Land north west of Bredbury Substation Welkin Road Bredbury, Stockport SK6 2BS
4 Components Storage (Duration 2h) Storage (Duration 9h) PIVOTED POWER LLP
Total Capacity: 27.15 MW
Components: 4
Technologies:
Storage (Duration 2h), Storage (Duration 9h)
Unique CMUs: 4

Secondary Trading Contacts

Contact Information

Component Descriptions

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Used by 4 CMUs

Components at this Location

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
CMU: PPBB21
Storage (Duration 2h) PIVOTED POWER LLP Parent: Pivot Power (Holding) Limited
Capacity Information:
De-Rated Capacity (Registry) 16.289
Connection/DSR Capacity 41
Anticipated Capacity 16.289
CMU: PPBB22
Storage (Duration 2h) PIVOTED POWER LLP Parent: Pivot Power (Holding) Limited
Capacity Information:
De-Rated Capacity (Registry) 8.034
Connection/DSR Capacity 34
Anticipated Capacity 8.034
CMU: PPBB23
Storage (Duration 9h) PIVOTED POWER LLP Parent: Pivot Power (Holding) Limited
Capacity Information:
De-Rated Capacity (Registry) 6.039
Connection/DSR Capacity 6.399
Anticipated Capacity 6.039
CMU: PPBB24
Storage (Duration 2h) PIVOTED POWER LLP Parent: Pivot Power (Holding) Limited
Capacity Information:
De-Rated Capacity (Registry) 13.072
Connection/DSR Capacity 48.146
Anticipated Capacity 13.072