Victory Road, Derby, Derbyshire, DE24 9HX
DE24 9HX
Last updated: 24 Jul 2025 07:46 UTC
8 Components Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines WHITETOWER ENERGY LIMITED
Total Capacity: 153.14 MW
Components: 8
Technologies:
Open Cycle Gas Turbine (OCGT), OCGT and Reciprocating Engines
Unique CMUs: 7

Secondary Trading Contacts

Contact Information

Component Descriptions

Existing OCGT.

Used by 6 CMUs

The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output

Used by 1 CMU

CMU Identifiers

7 CMUs at this location (showing first 5):

DERB24 DERB25 DERB26 DERB27 DERB28 + 2 more

Components at this Location

Click on yellow auction year badges to see individual component pages

Existing OCGT.
CMU: DERB24
Open Cycle Gas Turbine (OCGT) WHITETOWER ENERGY LIMITED Parent: Whitetower Holdings UK Limited
Capacity Information:
De-Rated Capacity (Registry) 51.059
Connection/DSR Capacity 53.622
Anticipated Capacity 51.059
CMU: DERB25
Open Cycle Gas Turbine (OCGT) WHITETOWER ENERGY LIMITED Parent: Whitetower Holdings UK Limited
Capacity Information:
De-Rated Capacity (Registry) 51.318
Connection/DSR Capacity 53.753
Anticipated Capacity 51.318
CMU: DERB26
Open Cycle Gas Turbine (OCGT) WHITETOWER ENERGY LIMITED Parent: Whitetower Holdings UK Limited
Capacity Information:
De-Rated Capacity (Registry) 51.577
Connection/DSR Capacity 54.189
Anticipated Capacity 51.577
CMU: DERB27
Open Cycle Gas Turbine (OCGT) WHITETOWER ENERGY LIMITED Parent: Whitetower Holdings UK Limited
Capacity Information:
De-Rated Capacity (Registry) 51.012
Connection/DSR Capacity 54.067
Anticipated Capacity 51.012
CMU: DERB28
Open Cycle Gas Turbine (OCGT) WHITETOWER ENERGY LIMITED Parent: Whitetower Holdings UK Limited
Capacity Information:
De-Rated Capacity (Registry) 50.547
Connection/DSR Capacity 54.067
The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output