4 Components Battery Storage (Duration 2h) Zenobe Wishaw Limited Balancing Reserve
Total Capacity: N/A
Components: 4
Technologies:
Battery, Storage (Duration 2h)
Unique CMUs: 3

Secondary Trading Contacts

Contact Information

Component Descriptions

49.95MW Battery Storage site at Wishaw. Connected via 33kV substation directly to Transmission network.

Used by 1 CMU

49.95MW Battery Storage site at Wishaw, split into two BMU's (which are not yet registered). Connected via 33kV substation directly to Transmission network.

Used by 1 CMU

49.9MW Battery Storage site at Wishaw, split into two BMU's (which are not yet registered). Connected via 33kV substation directly to Transmission network.

Used by 1 CMU

CMU Identifiers

3 CMUs at this location (showing first 3):

NBWSH1 NBWSH2 NBWSH3

Balancing Reserve

1 Balancing Unit
Technologies: Batteries
Cross-Market Intelligence: This location participates in both the Capacity Market (above) and Balancing Reserve Market (below), providing grid balancing and reserve services.
CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED 1 unit
Technologies: Batteries
Balancing Units:
WISHB-1 Batteries
Operated by CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED
Location: Land at Netherton Street, Netherton, Wishaw, North Lanarkshire, ML2 0EF ML2
Latest Activity:
Jul 1, 2025
Clearing Price:
Β£13.52/MW/h
Executed: 12.0 MW Balancing Reserve
Data updated: Jul 27, 2025 09:11
Note: Balancing Reserve units provide essential grid stability services through rapid response capabilities during supply/demand imbalances.

Components at this Location

Click on yellow auction year badges to see individual component pages

49.95MW Battery Storage site at Wishaw. Connected via 33kV substation directly to Transmission network.
CMU: NBWSH3
Storage (Duration 2h) Zenobe Wishaw Limited Parent: BESS HOLDCO 2 LIMITED
Capacity Information:
De-Rated Capacity (Registry) 11.324
Connection/DSR Capacity 49.95
Anticipated Capacity 11.324
49.95MW Battery Storage site at Wishaw, split into two BMU's (which are not yet registered). Connected via 33kV substation directly to Transmission network.
CMU: NBWSH2
Storage (Duration 2h) Zenobe Wishaw Limited Parent: BESS HOLDCO 2 LIMITED
Capacity Information:
De-Rated Capacity (Registry) 18.491
Connection/DSR Capacity 49.95
Anticipated Capacity 18.491
49.9MW Battery Storage site at Wishaw, split into two BMU's (which are not yet registered). Connected via 33kV substation directly to Transmission network.
CMU: NBWSH1
Storage (Duration 2h) Zenobe Wishaw Limited Parent: BESS HOLDCO 2 LIMITED
Capacity Information:
De-Rated Capacity (Registry) 19.846
Connection/DSR Capacity 49.95
Anticipated Capacity 19.845