Home Technologies Companies Locations Map Explorer FAQ ChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Home Technologies Companies Locations Map Explorer FAQ ChatGPT Help
Capacity Market Search
Menu
Home
  • Technologies
  • Companies
  • Locations
  • Map Explorer
  • FAQ
  • ChatGPT

  • Help

  • Login
  • Register

  • Theme
  • Light
  • Dark
  • Auto
  • Understanding AuctionsSearch ResultsComponent GroupingSortingMap ViewContact Us

    Search Guide

    This registry provides comprehensive search capabilities across all Capacity Market components:

    • Company Search: Enter a company name (e.g., "Drax", "EDF") to see all their components
    • Location Search: Search by city, region, or postcode (e.g., "Manchester", "SW1")
    • CMU ID Search: Enter a specific CMU ID to find exact components
    • Technology Search: Enter technology types like "Hydro", "OCGT", or "Battery"

    The search is intelligent and will try to determine what you're looking for based on your query.

    You can combine search terms to narrow results, such as "London Battery" to find battery storage in London.

    Searches are not case-sensitive, and partial matches are supported (e.g., "Manch" will find "Manchester").

    Understanding Auctions

    The Capacity Market runs regular auctions where providers compete to secure agreements. There are two main types:

    • T-4 auctions: Held 4 years ahead of the delivery year
    • T-1 auctions: Held 1 year ahead to fine-tune capacity requirements

    Each auction results in agreements that specify how much capacity providers must deliver and the payment they'll receive.

    Auction years are displayed as badges (e.g., 2023-24) that you can click to view details for that specific auction year.

    The Capacity Market ensures the UK has sufficient electricity supply during periods of high demand or system stress.

    Providers receive payments for ensuring their capacity is available, creating a more stable and resilient electricity market.

    Search Results

    Search results are grouped by location and show important details about each component:

    • Active Components with auction years 2024-25 or later
    • In-Active Components with only auction years before 2024-25
    • Company Name Click to view all components for this company
    • Technology Click to search for this technology type
    • CMU: XXX Click to search for this CMU ID
    • Auction Year Click to view details for this specific auction

    Each result shows the component's capacity, location details, and participation in specific auction years.

    You can sort results by relevance, location, or date using the sort options.

    Pagination controls appear at the bottom when there are multiple pages of results.

    Component Grouping

    Components at the same location with the same description are grouped together to reduce duplication.

    Each group shows:

    • All CMU IDs for components at that location
    • All auction years, sorted with newest first
    • An Active/Inactive status based on auction years

    Grouping helps identify multi-year contracts and related components at the same site.

    The total capacity shown combines all components in the group.

    Components can be expanded to show individual details by clicking the expand icon.

    Sorting and Filtering

    You can sort search results by:

    • Relevance: Most relevant matches first
    • Location: Alphabetical order by location name
    • Date: By auction year (newest or oldest first)
    • Capacity: Highest or lowest capacity first

    Click the column headers to change sort order.

    You can filter results using the search refinements at the top of the results page:

    • Filter by technology type (e.g., only show batteries)
    • Filter by active status (show only active or inactive components)
    • Filter by auction year (show only components from specific auctions)

    Map Explorer & Map View

    We provide two map-based tools for exploring capacity market data:

    Map Explorer

    The Map Explorer is our advanced interactive mapping tool, specifically designed for comprehensive data exploration with:

    • Mobile-Optimized Interface: Responsive design that works perfectly on phones and tablets
    • Advanced Filtering: Filter by technology type, company, delivery year, and active status
    • Smart Sidebar: Desktop users get a dedicated filter panel, mobile users get collapsible filters
    • Full-Screen Map: Maximizes map space for detailed geographical analysis
    Search Map View

    The Search Map View combines search functionality with map visualization, offering:

    • Search-First Approach: Start with text searches, then visualize results on the map
    • Integrated Results: Search results and map display work together
    • Performance Optimized: Streamlined for fast search result mapping

    Both tools provide a visual representation of capacity distribution across the UK, but serve different exploration needs.

    Map Features:
    • Technology Colors: Different technology types are shown with distinct colors on the map for easy identification:
      GasDSRNuclearCHPSolarWind
      BatteryBiomassHydroInterconnectorCoalOther
    • Technology Legend: The map legend shows all available technologies with their corresponding colors and component counts
    • Search Results on Map: You can view any search results on the map by clicking "View on Map" from search results pages
    • Smart Clustering: Areas with multiple components are automatically grouped into clusters - click clusters to zoom in and see individual components
    • Interactive Markers: Click on individual markers to see detailed information about components at that location

    Use the map controls to zoom in on specific regions or areas of interest. The map automatically adjusts clustering based on your zoom level to provide the clearest view of capacity distribution.

