Home Technologies Companies Locations Map Explorer FAQ Trading Board Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Plot B at Severn Road Avonmouth BS10 7SE
BS10 7SE
Last updated: 27 Jul 2025 17:42 UTC
7 Components Battery Storage Storage (Duration 1h) Hallen Energy Ltd
Total Capacity: 1.36 MW
Components: 7
Technologies:
Battery, Storage, Storage (Duration 1h)
Unique CMUs: 3

Secondary Trading Contacts

Component Descriptions

10.000MW DSR

Used by 1 CMU

15.000MW of Battery Energy Storage Systems

Used by 1 CMU

15MW of Battery Energy Storage Systems

Used by 1 CMU

Existing Generator Battery Energy Storage System

Used by 1 CMU

New Build Battery Energy Storage Systems

Used by 1 CMU

The CMU will be formed of multiple individual Batteries. This site is to include a 17MW Battery Energy Storage System (BESS) that can either operate as import or export at will. The 17MW connection is to be provided at 33KV by installing an underground cable with a metering circuit breaker located at the customer's site.

Used by 1 CMU

CMU Identifiers

3 CMUs at this location (showing first 3):

AVON02 NB_108 NB_308

Components at this Location

Click on yellow auction year badges to see individual component pages

15.000MW of Battery Energy Storage Systems
CMU: NB_308
Storage (Duration 1h) Hallen Energy Ltd Parent: Voltalia SA
Capacity Information:
De-Rated Capacity (Registry) 2.994
Connection/DSR Capacity 15
Anticipated Capacity 2.994
15MW of Battery Energy Storage Systems
CMU: NB_108
Storage (Duration 1h) Voltalia UK Ltd Parent: Voltalia SA
Capacity Information:
De-Rated Capacity (Registry) 3.716
Connection/DSR Capacity 15
Anticipated Capacity 3.716
Existing Generator Battery Energy Storage System
CMU: NB_308
Storage (Duration 1h) Hallen Energy Ltd Parent: Voltalia SA
Capacity Information:
De-Rated Capacity (Registry) 2.994
Connection/DSR Capacity 15
Anticipated Capacity 2.994
New Build Battery Energy Storage Systems
CMU: NB_308
Storage (Duration 1h) Hallen Energy Ltd Parent: Voltalia SA
Capacity Information:
De-Rated Capacity (Registry) 2.994
Connection/DSR Capacity 15
Anticipated Capacity 2.994
The CMU will be formed of multiple individual Batteries. This site is to include a 17MW Battery Energy Storage System (BESS) that can either operate as import or export at will. The 17MW connection is to be provided at 33KV by installing an underground cable with a metering circuit breaker located at the customer's site.
CMU: AVON02
Storage Hallen Energy Ltd Parent: Voltalia SA
Capacity Information:
De-Rated Capacity (Registry) 6.089
Connection/DSR Capacity 16.71
Anticipated Capacity 16.339