Home Technologies Companies Locations Map Explorer FAQ ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Home Technologies Companies Locations Map Explorer FAQ ChatGPT Buy Me A Coffee Help
Capacity Market Search
Menu
Home
  • Technologies
  • Companies
  • Locations
  • Map Explorer
  • FAQ
  • ChatGPT

  • Buy Me A Coffee
  • Help

  • Login
  • Register

  • Theme
  • Light
  • Dark
  • Auto
  • Understanding AuctionsSearch ResultsComponent GroupingSortingMap ViewContact Us

    Search Guide

    This registry provides comprehensive search capabilities across all Capacity Market components:

    • Company Search: Enter a company name (e.g., "Drax", "EDF") to see all their components
    • Location Search: Search by city, region, or postcode (e.g., "Manchester", "SW1")
    • CMU ID Search: Enter a specific CMU ID to find exact components
    • Technology Search: Enter technology types like "Hydro", "OCGT", or "Battery"

    The search is intelligent and will try to determine what you're looking for based on your query.

    You can combine search terms to narrow results, such as "London Battery" to find battery storage in London.

    Searches are not case-sensitive, and partial matches are supported (e.g., "Manch" will find "Manchester").

    Understanding Auctions

    The Capacity Market runs regular auctions where providers compete to secure agreements. There are two main types:

    • T-4 auctions: Held 4 years ahead of the delivery year
    • T-1 auctions: Held 1 year ahead to fine-tune capacity requirements

    Each auction results in agreements that specify how much capacity providers must deliver and the payment they'll receive.

    Auction years are displayed as badges (e.g., 2023-24) that you can click to view details for that specific auction year.

    The Capacity Market ensures the UK has sufficient electricity supply during periods of high demand or system stress.

    Providers receive payments for ensuring their capacity is available, creating a more stable and resilient electricity market.

    Search Results

    Search results are grouped by location and show important details about each component:

    • Active Components with auction years 2024-25 or later
    • In-Active Components with only auction years before 2024-25
    • Company Name Click to view all components for this company
    • Technology Click to search for this technology type
    • CMU: XXX Click to search for this CMU ID
    • Auction Year Click to view details for this specific auction

    Each result shows the component's capacity, location details, and participation in specific auction years.

    You can sort results by relevance, location, or date using the sort options.

    Pagination controls appear at the bottom when there are multiple pages of results.

    Component Grouping

    Components at the same location with the same description are grouped together to reduce duplication.

    Each group shows:

    • All CMU IDs for components at that location
    • All auction years, sorted with newest first
    • An Active/Inactive status based on auction years

    Grouping helps identify multi-year contracts and related components at the same site.

    The total capacity shown combines all components in the group.

    Components can be expanded to show individual details by clicking the expand icon.

    Sorting and Filtering

    You can sort search results by:

    • Relevance: Most relevant matches first
    • Location: Alphabetical order by location name
    • Date: By auction year (newest or oldest first)
    • Capacity: Highest or lowest capacity first

    Click the column headers to change sort order.

    You can filter results using the search refinements at the top of the results page:

    • Filter by technology type (e.g., only show batteries)
    • Filter by active status (show only active or inactive components)
    • Filter by auction year (show only components from specific auctions)

    Map Explorer & Map View

    We provide two map-based tools for exploring capacity market data:

    Map Explorer

    The Map Explorer is our advanced interactive mapping tool, specifically designed for comprehensive data exploration with:

    • Mobile-Optimized Interface: Responsive design that works perfectly on phones and tablets
    • Advanced Filtering: Filter by technology type, company, delivery year, and active status
    • Smart Sidebar: Desktop users get a dedicated filter panel, mobile users get collapsible filters
    • Full-Screen Map: Maximizes map space for detailed geographical analysis
    Search Map View

    The Search Map View combines search functionality with map visualization, offering:

    • Search-First Approach: Start with text searches, then visualize results on the map
    • Integrated Results: Search results and map display work together
    • Performance Optimized: Streamlined for fast search result mapping

    Both tools provide a visual representation of capacity distribution across the UK, but serve different exploration needs.