    Contact Us

    We're here to help with any questions about the Capacity Market Registry.

    Email

    For general inquiries and support:

    For LLMs

    Complete programmatic access guide for LLMs:

    Search / All Locations / All Postcodes / PE12 / PE12 9TF

    Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF

    2257.82 MW (Est from CMU)
    Total Capacity
    PE12 9TF
    Postcode
    29
    Components
    Active*
    2028-29
    Prequalified
    Prequalification
    * Latest auction year on record
    Descriptions:
    • Existing CCGT to be refurbished
    • Existing CCGT
    • Sutton Bridge Project: The construction at the Sutton Bridge Power CMU (23SB01), an existing Combined Cycle Gas Turbine (CCGT) plant will include both installation of new generating equipment and the upgrade or refurbishment of the current equipment at the site. The construction will include the installation of new combustion turbines (CT), installation of new CT generators, installation of a new steam turbine (ST) and ST generator, refurbishment of the heat recovery steam generators (HRSGs), installation of a new distributed control system (DCS) and balance of plant refurbishments.
    Trading Contacts:
    SUTTON BRIDGE POWER GENERATION
    '+4401633530166 [email protected]
    SUTTON BRIDGE POWER GENERATION
    '+4401633530166
    Other Locations at This Postcode 1 location
    Land to the south of centenary way, Sutton Bridge, PE12 9TF
    Solar Photovoltaic HOLLYGREEN ENERGYFARM LIMITED2 components

