Home Technologies Companies Locations Map Explorer FAQ ChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Home Technologies Companies Locations Map Explorer FAQ ChatGPT Help
Capacity Market Search
Menu
Home
  • Technologies
  • Companies
  • Locations
  • Map Explorer
  • FAQ
  • ChatGPT

  • Help

  • Login
  • Register

  • Theme
  • Light
  • Dark
  • Auto
  • Understanding AuctionsSearch ResultsComponent GroupingSortingMap ViewContact Us

    Search Guide

    This registry provides comprehensive search capabilities across all Capacity Market components:

    • Company Search: Enter a company name (e.g., "Drax", "EDF") to see all their components
    • Location Search: Search by city, region, or postcode (e.g., "Manchester", "SW1")
    • CMU ID Search: Enter a specific CMU ID to find exact components
    • Technology Search: Enter technology types like "Hydro", "OCGT", or "Battery"

    The search is intelligent and will try to determine what you're looking for based on your query.

    You can combine search terms to narrow results, such as "London Battery" to find battery storage in London.

    Searches are not case-sensitive, and partial matches are supported (e.g., "Manch" will find "Manchester").

    Understanding Auctions

    The Capacity Market runs regular auctions where providers compete to secure agreements. There are two main types:

    • T-4 auctions: Held 4 years ahead of the delivery year
    • T-1 auctions: Held 1 year ahead to fine-tune capacity requirements

    Each auction results in agreements that specify how much capacity providers must deliver and the payment they'll receive.

    Auction years are displayed as badges (e.g., 2023-24) that you can click to view details for that specific auction year.

    The Capacity Market ensures the UK has sufficient electricity supply during periods of high demand or system stress.

    Providers receive payments for ensuring their capacity is available, creating a more stable and resilient electricity market.

    Search Results

    Search results are grouped by location and show important details about each component:

    • Active Components with auction years 2024-25 or later
    • In-Active Components with only auction years before 2024-25
    • Company Name Click to view all components for this company
    • Technology Click to search for this technology type
    • CMU: XXX Click to search for this CMU ID
    • Auction Year Click to view details for this specific auction

    Each result shows the component's capacity, location details, and participation in specific auction years.

    You can sort results by relevance, location, or date using the sort options.

    Pagination controls appear at the bottom when there are multiple pages of results.

    Component Grouping

    Components at the same location with the same description are grouped together to reduce duplication.

    Each group shows:

    • All CMU IDs for components at that location
    • All auction years, sorted with newest first
    • An Active/Inactive status based on auction years

    Grouping helps identify multi-year contracts and related components at the same site.

    The total capacity shown combines all components in the group.

    Components can be expanded to show individual details by clicking the expand icon.

    Sorting and Filtering

    You can sort search results by:

    • Relevance: Most relevant matches first
    • Location: Alphabetical order by location name
    • Date: By auction year (newest or oldest first)
    • Capacity: Highest or lowest capacity first

    Click the column headers to change sort order.

    You can filter results using the search refinements at the top of the results page:

    • Filter by technology type (e.g., only show batteries)
    • Filter by active status (show only active or inactive components)
    • Filter by auction year (show only components from specific auctions)

    Map Explorer & Map View

    We provide two map-based tools for exploring capacity market data:

    Map Explorer

    The Map Explorer is our advanced interactive mapping tool, specifically designed for comprehensive data exploration with:

    • Mobile-Optimized Interface: Responsive design that works perfectly on phones and tablets
    • Advanced Filtering: Filter by technology type, company, delivery year, and active status
    • Smart Sidebar: Desktop users get a dedicated filter panel, mobile users get collapsible filters
    • Full-Screen Map: Maximizes map space for detailed geographical analysis
    Search Map View

    The Search Map View combines search functionality with map visualization, offering:

    • Search-First Approach: Start with text searches, then visualize results on the map
    • Integrated Results: Search results and map display work together
    • Performance Optimized: Streamlined for fast search result mapping

    Both tools provide a visual representation of capacity distribution across the UK, but serve different exploration needs.