    Map Features:
    • Technology Colors: Different technology types are shown with distinct colors on the map for easy identification:
      GasDSRNuclearCHPSolarWind
      BatteryBiomassHydroInterconnectorCoalOther
    • Technology Legend: The map legend shows all available technologies with their corresponding colors and component counts
    • Search Results on Map: You can view any search results on the map by clicking "View on Map" from search results pages
    • Smart Clustering: Areas with multiple components are automatically grouped into clusters - click clusters to zoom in and see individual components
    • Interactive Markers: Click on individual markers to see detailed information about components at that location

    Use the map controls to zoom in on specific regions or areas of interest. The map automatically adjusts clustering based on your zoom level to provide the clearest view of capacity distribution.

    Contact Us

    We're here to help with any questions about the Capacity Market Registry.

    Email

    For general inquiries and support:

    For LLMs

    Complete programmatic access guide for LLMs:

    Search / All Locations / All Postcodes / OX11 / OX11 7YU

    Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU

    4732.58 MW (Est from CMU)
    Total Capacity
    OX11 7YU
    Postcode
    39
    Components
    Active*
    2028-29
    Prequalified
    Prequalification
    * Latest auction year on record
    Descriptions:
    • Didcot B6 - CCGT MSID: 4055
    • Didcot B5 - CCGT MSID: 4055
    • Didcot B5 - CCGT
    Trading Contacts:

