
Last updated: 08 Aug 2025 02:20 UTC
12 Components Coal/biomass Energy from Waste VIRIDOR ENERGY LIMITED
Total Capacity: 128.23 MW
Components: 12
Technologies:
Coal/biomass, Energy from Waste
Unique CMUs: 5

Secondary Trading Contacts

Contact Information

Component Descriptions

CARvwm is an Energy Recovery Facility (ERF) which can generate up to 35MW of power, although it is currently constrained by a grid connection of 31.43MW (at export meter point)

Used by 1 CMU

Twin stream Energy Recovery Facility (ERF) or Energy from Waste located in Glass Avenue, Cardiff.

Used by 2 CMUs

Twin stream Energy Recovery Facility (ERF) or Energy from Waste which can generate up to 35MW of power, although it is currently constrained by a grid connection of 31.43MW (at export meter point). Located in Glass Avenue, Cardiff.

Used by 1 CMU

Twin stream Energy Recovery Facility (ERF) or Energy from Waste which can generate up to 37.5MW of power and export up to 35MW. Located in Glass Avenue, Cardiff.

Used by 2 CMUs

Components at this Location

Click on yellow auction year badges to see individual component pages

CARvwm is an Energy Recovery Facility (ERF) which can generate up to 35MW of power, although it is currently constrained by a grid connection of 31.43MW (at export meter point)
CMU: CARvwm
Coal/biomass VIRIDOR ENERGY LIMITED Parent: Viridor Energy (Investments Two) Limited
Capacity Information:
De-Rated Capacity (Registry) 27.526
Connection/DSR Capacity 31.43
Anticipated Capacity 27.526
2021-22 (T-4) Four Year Ahead Capacity Auction
Twin stream Energy Recovery Facility (ERF) or Energy from Waste located in Glass Avenue, Cardiff.
CMU: CARD21
Energy from Waste VIRIDOR ENERGY LIMITED Parent: Viridor Energy (Investments Two) Limited
Capacity Information:
De-Rated Capacity (Registry) 30.797
Connection/DSR Capacity 35
Anticipated Capacity 30.797
2028-29 (T-4) Four Year Ahead Capacity Auction 2027-28 (T-4) Four Year Ahead Capacity Auction
CMU: CARD24
Energy from Waste VIRIDOR ENERGY LIMITED Parent: Viridor Energy (Investments Two) Limited
Capacity Information:
De-Rated Capacity (Registry) 32.416
Connection/DSR Capacity 36.824
Anticipated Capacity 32.416
2028-29 (T-4) Four Year Ahead Capacity Auction
Twin stream Energy Recovery Facility (ERF) or Energy from Waste which can generate up to 35MW of power, although it is currently constrained by a grid connection of 31.43MW (at export meter point). Located in Glass Avenue, Cardiff.
CMU: CARD18
Energy from Waste VIRIDOR ENERGY LIMITED Parent: Viridor Energy (Investments Two) Limited
Capacity Information:
De-Rated Capacity (Registry) 26.97
Connection/DSR Capacity 31.43
Anticipated Capacity 26.97
Twin stream Energy Recovery Facility (ERF) or Energy from Waste which can generate up to 37.5MW of power and export up to 35MW. Located in Glass Avenue, Cardiff.
CMU: CARD20
Energy from Waste VIRIDOR ENERGY LIMITED Parent: Viridor Energy (Investments Two) Limited
Capacity Information:
De-Rated Capacity (Registry) 29.68
Connection/DSR Capacity 35
Anticipated Capacity 29.68
2024-25 (T-4) Four Year Ahead Capacity Auction
CMU: CARD21
Energy from Waste VIRIDOR ENERGY LIMITED Parent: Viridor Energy (Investments Two) Limited
Capacity Information:
De-Rated Capacity (Registry) 30.797
Connection/DSR Capacity 35
Anticipated Capacity 30.797
2026-27 (T-4) Four Year Ahead Capacity Auction 2025-26 (T-4) Four Year Ahead Capacity Auction