    Map Features:
    • Technology Colors: Different technology types are shown with distinct colors on the map for easy identification:
      GasDSRNuclearCHPSolarWind
      BatteryBiomassHydroInterconnectorCoalOther
    • Technology Legend: The map legend shows all available technologies with their corresponding colors and component counts
    • Search Results on Map: You can view any search results on the map by clicking "View on Map" from search results pages
    • Smart Clustering: Areas with multiple components are automatically grouped into clusters - click clusters to zoom in and see individual components
    • Interactive Markers: Click on individual markers to see detailed information about components at that location

    Use the map controls to zoom in on specific regions or areas of interest. The map automatically adjusts clustering based on your zoom level to provide the clearest view of capacity distribution.

    Contact Us

    We're here to help with any questions about the Capacity Market Registry.

    Email

    For general inquiries and support:

    For LLMs

    Complete programmatic access guide for LLMs:

    Search / All Locations / All Postcodes / EH42 / EH42 1QU

    EDF Energy, Torness power station, Torness, Dunbar, East Lothian, EH42 1QU

    2580.93 MW (Est from CMU) (part of 2580.93 MW aggregated CMU)
    Total Capacity
    EH42 1QU
    Postcode
    25
    Components
    Active*
    2028-29
    Prequalified
    Prequalification
    * Latest auction year on record
    Descriptions:
    • Torness Power Station CMU 1: [TN1-24] T_TORN-1 + (50% x T_TORN-D)
    • Torness Power Station CMU 2: [TN2-24] T_TORN-2 + (50% x T_TORN-D)
    • Torness Power Station CMU 1: [TN1-23] T_TORN-1 + (50% x T_TORN-D)
    Trading Contacts:
    EDF ENERGY NUCLEAR GENERATION LIMITED
    '+442081861004 edfenergycmsecondarytrading@e…

