Ray Wind Farm, Kirkwhelpington, Newcastle upon Tyne, Northumberland

33.26 MW (Est from CMU)
Total Capacity
11
Components
Active*
Status
Rejected
Prequalification
* Latest auction year on record
CMUs: URB-01 URB-03
Descriptions:
β€’ A new build 10MW battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works for concrete raft foundations and cable trenching; installation of three containerised battery units; six inverter banks; associated 33kV transformer; switchgear and HV station.
β€’ A new build 20 MW / 2 hour battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works for concrete raft foundations and cable trenching; installation of three containerised battery units; six inverter banks; associated 33kV transformer; switchgear and HV station.
Trading Contacts:
VATTENFALL WIND POWER LTD
'+4402074511150 [email protected]

CMU Registry Data

CMU URB-03
7.404 VATTENFALL WIND POWER …
2023-24
CMU URB-01
1.012 VATTENFALL WIND POWER …
2022-23 2021-2024