    CMU Registry Data

    CMU 28SBRF
    SUTTON BRIDGE POWER …
    Prequalified
  • ✓ Prequalified
  • 2028-29
    Capacity Information
    Connection/DSR Capacity
    850
    Max Obligation Period
    15
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Refurbishing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    Sutton Bridge Holdings Limited
    Registered Holder
    SUTTON BRIDGE POWER GENERATION
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2028-28SBRF-001
    Agreement Term
    1
    _id
    15224
    CMU ID
    28SBRF
    Auction
    Capacity Auction
    Auction Name
    2028-29 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Sutton Bridge
    Is FCM required
    Yes
    Name of Applicant
    SUTTON BRIDGE POWER GENERATION
    Pre-Qualification Decision
    Prequalified
    Pre-Refurbishing CMU Status
    Opt-In
    Transmission / Distribution
    Transmission
    New Build Yet to Satisfy FCM
    Yes
    CMU confirmed entry into Auction
    Yes
    Pre-Refurbishment Bidding Status
    Pre-Refurbishing Only
    Secondary Trading Contact - Email
    Pre-Refurbishing De-Rated Capacity
    773.075
    Date of Issue of Capacity Agreement
    2025-04-04
    Post-Refurbishing De-Rated Capacity
    773.075
    Auction Acquired Capacity Obligation
    773.075
    Secondary Trading Contact - Telephone
    '+4401633530166
    Duration of Capacity Agreement Awarded
    1
    Date for Financial Commitment Milestone
    2026-07-21
    Delivery Years for which Agreement Valid
    2028/2029
    Latest Date SCM is expected to be achieved
    2028-09-30
    Subject to Substantial Completion Milestone
    Yes
    Subject to a Minimum Completion Requirement
    Yes
    Earliest Date SCM is expected to be achieved
    2027-08-31
    Anticipated Pre-Refurbishing De-Rated Capacity
    773.075
    Anticipated Post-Refurbishing De-Rated Capacity
    773.075
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2028-29T-42028-29 (T-4) Four Year Ahead Capacity Auction(9 components)
    176.00 MW Prequalified
    Component ID: 11966
    View Details: Component Page Location Page
    Capacity: 176.00 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TF 480 199
    • Location and Post Code: Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF
    • Primary Fuel of Component: Gas
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Existing CCGT to be refurbished
    CMU 27SBRF
    SUTTON BRIDGE POWER …
    Prequalified
  • ✓ Prequalified
  • 2027-28
    Capacity Information
    Connection/DSR Capacity
    850
    Max Obligation Period
    15
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Refurbishing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Name of Applicant
    Company Name
    N/A
    Parent Company
    Sutton Bridge Holdings Limited
    Registered Holder
    SUTTON BRIDGE POWER GENERATION
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2027-27SBRF-001
    Agreement Term
    1
    _id
    14354
    CMU ID
    27SBRF
    Auction
    Capacity Auction
    Auction Name
    2027-28 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Sutton Bridge
    Is FCM required
    Yes
    Name of Applicant
    SUTTON BRIDGE POWER GENERATION
    Pre-Qualification Decision
    Prequalified
    Pre-Refurbishing CMU Status
    Opt-In
    Transmission / Distribution
    Transmission
    New Build Yet to Satisfy FCM
    Yes
    CMU confirmed entry into Auction
    Yes
    Pre-Refurbishment Bidding Status
    Pre-Refurbishing Only
    Secondary Trading Contact - Email
    Pre-Refurbishing De-Rated Capacity
    778.515
    Date of Issue of Capacity Agreement
    2024-04-08
    Post-Refurbishing De-Rated Capacity
    778.515
    Auction Acquired Capacity Obligation
    778.515
    Secondary Trading Contact - Telephone
    '+4401633530166
    Duration of Capacity Agreement Awarded
    1
    Date for Financial Commitment Milestone
    2025-07-11
    Delivery Years for which Agreement Valid
    2027/2028
    Latest Date SCM is expected to be achieved
    2027-09-30
    Subject to Substantial Completion Milestone
    Yes
    Subject to a Minimum Completion Requirement
    Yes
    Earliest Date SCM is expected to be achieved
    2026-08-31
    Anticipated Pre-Refurbishing De-Rated Capacity
    778.515
    Anticipated Post-Refurbishing De-Rated Capacity
    778.515
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2027-28T-42027-28 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID:Not available
    View Details: Location Page
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TF 480 199
    • Location and Post Code: Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF
    • Primary Fuel of Component: Gas
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Existing CCGT
    CMU 22SB01
    SUTTON BRIDGE POWER …
    Opt-Out
  • Unknown
  • Unknown
  • Unknown
  • Unknown
  • 2024-25 2022-2026
    Capacity Information
    Anticipated Capacity
    765
    Unit Information
    CMU Type
    CMRS
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Organization
    Name of Applicant
    SUTTON BRIDGE POWER GENERATION
    Company Name
    N/A
    Parent Company
    Sutton Bridge Holdings Limited
    Opt Out Status
    Opt-Out
    Agreement Details
    Agreement Awarded
    No
    _id
    10914
    CMU ID
    22SB01
    Auction
    Capacity Auction
    Auction Name
    2024-25 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Sutton Bridge
    Opt-Out Reason
    (ii) will be temporarily non-operational for all the Winter of the Delivery Year to which the Capacity Auction relates but will be operational thereafter
    Name of Applicant
    SUTTON BRIDGE POWER GENERATION
    Transmission / Distribution
    Transmission
    Secondary Trading Contact - Email
    [email protected]
    Secondary Trading Contact - Telephone
    '+4401633530166
    Auction Participation History
    2024-25T-42024-25 (T-4) Four Year Ahead Capacity Auction
    42.88 MWUnknown
    Component ID:Not available
    View Details: Location Page
    Capacity: 42.88 MW
    Status: Unknown
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TF 480 199