    CMU Registry Data

    CMU TN2-24
    474.981 EDF ENERGY NUCLEAR …
    Opt-Out
  • Unknown
  • Unknown
  • 2025-26 2024-2028
    Capacity Information
    De-Rated Capacity
    474.981
    Connection/DSR Capacity
    629.614
    Anticipated Capacity
    474.981
    Unit Information
    CMU Type
    CMRS
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Organization
    Company Name
    N/A
    Parent Company
    EDF Energy Holdings Limited
    Opt Out Status
    Opt-Out
    Agreement Details
    _id
    16057
    CMU ID
    TN2-24
    Auction
    Capacity Auction
    Auction Name
    2028-29 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Torness Power Station CMU 2
    Opt-Out Reason
    (iii) will remain operational during the Delivery Year to which the Capacity Auction relates
    Name of Applicant
    EDF ENERGY NUCLEAR GENERATION LIMITED
    Transmission / Distribution
    Transmission
    Secondary Trading Contact - Email
    Secondary Trading Contact - Telephone
    '+442081861004
    Auction Participation History
    2025-26T-12025-26 (T-1) One Year Ahead Capacity Auction
    474.98 MWUnknown
    Component ID:Not available
    View Details: Location Page
    Capacity: 474.98 MW
    Status: Unknown
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NT 745 752
    • Location and Post Code: EDF Energy, Torness power station, Torness, Dunbar, East Lothian, EH42 1QU
    • Primary Fuel of Component: Nuclear
    • Generating Technology Class: Nuclear
    • Description of CMU Components: Torness Power Station CMU 2: [TN2-24] T_TORN-2 + (50% x T_TORN-D)
    2028-29T-42028-29 (T-4) Four Year Ahead Capacity Auction
    474.98 MWUnknown
    Component ID:Not available
    View Details: Location Page
    Capacity: 474.98 MW
    Status: Unknown
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NT 745 752
    • Location and Post Code: EDF Energy, Torness power station, Torness, Dunbar, East Lothian, EH42 1QU
    • Primary Fuel of Component: Nuclear
    • Generating Technology Class: Nuclear
    • Description of CMU Components: Torness Power Station CMU 2: [TN2-24] T_TORN-2 + (50% x T_TORN-D)
    2028-29T-42028-29 (T-4) Four Year Ahead Capacity Auction
    42.46 MWUnknown
    Component ID:Not available
    View Details: Location Page
    Capacity: 42.46 MW
    Status: Unknown
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NT 745 752
    • Location and Post Code: EDF Energy, Torness power station, Torness, Dunbar, East Lothian, EH42 1QU
    • Primary Fuel of Component: Nuclear
    • Generating Technology Class: Nuclear
    • Description of CMU Components: Torness Power Station CMU 2: [TN2-24] T_TORN-2 + (50% x T_TORN-D)
    CMU TN1-24
    468.019 EDF ENERGY NUCLEAR …
    Opt-Out
  • Unknown
  • Unknown
  • 2028-29 2025-2028
    Capacity Information
    De-Rated Capacity
    468.019
    Connection/DSR Capacity
    620.386
    Anticipated Capacity
    468.019
    Unit Information
    CMU Type
    CMRS
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Organization
    Name of Applicant
    Company Name
    N/A
    Parent Company
    EDF Energy Holdings Limited
    Opt Out Status
    Opt-Out
    Agreement Details
    _id
    16056
    CMU ID
    TN1-24
    Auction
    Capacity Auction
    Auction Name
    2028-29 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Torness Power Station CMU 1
    Opt-Out Reason
    (iii) will remain operational during the Delivery Year to which the Capacity Auction relates
    Name of Applicant
    EDF ENERGY NUCLEAR GENERATION LIMITED
    Transmission / Distribution
    Transmission
    Secondary Trading Contact - Email
    Secondary Trading Contact - Telephone
    '+442081861004
    Auction Participation History
    2028-29T-42028-29 (T-4) Four Year Ahead Capacity Auction
    468.02 MWUnknown
    Component ID:Not available
    View Details: Location Page
    Capacity: 468.02 MW
    Status: Unknown
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NT 745 752
    • Location and Post Code: EDF Energy, Torness power station, Torness, Dunbar, East Lothian, EH42 1QU
    • Primary Fuel of Component: Nuclear
    • Generating Technology Class: Nuclear
    • Description of CMU Components: Torness Power Station CMU 1: [TN1-24] T_TORN-1 + (50% x T_TORN-D)
    2025-26T-12025-26 (T-1) One Year Ahead Capacity Auction
    468.02 MWUnknown
    Component ID:Not available
    View Details: Location Page
    Capacity: 468.02 MW
    Status: Unknown
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NT 745 752
    • Location and Post Code: EDF Energy, Torness power station, Torness, Dunbar, East Lothian, EH42 1QU
    • Primary Fuel of Component: Nuclear
    • Generating Technology Class: Nuclear
    • Description of CMU Components: Torness Power Station CMU 1: [TN1-24] T_TORN-1 + (50% x T_TORN-D)
    2028-29T-42028-29 (T-4) Four Year Ahead Capacity Auction
    29.55 MWUnknown
    Component ID:Not available
    View Details: Location Page
