Home Technologies Companies Locations Map Explorer FAQ Trading Board Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
High Garrett, Sisted, Braintree, Essex, CM77 8BX
CM77 8BX
Last updated: 01 Aug 2025 19:08 UTC
2 Components Solar Photovoltaic NEXTPOWER HIGH GARRETT LIMITED
Total Capacity: 0.69 MW
Components: 2
Technologies:
Solar Photovoltaic
Unique CMUs: 1

Secondary Trading Contacts

Contact Information

Component Descriptions

CMU component is a 8.444 MWp solar PV site and shares its 10.900 MW export and import MPAN connection with a second PV asset, which has a capacity of 4.997 MWp. This smaller PV site is non-CMU as it it ineligible since it claims the RO subsidy. As the connection is oversized compared to the CMU, the limiting factor to the CMU capacity is the MWp of the generating assets which share the connection. For the applicant CMU, there is 5.903 MW available. This is the difference between the available connection capacity and the MWp capacity of the RO generating asset.

Used by 1 CMU

CMU Identifiers

1 CMU at this location (showing first 1):

NESF04

Components at this Location

Click on yellow auction year badges to see individual component pages

CMU component is a 8.444 MWp solar PV site and shares its 10.900 MW export and import MPAN connection with a second PV asset, which has a capacity of 4.997 MWp. This smaller PV site is non-CMU as it it ineligible since it claims the RO subsidy. As the connection is oversized compared to the CMU, the limiting factor to the CMU capacity is the MWp of the generating assets which share the connection. For the applicant CMU, there is 5.903 MW available. This is the difference between the available connection capacity and the MWp capacity of the RO generating asset.
CMU: NESF04
Solar Photovoltaic NEXTPOWER HIGH GARRETT LIMITED Parent: NextEnergySolar Holdings III Ltd
Capacity Information:
De-Rated Capacity (Registry) 0.366
Connection/DSR Capacity 5.853
Anticipated Capacity 0.366