Home Technologies Companies Locations Map Explorer FAQ Trading Board Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Port Clarence Energy Limited, off Huntsman Drive, Stockton on Tees, TS2 1UE
TS2 1UE
Last updated: 31 Jul 2025 19:10 UTC
2 Components Energy from Waste PORT CLARENCE ENERGY LIMITED
Total Capacity: 53.58 MW
Components: 2
Technologies:
Energy from Waste
Unique CMUs: 2

Secondary Trading Contacts

Component Descriptions

Steam Turbine Generator

Used by 1 CMU

The CMU is a Waste-to-Energy facility located in Port Clarence. The facility is designed to process waste feedstock and recover energy via a Steam Turbine Generator.

Used by 1 CMU

CMU Identifiers

2 CMUs at this location (showing first 2):

PCEL01 PCEL02

Components at this Location

Click on yellow auction year badges to see individual component pages

Steam Turbine Generator
CMU: PCEL01
Energy from Waste PORT CLARENCE ENERGY LIMITED Parent: WOMBLE ENERGY LIMITED
Capacity Information:
De-Rated Capacity (Registry) 28
Connection/DSR Capacity 31.822
Anticipated Capacity 28
The CMU is a Waste-to-Energy facility located in Port Clarence. The facility is designed to process waste feedstock and recover energy via a Steam Turbine Generator.
CMU: PCEL02
Energy from Waste PORT CLARENCE ENERGY LIMITED Parent: CEP TEESSIDE BIOMASS LIMITED
Capacity Information:
De-Rated Capacity (Registry) 25.582
Connection/DSR Capacity 28.9
Anticipated Capacity 25.582