adjacent to National Grid Stalybridge substation SK15 3DA
SK15 3DA
Last updated: 02 Aug 2025 15:45 UTC
3 Components Battery Storage (Duration 2h) Storage (Duration 4h) Zenobe Stalybridge Limited
Total Capacity: 58.53 MW
Components: 3
Technologies:
Battery, Storage (Duration 2h), Storage (Duration 4h)
Unique CMUs: 2

Secondary Trading Contacts

Contact Information

Component Descriptions

150MW battery storage located near to the National Grid Stalybridge substation, split into two BMU's

Used by 1 CMU

75MW battery storage located near to the National Grid Stalybridge substation.

Used by 1 CMU

CMU Identifiers

2 CMUs at this location (showing first 2):

NBSTL1 NBSTL2

Components at this Location

Click on yellow auction year badges to see individual component pages

150MW battery storage located near to the National Grid Stalybridge substation, split into two BMU's
CMU: NBSTL1
Storage (Duration 2h) Zenobe Stalybridge Limited Parent: Zenobe Energy Limited
Capacity Information:
De-Rated Capacity (Registry) 35.445
Connection/DSR Capacity 150
Anticipated Capacity 35.445
2026-27 (T-4) Four Year Ahead Capacity Auction (2/2) 2 2026-27 (T-4) Four Year Ahead Capacity Auction (1/2) 2
75MW battery storage located near to the National Grid Stalybridge substation.
CMU: NBSTL2
Storage (Duration 4h) Zenobe Stalybridge Limited Parent: Zenobe Energy Limited
Capacity Information:
De-Rated Capacity (Registry) 23.085
Connection/DSR Capacity 75
Anticipated Capacity 23.085
2027-28 (T-4) Four Year Ahead Capacity Auction