    CMU Registry Data

    CMU DIB524
    692.393 RWE Generation UK …
    Prequalified
  • ✓ Prequalified
  • 2028-29
    Capacity Information
    De-Rated Capacity
    692.393
    Connection/DSR Capacity
    761.29
    Anticipated Capacity
    692.393
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    RWE Generation UK Holdings Limited
    Registered Holder
    RWE GENERATION UK PLC
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2028-DIB524-001
    Agreement Term
    1
    _id
    15410
    CMU ID
    DIB524
    Auction
    Capacity Auction
    Auction Name
    2028-29 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    CMU_DIDCB5
    Name of Applicant
    RWE GENERATION UK PLC
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    Date of Issue of Capacity Agreement
    2025-04-04
    Auction Acquired Capacity Obligation
    692.393
    Secondary Trading Contact - Telephone
    '+4401793475215
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2028/2029
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2028-29T-42028-29 (T-4) Four Year Ahead Capacity Auction
    36.88 MW Prequalified
    Component ID: 410805
    Capacity: 36.88 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SU 507 921
    • Location and Post Code: Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU
    • Primary Fuel of Component: Gas
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Didcot B5 - CCGT MSID: 4055
    2028-29T-42028-29 (T-4) Four Year Ahead Capacity Auction
    692.39 MW Prequalified
    Component ID: 410989
    Capacity: 692.39 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SU 507 921
    • Location and Post Code: Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU
    • Primary Fuel of Component: Gas
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Didcot B5 - CCGT MSID: 4055
    CMU DIB624
    649.119 RWE Generation UK …
    Prequalified
  • ✓ Prequalified
  • 2028-29
    Capacity Information
    De-Rated Capacity
    649.119
    Connection/DSR Capacity
    713.71
    Anticipated Capacity
    649.119
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    RWE Generation UK Holdings Limited
    Registered Holder
    RWE GENERATION UK PLC
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2028-DIB624-001
    Agreement Term
    1
    _id
    15411
    CMU ID
    DIB624
    Auction
    Capacity Auction
    Auction Name
    2028-29 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    CMU_DIDCB6
    Name of Applicant
    RWE GENERATION UK PLC
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    Date of Issue of Capacity Agreement
    2025-04-04
    Auction Acquired Capacity Obligation
    649.119
    Secondary Trading Contact - Telephone
    '+4401793475215
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2028/2029
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2028-29T-42028-29 (T-4) Four Year Ahead Capacity Auction
    36.50 MW Prequalified
    Component ID: 411500
    Capacity: 36.50 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SU 507 921
    • Location and Post Code: Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU
    • Primary Fuel of Component: Gas
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Didcot B6 - CCGT MSID: 4055
    2028-29T-42028-29 (T-4) Four Year Ahead Capacity Auction
    649.12 MW Prequalified
    Component ID: 411684
    Capacity: 649.12 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SU 507 921
    • Location and Post Code: Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU
    • Primary Fuel of Component: Gas
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Didcot B6 - CCGT MSID: 4055
    CMU DIB517
    720 RWE Generation UK …
    Prequalified (2)
  • ✓ Prequalified
  • ✓ Prequalified
  • 2021-22 2021-2027
    Capacity Information
    De-Rated Capacity
    720
    Connection/DSR Capacity
    800
    Anticipated Capacity
    720
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    RWE Generation UK Holdings Limited
    Registered Holder
    RWE GENERATION UK PLC
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2021-DIB517-001
    Agreement Term
    1
    _id
    5340
    CMU ID
    DIB517
    Auction
    Capacity Auction
    Auction Name
    2021-22 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    CMU_DIDCB5
    Name of Applicant
    RWE GENERATION UK PLC
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2018-03-20
    Auction Acquired Capacity Obligation
    720
    Secondary Trading Contact - Telephone
    '+4401793475215
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2021/2022
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2021-22T-42021-22 (T-4) Four Year Ahead Capacity Auction
    36.88 MW Prequalified
    Component ID: 1406
    Capacity: 36.88 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SU 507 921
    • Location and Post Code: Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Didcot B5 - CCGT
    2021-22T-42021-22 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 1405
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SU 507 921
    • Location and Post Code: Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Didcot B5 - CCGT
    CMU DIB521
    727.36 RWE Generation UK …
    Prequalified (2)
  • ✓ Prequalified
  • ✓ Prequalified
  • 2025-26 2025-2027
    Capacity Information
    De-Rated Capacity
    727.36
    Connection/DSR Capacity
    800
    Anticipated Capacity
    727.36
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    RWE Generation UK Holdings Limited
    Registered Holder
    RWE GENERATION UK PLC
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2025-DIB521-001
    Agreement Term
    1
    _id
    12665
    CMU ID
    DIB521
    Auction
    Capacity Auction
    Auction Name
    2025-26 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    CMU_DIDCB5
    Name of Applicant
    RWE GENERATION UK PLC
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2022-04-01
    Auction Acquired Capacity Obligation
    727.36
    Secondary Trading Contact - Telephone
    '+4401793475215
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2025/2026
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2025-26T-42025-26 (T-4) Four Year Ahead Capacity Auction
    36.88 MW Prequalified
    Component ID: 278136
    Capacity: 36.88 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SU 507 921