    • Location and Post Code: Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Existing CCGT
    2024-25T-42024-25 (T-4) Four Year Ahead Capacity Auction
    Unknown
    Component ID:Not available
    View Details: Location Page
    Status: Unknown
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TF 480 199
    • Location and Post Code: Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Existing CCGT
    2023-24T-42023-24 (T-4) Four Year Ahead Capacity Auction
    Unknown
    Component ID:Not available
    View Details: Location Page
    Status: Unknown
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TF 480 199
    • Location and Post Code: Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Existing CCGT
    2022-23T-?2022-23 (T-3) Three Year Ahead Capacity Auction
    Unknown
    Component ID:Not available
    View Details: Location Page
    Status: Unknown
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TF 480 199
    • Location and Post Code: Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Existing CCGT
    CMU 23SB02
    SUTTON BRIDGE POWER …
    Opt-Out
  • Unknown
  • 2026-27
    Capacity Information
    Anticipated Capacity
    776.39
    Unit Information
    CMU Type
    CMRS
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Organization
    Name of Applicant
    SUTTON BRIDGE POWER GENERATION
    Company Name
    N/A
    Parent Company
    Sutton Bridge Holdings Limited
    Opt Out Status
    Opt-Out
    Agreement Details
    Agreement Awarded
    No
    _id
    13486
    CMU ID
    23SB02
    Auction
    Capacity Auction
    Auction Name
    2026-27 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Sutton Bridge
    Opt-Out Reason
    (iii) will remain operational during the Delivery Year to which the Capacity Auction relates
    Name of Applicant
    SUTTON BRIDGE POWER GENERATION
    Transmission / Distribution
    Transmission
    Secondary Trading Contact - Email
    [email protected]
    Secondary Trading Contact - Telephone
    '+4401633530166
    Auction Participation History
    2026-27T-42026-27 (T-4) Four Year Ahead Capacity Auction(2 components)
    42.88 MWUnknown
    Component ID: 21758
    View Details: Component Page Location Page
    Capacity: 42.88 MW
    Status: Unknown
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TF 480 199
    • Location and Post Code: Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Existing CCGT
    CMU 25SB01
    773.075 SUTTON BRIDGE POWER …
    Prequalified
  • ✓ Prequalified
  • 2025-26
    Capacity Information
    De-Rated Capacity
    773.075
    Connection/DSR Capacity
    850
    Anticipated Capacity
    773.075
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Name of Applicant
    SUTTON BRIDGE POWER GENERATION
    Company Name
    N/A
    Parent Company
    Sutton Bridge Holdings Limited
    Registered Holder
    SUTTON BRIDGE POWER GENERATION
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2025-25SB01-001
    Agreement Term
    1
    _id
    11902
    CMU ID
    25SB01
    Auction
    Capacity Auction
    Auction Name
    2025-26 (T-1) One Year Ahead Capacity Auction
    CM Unit Name
    Sutton Bridge
    Name of Applicant
    SUTTON BRIDGE POWER GENERATION
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2025-03-31
    Auction Acquired Capacity Obligation
    773.075
    Secondary Trading Contact - Telephone
    '+4401633530166
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2025/2026
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2025-26T-12025-26 (T-1) One Year Ahead Capacity Auction(3 components)
    815.95 MW Prequalified
    Component ID: 135181
    View Details: Component Page Location Page
    Capacity: 815.95 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TF 480 199
    • Location and Post Code: Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF
    • Primary Fuel of Component: Gas
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Existing CCGT
    CMU 23SB01
    SUTTON BRIDGE POWER …
    Rejected
  • ✗ Rejected
  • 2025-26
    Capacity Information
    Connection/DSR Capacity
    850
    Max Obligation Period
    15
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Refurbishing Generating CMU
    Storage Facility
    No
    Commercial Information
    Organization
    Name of Applicant
    SUTTON BRIDGE POWER GENERATION
    Company Name
    N/A
    Parent Company
    Sutton Bridge Holdings Limited
    Opt Out Status
    Opt-In
    Agreement Details
    _id
    12410
    CMU ID
    23SB01
    Auction
    Capacity Auction
    Auction Name
    2025-26 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Sutton Bridge
    Name of Applicant
    SUTTON BRIDGE POWER GENERATION
    Pre-Qualification Decision
    Rejected
    Pre-Refurbishing CMU Status
    Opt-Out
    Transmission / Distribution
    Transmission
    Secondary Trading Contact - Email
    [email protected]
    Pre-Refurbishing De-Rated Capacity
    772.82
    Post-Refurbishing De-Rated Capacity
    772.82
    Secondary Trading Contact - Telephone
    '+4401633530166
    Anticipated Pre-Refurbishing De-Rated Capacity
    772.82
    Anticipated Post-Refurbishing De-Rated Capacity
    772.82
    Auction Participation History
    2025-26T-42025-26 (T-4) Four Year Ahead Capacity Auction(3 components)
    42.88 MW Rejected
    Component ID: 11969
    View Details: Component Page Location Page
    Capacity: 42.88 MW
    Status: Rejected
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TF 480 199
    • Location and Post Code: Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Sutton Bridge Project: The construction at the Sutton Bridge Power CMU (23SB01), an existing Combined Cycle Gas Turbine (CCGT) plant will include both installation of new generating equipment and the upgrade or refurbishment of the current equipment at the site. The construction will include the installation of new combustion turbines (CT), installation of new CT generators, installation of a new steam turbine (ST) and ST generator, refurbishment of the heat recovery steam generators (HRSGs), installation of a new distributed control system (DCS) and balance of plant refurbishments.