    • Location and Post Code: Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Didcot B5 - CCGT MSID: 4055
    2025-26T-42025-26 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 278127
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SU 507 921
    • Location and Post Code: Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Didcot B5 - CCGT MSID: 4055
    CMU DIB623
    653.687 RWE Generation UK …
    Prequalified
  • ✓ Prequalified
  • 2027-28
    Capacity Information
    De-Rated Capacity
    653.687
    Connection/DSR Capacity
    713.71
    Anticipated Capacity
    653.687
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    RWE Generation UK Holdings Limited
    Registered Holder
    RWE GENERATION UK PLC
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2027-DIB623-001
    Agreement Term
    1
    _id
    14559
    CMU ID
    DIB623
    Auction
    Capacity Auction
    Auction Name
    2027-28 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    CMU_DIDCB6
    Name of Applicant
    RWE GENERATION UK PLC
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2024-04-08
    Auction Acquired Capacity Obligation
    653.687
    Secondary Trading Contact - Telephone
    '+4401793475215
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2027/2028
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2027-28T-42027-28 (T-4) Four Year Ahead Capacity Auction
    36.50 MW Prequalified
    Component ID: 366704
    Capacity: 36.50 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SU 507 921
    • Location and Post Code: Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU
    • Primary Fuel of Component: Gas
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Didcot B6 - CCGT MSID: 4055
    2027-28T-42027-28 (T-4) Four Year Ahead Capacity Auction
    653.69 MW Prequalified
    Component ID: 366687
    Capacity: 653.69 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SU 507 921
    • Location and Post Code: Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU
    • Primary Fuel of Component: Gas
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Didcot B6 - CCGT MSID: 4055
    CMU DIB523
    697.266 RWE Generation UK …
    Prequalified
  • ✓ Prequalified
  • 2027-28
    Capacity Information
    De-Rated Capacity
    697.266
    Connection/DSR Capacity
    761.29
    Anticipated Capacity
    697.266
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    RWE Generation UK Holdings Limited
    Registered Holder
    RWE GENERATION UK PLC
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2027-DIB523-001
    Agreement Term
    1
    _id
    14558
    CMU ID
    DIB523
    Auction
    Capacity Auction
    Auction Name
    2027-28 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    CMU_DIDCB5
    Name of Applicant
    RWE GENERATION UK PLC
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2024-04-08
    Auction Acquired Capacity Obligation
    697.266
    Secondary Trading Contact - Telephone
    '+4401793475215
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2027/2028
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2027-28T-42027-28 (T-4) Four Year Ahead Capacity Auction
    697.27 MW Prequalified
    Component ID: 140268
    Capacity: 697.27 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SU 507 921
    • Location and Post Code: Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU
    • Primary Fuel of Component: Gas
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Didcot B5 - CCGT MSID: 4055
    2027-28T-42027-28 (T-4) Four Year Ahead Capacity Auction
    36.88 MW Prequalified
    Component ID: 140278
    Capacity: 36.88 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SU 507 921
    • Location and Post Code: Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU
    • Primary Fuel of Component: Gas
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Didcot B5 - CCGT MSID: 4055
    CMU DIDCB6
    675 RWE GENERATION UK …
    Prequalified (3)
  • ✓ Prequalified
  • ✓ Prequalified
  • ✓ Prequalified
  • 2020-21 2017-2026
    Capacity Information
    De-Rated Capacity
    675
    Connection/DSR Capacity
    750
    Anticipated Capacity
    675
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Registered Holder
    RWE GENERATION UK PLC
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2020-DIDCB6-001
    Agreement Term
    1
    _id
    3895
    CMU ID
    DIDCB6
    Auction
    Capacity Auction
    Auction Name
    2020-21 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    CMU_DIDCB6
    Name of Applicant
    RWE GENERATION UK PLC
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Date of Issue of Capacity Agreement
    2017-01-20
    Auction Acquired Capacity Obligation
    675
    Secondary Trading Contact - Telephone
    '+4401793475215
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2020/2021
    Auction Participation History
    2020-21T-42020-21 (T-4) Four Year Ahead Capacity Auction
    36.50 MW Prequalified
    Component ID: 158724
    Capacity: 36.50 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SU 507 921
    • Location and Post Code: Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU
    • Description of CMU Components: Didcot B6 - CCGT
    2020-21T-42020-21 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 158714
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SU 507 921
    • Location and Post Code: Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU
    • Description of CMU Components: Didcot B6 - CCGT
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction
    36.50 MW Prequalified
    Component ID: 611589
    Capacity: 36.50 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SU 507 921
    • Location and Post Code: Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU
    • Description of CMU Components: Didcot B6 - CCGT
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction
    36.50 MW Prequalified
    Component ID: 562849
    Capacity: 36.50 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SU 507 921
    • Location and Post Code: Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU
    • Description of CMU Components: Didcot B6 - CCGT
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction
    36.50 MW Prequalified
    Component ID: 611607
    Capacity: 36.50 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SU 507 921
    • Location and Post Code: Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU
    • Description of CMU Components: Didcot B6 - CCGT
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 710383
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SU 507 921
    • Location and Post Code: Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU
    • Description of CMU Components: Didcot B6 - CCGT
    CMU DIDCB5
    720 RWE GENERATION UK …
    Prequalified (3)
  • ✓ Prequalified
  • ✓ Prequalified
  • ✓ Prequalified
  • 2020-21 2017-2026
    Capacity Information
    De-Rated Capacity
    720
    Connection/DSR Capacity
    800
    Anticipated Capacity
    720
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Registered Holder
    RWE GENERATION UK PLC
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2020-DIDCB5-001
    Agreement Term
    1
    _id
    3894
    CMU ID
    DIDCB5
    Auction
    Capacity Auction
    Auction Name
    2020-21 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    CMU_DIDCB5
    Name of Applicant
    RWE GENERATION UK PLC
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Date of Issue of Capacity Agreement
    2017-01-20
    Auction Acquired Capacity Obligation
    720
    Secondary Trading Contact - Telephone
    '+4401793475215
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2020/2021
    Auction Participation History
    2020-21T-42020-21 (T-4) Four Year Ahead Capacity Auction
    36.88 MW Prequalified
    Component ID: 194316
    Capacity: 36.88 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SU 507 921
    • Location and Post Code: Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU
    • Description of CMU Components: Didcot B5 - CCGT
    2020-21T-42020-21 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 194308
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SU 507 921
    • Location and Post Code: Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU
    • Description of CMU Components: Didcot B5 - CCGT
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction
    Prequalified
    Component ID: 684447
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SU 507 921
    • Location and Post Code: Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU
    • Description of CMU Components: Didcot B5 - CCGT
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction
    36.88 MW Prequalified
    Component ID: 536913
    Capacity: 36.88 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SU 507 921
    • Location and Post Code: Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU
    • Description of CMU Components: Didcot B5 - CCGT
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction
    36.88 MW Prequalified
    Component ID: 585653
    Capacity: 36.88 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SU 507 921
    • Location and Post Code: Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU
    • Description of CMU Components: Didcot B5 - CCGT
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction
    36.88 MW Prequalified
    Component ID: 662041
    Capacity: 36.88 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SU 507 921
    • Location and Post Code: Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU
    • Description of CMU Components: Didcot B5 - CCGT
    2017-18T-12017-18 (T-1) One Year Ahead Capacity Auction
    36.88 MW Prequalified
    Component ID: 585671
    Capacity: 36.88 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SU 507 921
    • Location and Post Code: Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU
    • Description of CMU Components: Didcot B5 - CCGT
    CMU DIB522
    730.72 RWE Generation UK …
    Prequalified
  • ✓ Prequalified
  • 2026-27
    Capacity Information
    De-Rated Capacity
    730.72
    Connection/DSR Capacity
    800
    Anticipated Capacity
    730.72
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    RWE Generation UK Holdings Limited
    Registered Holder
    RWE GENERATION UK PLC
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2026-DIB522-001
    Agreement Term
    1
    _id
    13671
    CMU ID
    DIB522
    Auction
    Capacity Auction
    Auction Name
    2026-27 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    CMU_DIDCB5
    Name of Applicant
    RWE GENERATION UK PLC
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2023-03-31
    Auction Acquired Capacity Obligation
    730.72
    Secondary Trading Contact - Telephone
    '+4401793475215
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2026/2027
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2026-27T-42026-27 (T-4) Four Year Ahead Capacity Auction
    730.72 MW Prequalified
    Component ID: 150213
    Capacity: 730.72 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SU 507 921
    • Location and Post Code: Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Didcot B5 - CCGT MSID: 4055
    CMU DIB622
    685.05 RWE Generation UK …
    Prequalified
  • ✓ Prequalified
  • 2026-27
    Capacity Information
    De-Rated Capacity
    685.05
    Connection/DSR Capacity
    750
    Anticipated Capacity
    685.05
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    RWE Generation UK Holdings Limited
    Registered Holder
    RWE GENERATION UK PLC
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2026-DIB622-001
    Agreement Term
    1
    _id
    13672
    CMU ID
    DIB622
    Auction
    Capacity Auction
    Auction Name
    2026-27 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    CMU_DIDCB6
    Name of Applicant
    RWE GENERATION UK PLC
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2023-03-31
    Auction Acquired Capacity Obligation
    685.05
    Secondary Trading Contact - Telephone
    '+4401793475215
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2026/2027
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2026-27T-42026-27 (T-4) Four Year Ahead Capacity Auction
    36.50 MW Prequalified
    Component ID: 281838
    Capacity: 36.50 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SU 507 921
    • Location and Post Code: Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Didcot B6 - CCGT MSID: 4055
    2026-27T-42026-27 (T-4) Four Year Ahead Capacity Auction
    685.05 MW Prequalified
    Component ID: 281829
    Capacity: 685.05 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SU 507 921