    CMU 24SB01
    778.515 SUTTON BRIDGE POWER …
    Prequalified
  • ✓ Prequalified
  • 2024-25
    Capacity Information
    De-Rated Capacity
    778.515
    Connection/DSR Capacity
    850
    Anticipated Capacity
    778.515
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Organization
    Name of Applicant
    SUTTON BRIDGE POWER GENERATION
    Company Name
    N/A
    Parent Company
    Sutton Bridge Holdings Limited
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    No
    _id
    10442
    CMU ID
    24SB01
    Auction
    Capacity Auction
    Auction Name
    2024-25 (T-1) One Year Ahead Capacity Auction
    CM Unit Name
    Sutton Bridge
    Name of Applicant
    SUTTON BRIDGE POWER GENERATION
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Secondary Trading Contact - Telephone
    '+4401633530166
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2024-25T-12024-25 (T-1) One Year Ahead Capacity Auction
    778.52 MW Prequalified
    Component ID:Not available
    View Details: Location Page
    Capacity: 778.52 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TF 480 199
    • Location and Post Code: Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF
    • Primary Fuel of Component: Gas
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Existing CCGT
    CMU SUTBR1
    765 Calon Energy Limited
    Prequalified
  • ✓ Prequalified
  • 2022-23
    Capacity Information
    De-Rated Capacity
    765
    Connection/DSR Capacity
    850
    Anticipated Capacity
    765
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Organization
    Name of Applicant
    Calon Energy Limited
    Company Name
    N/A
    Parent Company
    Calon Energy Investments Limited
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    No
    _id
    8788
    CMU ID
    SUTBR1
    Auction
    Capacity Auction
    Auction Name
    2022-23 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Sutton Bridge
    Name of Applicant
    Calon Energy Limited
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Secondary Trading Contact - Telephone
    '+441633530165
    Auction Participation History
    2022-23T-42022-23 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID:Not available
    View Details: Location Page
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TF 480 199
    • Location and Post Code: Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Existing CCGT
    CMU SUTB_1
    737.1 SUTTON BRIDGE POWER …
    Prequalified
  • ✓ Prequalified
  • 2021-22
    Capacity Information
    De-Rated Capacity
    737.1
    Connection/DSR Capacity
    819
    Anticipated Capacity
    737.1
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Name of Applicant
    SUTTON BRIDGE POWER GENERATION
    Company Name
    N/A
    Parent Company
    Sutton Bridge Holdings Limited
    Registered Holder
    SUTTON BRIDGE POWER GENERATION
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2021-SUTB_1-001
    Agreement Term
    1
    _id
    6264
    CMU ID
    SUTB_1
    Auction
    Capacity Auction
    Auction Name
    2021-22 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Sutton Bridge
    Name of Applicant
    SUTTON BRIDGE POWER GENERATION
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2018-03-20
    Auction Acquired Capacity Obligation
    737.1
    Secondary Trading Contact - Telephone
    '+4401633530166
    Capacity Agreement has been Terminated
    Yes
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2021/2022
    Date of Termination of Capacity Agreement
    2020-11-18
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2021-22T-42021-22 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID:Not available
    View Details: Location Page
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TF 480 199
    • Location and Post Code: Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Existing CCGT
    CMU SUTB1Z
    737.1 SUTTON BRIDGE POWER …
    Prequalified (2)
  • ✓ Prequalified
  • ✓ Prequalified
  • 2020-21 2017-2020
    Capacity Information
    De-Rated Capacity
    737.1
    Connection/DSR Capacity
    819
    Anticipated Capacity
    737.1
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Name of Applicant
    SUTTON BRIDGE POWER GENERATION
    Company Name
    N/A
    Registered Holder
    SUTTON BRIDGE POWER GENERATION
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2020-SUTB1Z-001
    Agreement Term
    1
    _id
    4568
    CMU ID
    SUTB1Z
    Auction
    Capacity Auction
    Auction Name
    2020-21 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Sutton Bridge
    Name of Applicant
    SUTTON BRIDGE POWER GENERATION
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Date of Issue of Capacity Agreement
    2017-01-20
    Auction Acquired Capacity Obligation
    737.1
    Secondary Trading Contact - Telephone
    '+4401633530166
    Capacity Agreement has been Terminated
    Yes
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2020/2021
    Date of Termination of Capacity Agreement
    2020-11-18
    Auction Participation History
    2020-21T-42020-21 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID:Not available
    View Details: Location Page
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TF 480 199
    • Location and Post Code: Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF
    • Description of CMU Components: Existing CCGT
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction(3 components)
    358.72 MW Prequalified
    Component ID: 65305
    View Details: Component Page Location Page
    Capacity: 358.72 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: TF 480 199
    • Location and Post Code: Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF
    • Description of CMU Components: Existing CCGT
    Welcome to Capacity Market Search
    🗺️ 1 week free trial to explore all features!

    You can explore the basic features, but will need to register for continued access to premium features like the interactive map.

    Choose your contribution amount
    Unlimited access to all premium features

    Secure payment • No subscription • Lifetime access