    • Location and Post Code: Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Didcot B6 - CCGT MSID: 4055
    CMU DIB621
    681.9 RWE Generation UK …
    Prequalified
  • ✓ Prequalified
  • 2025-26
    Capacity Information
    De-Rated Capacity
    681.9
    Connection/DSR Capacity
    750
    Anticipated Capacity
    681.9
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    RWE Generation UK Holdings Limited
    Registered Holder
    RWE GENERATION UK PLC
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2025-DIB621-001
    Agreement Term
    1
    _id
    12666
    CMU ID
    DIB621
    Auction
    Capacity Auction
    Auction Name
    2025-26 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    CMU_DIDCB6
    Name of Applicant
    RWE GENERATION UK PLC
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2022-04-01
    Auction Acquired Capacity Obligation
    681.9
    Secondary Trading Contact - Telephone
    '+4401793475215
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2025/2026
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2025-26T-42025-26 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 54501
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SU 507 921
    • Location and Post Code: Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Didcot B6 - CCGT MSID: 4055
    CMU DIB620
    675 RWE Generation UK …
    Prequalified
  • ✓ Prequalified
  • 2024-25
    Capacity Information
    De-Rated Capacity
    675
    Connection/DSR Capacity
    750
    Anticipated Capacity
    675
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    RWE Generation UK Holdings Limited
    Registered Holder
    RWE GENERATION UK PLC
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2024-DIB620-001
    Agreement Term
    1
    _id
    11130
    CMU ID
    DIB620
    Auction
    Capacity Auction
    Auction Name
    2024-25 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    CMU_DIDCB6
    Name of Applicant
    RWE GENERATION UK PLC
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2021-04-19
    Auction Acquired Capacity Obligation
    675
    Secondary Trading Contact - Telephone
    '+4401793475215
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2024/2025
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2024-25T-42024-25 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 114741
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SU 507 921
    • Location and Post Code: Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Didcot B6 - CCGT MSID: 4055
    CMU DIB520
    720 RWE Generation UK …
    Prequalified
  • ✓ Prequalified
  • 2024-25
    Capacity Information
    De-Rated Capacity
    720
    Connection/DSR Capacity
    800
    Anticipated Capacity
    720
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    RWE Generation UK Holdings Limited
    Registered Holder
    RWE GENERATION UK PLC
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2024-DIB520-001
    Agreement Term
    1
    _id
    11129
    CMU ID
    DIB520
    Auction
    Capacity Auction
    Auction Name
    2024-25 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    CMU_DIDCB5
    Name of Applicant
    RWE GENERATION UK PLC
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2021-04-19
    Auction Acquired Capacity Obligation
    720
    Secondary Trading Contact - Telephone
    '+4401793475215
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2024/2025
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2024-25T-42024-25 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 281995
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SU 507 921
    • Location and Post Code: Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Didcot B5 - CCGT MSID: 4055
    CMU DIB619
    675 RWE Generation UK …
    Prequalified
  • ✓ Prequalified
  • 2023-24
    Capacity Information
    De-Rated Capacity
    675
    Connection/DSR Capacity
    750
    Anticipated Capacity
    675
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    RWE Generation UK Holdings Limited
    Registered Holder
    RWE GENERATION UK PLC
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2023-DIB619-001
    Agreement Term
    1
    _id
    9618
    CMU ID
    DIB619
    Auction
    Capacity Auction
    Auction Name
    2023-24 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    CMU_DIDCB6
    Name of Applicant
    RWE GENERATION UK PLC
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2020-04-17
    Auction Acquired Capacity Obligation
    675
    Secondary Trading Contact - Telephone
    '+4401793475215
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2023/2024
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2023-24T-42023-24 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 281879
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SU 507 921
    • Location and Post Code: Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Didcot B6 - CCGT MSID: 4055
    CMU DB2185
    720 RWE Generation UK …
    Prequalified
  • ✓ Prequalified
  • 2022-23
    Capacity Information
    De-Rated Capacity
    720
    Connection/DSR Capacity
    800
    Anticipated Capacity
    720
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    RWE Generation UK Holdings Limited
    Registered Holder
    RWE GENERATION UK PLC
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2022-DB2185-001
    Agreement Term
    1
    _id
    7019
    CMU ID
    DB2185
    Auction
    Capacity Auction
    Auction Name
    2022-23 (T-3) Three Year Ahead Capacity Auction
    CM Unit Name
    CMU_DIDCB5
    Name of Applicant
    RWE GENERATION UK PLC
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2020-03-11
    Auction Acquired Capacity Obligation
    720
    Secondary Trading Contact - Telephone
    '+4401793475215
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2022/2023
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2022-23T-?2022-23 (T-3) Three Year Ahead Capacity Auction
    Prequalified
    Component ID: 114199
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SU 507 921
    • Location and Post Code: Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Didcot B5 - CCGT MSID: 4055
    CMU DB2186
    675 RWE Generation UK …
    Prequalified
  • ✓ Prequalified
  • 2022-23
    Capacity Information
    De-Rated Capacity
    675
    Connection/DSR Capacity
    750
    Anticipated Capacity
    675
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    RWE Generation UK Holdings Limited
    Registered Holder
    RWE GENERATION UK PLC
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2022-DB2186-001
    Agreement Term
    1
    _id
    7020
    CMU ID
    DB2186
    Auction
    Capacity Auction
    Auction Name
    2022-23 (T-3) Three Year Ahead Capacity Auction
    CM Unit Name
    CMU_DIDCB6
    Name of Applicant
    RWE GENERATION UK PLC
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2020-03-11
    Auction Acquired Capacity Obligation
    675
    Secondary Trading Contact - Telephone
    '+4401793475215
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2022/2023
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2022-23T-?2022-23 (T-3) Three Year Ahead Capacity Auction
    Prequalified
    Component ID: 220404
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SU 507 921
    • Location and Post Code: Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Didcot B6 - CCGT MSID: 4055
    CMU DIB618
    675 RWE Generation UK …
    Prequalified
  • ✓ Prequalified
  • 2022-23
    Capacity Information
    De-Rated Capacity
    675
    Connection/DSR Capacity
    750
    Anticipated Capacity
    675
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Organization
    Company Name
    N/A
    Parent Company
    RWE Generation UK Holdings Limited
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    No
    _id
    8079
    CMU ID
    DIB618
    Auction
    Capacity Auction
    Auction Name
    2022-23 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    CMU_DIDCB6
    Name of Applicant
    RWE GENERATION UK PLC
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Secondary Trading Contact - Telephone
    '+4401793475215
    Auction Participation History
    2022-23T-42022-23 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 281331
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SU 507 921
    • Location and Post Code: Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Didcot B6 - CCGT
    CMU DIB617
    675 RWE Generation UK …
    Prequalified
  • ✓ Prequalified
  • 2021-22
    Capacity Information
    De-Rated Capacity
    675
    Connection/DSR Capacity
    750
    Anticipated Capacity
    675
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    RWE Generation UK Holdings Limited
    Registered Holder
    RWE GENERATION UK PLC
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2021-DIB617-001
    Agreement Term
    1
    _id
    5341
    CMU ID
    DIB617
    Auction
    Capacity Auction
    Auction Name
    2021-22 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    CMU_DIDCB6
    Name of Applicant
    RWE GENERATION UK PLC
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2018-03-20
    Auction Acquired Capacity Obligation
    675
    Secondary Trading Contact - Telephone
    '+4401793475215
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2021/2022
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2021-22T-42021-22 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 184922
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SU 507 921
    • Location and Post Code: Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Didcot B6 - CCGT
    CMU DIB518
    720 RWE Generation UK …
    Prequalified
  • ✓ Prequalified
  • 2022-23
    Capacity Information
    De-Rated Capacity
    720
    Connection/DSR Capacity
    800
    Anticipated Capacity
    720
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Organization
    Company Name
    N/A
    Parent Company
    RWE Generation UK Holdings Limited
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    No
    _id
    8078
    CMU ID
    DIB518
    Auction
    Capacity Auction
    Auction Name
    2022-23 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    CMU_DIDCB5
    Name of Applicant
    RWE GENERATION UK PLC
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Secondary Trading Contact - Telephone
    '+4401793475215
    Auction Participation History
    2022-23T-42022-23 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 292025
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SU 507 921
    • Location and Post Code: Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Didcot B5 - CCGT
    2022-23T-42022-23 (T-4) Four Year Ahead Capacity Auction
    36.88 MW Prequalified
    Component ID: 292039
    Capacity: 36.88 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SU 507 921
    • Location and Post Code: Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Didcot B5 - CCGT
    CMU DIB519
    720 RWE Generation UK …
    Prequalified
  • ✓ Prequalified
  • 2023-24
    Capacity Information
    De-Rated Capacity
    720
    Connection/DSR Capacity
    800
    Anticipated Capacity
    720
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Gas
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Company Name
    N/A
    Parent Company
    RWE Generation UK Holdings Limited
    Registered Holder
    RWE GENERATION UK PLC
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2023-DIB519-001
    Agreement Term
    1
    _id
    9617
    CMU ID
    DIB519
    Auction
    Capacity Auction
    Auction Name
    2023-24 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    CMU_DIDCB5
    Name of Applicant
    RWE GENERATION UK PLC
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2020-04-17
    Auction Acquired Capacity Obligation
    720
    Secondary Trading Contact - Telephone
    '+4401793475215
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2023/2024
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2023-24T-42023-24 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID: 366345
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: SU 507 921
    • Location and Post Code: Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU
    • Generating Technology Class: Combined Cycle Gas Turbine (CCGT)
    • Description of CMU Components: Didcot B5 - CCGT MSID: 4055
    Welcome to Capacity Market Search
    🗺️ 1 week free trial to explore all features!

    You can explore the basic features, but will need to register for continued access to premium features like the interactive map.

    Choose your contribution amount
    Unlimited access to all premium features

    Secure payment • No subscription • Lifetime access