    Capacity: 29.55 MW
    Status: Unknown
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NT 745 752
    • Location and Post Code: EDF Energy, Torness power station, Torness, Dunbar, East Lothian, EH42 1QU
    • Primary Fuel of Component: Nuclear
    • Generating Technology Class: Nuclear
    • Description of CMU Components: Torness Power Station CMU 1: [TN1-24] T_TORN-1 + (50% x T_TORN-D)
    CMU TN1-18
    522.365 EDF ENERGY NUCLEAR …
    Prequalified (2)
  • ✓ Prequalified
  • ✓ Prequalified
  • 2022-23 2022-2027
    Capacity Information
    De-Rated Capacity
    522.365
    Connection/DSR Capacity
    620.386
    Anticipated Capacity
    522.365
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Nuclear
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Organization
    Name of Applicant
    EDF ENERGY NUCLEAR GENERATION LIMITED
    Company Name
    N/A
    Parent Company
    EDF Energy Holdings Limited
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    No
    _id
    8814
    CMU ID
    TN1-18
    Auction
    Capacity Auction
    Auction Name
    2022-23 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Torness Power Station CMU 1
    Name of Applicant
    EDF ENERGY NUCLEAR GENERATION LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Secondary Trading Contact - Telephone
    '+442081861004
    Auction Participation History
    2022-23T-42022-23 (T-4) Four Year Ahead Capacity Auction
    29.55 MW Prequalified
    Component ID:Not available
    View Details: Location Page
    Capacity: 29.55 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NT 745 752
    • Location and Post Code: EDF Energy, Torness power station, Torness, Dunbar, East Lothian, EH42 1QU
    • Generating Technology Class: Nuclear
    • Description of CMU Components: Torness Power Station CMU 1: [TN1-18] T_TORN-1 + (50% x T_TORN-D)
    2022-23T-42022-23 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID:Not available
    View Details: Location Page
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NT 745 752
    • Location and Post Code: EDF Energy, Torness power station, Torness, Dunbar, East Lothian, EH42 1QU
    • Generating Technology Class: Nuclear
    • Description of CMU Components: Torness Power Station CMU 1: [TN1-18] T_TORN-1 + (50% x T_TORN-D)
    CMU TN1-23
    EDF ENERGY NUCLEAR …
    Opt-Out
  • Unknown
  • Unknown
  • 2027-28 2024-2027
    Capacity Information
    Anticipated Capacity
    478.901
    Unit Information
    CMU Type
    CMRS
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Organization
    Name of Applicant
    EDF ENERGY NUCLEAR GENERATION LIMITED
    Company Name
    N/A
    Parent Company
    EDF Energy Holdings Limited
    Opt Out Status
    Opt-Out
    Agreement Details
    Agreement Awarded
    No
    _id
    15005
    CMU ID
    TN1-23
    Auction
    Capacity Auction
    Auction Name
    2027-28 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Torness Power Station CMU 1
    Opt-Out Reason
    (iii) will remain operational during the Delivery Year to which the Capacity Auction relates
    Name of Applicant
    EDF ENERGY NUCLEAR GENERATION LIMITED
    Transmission / Distribution
    Transmission
    Secondary Trading Contact - Email
    [email protected]
    Secondary Trading Contact - Telephone
    '+442081861004
    Auction Participation History
    2027-28T-42027-28 (T-4) Four Year Ahead Capacity Auction
    Unknown
    Component ID:Not available
    View Details: Location Page
    Status: Unknown
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NT 745 752
    • Location and Post Code: EDF Energy, Torness power station, Torness, Dunbar, East Lothian, EH42 1QU
    • Primary Fuel of Component: Nuclear
    • Generating Technology Class: Nuclear
    • Description of CMU Components: Torness Power Station CMU 1: [TN1-23] T_TORN-1 + (50% x T_TORN-D)
    2024-25T-12024-25 (T-1) One Year Ahead Capacity Auction
    478.90 MWUnknown
    Component ID:Not available
    View Details: Location Page
    Capacity: 478.90 MW
    Status: Unknown
    Auction-specific values (differ from CMU baseline):
    • De-Rated Capacity: 478.901
    • OS Grid Reference: NT 745 752
    • Location and Post Code: EDF Energy, Torness power station, Torness, Dunbar, East Lothian, EH42 1QU
    • Connection / DSR Capacity: 613.975
    • Primary Fuel of Component: Nuclear
    • Generating Technology Class: Nuclear
    • Description of CMU Components: Torness Power Station CMU 1: [TN1-23] T_TORN-1 + (50% x T_TORN-D)
    CMU TN2-23
    EDF ENERGY NUCLEAR …
    Opt-Out
  • Unknown
  • 2027-28
    Capacity Information
    Anticipated Capacity
    491.099
    Unit Information
    CMU Type
    CMRS
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Organization
    Name of Applicant
    EDF ENERGY NUCLEAR GENERATION LIMITED
    Company Name
    N/A
    Parent Company
    EDF Energy Holdings Limited
    Opt Out Status
    Opt-Out
    Agreement Details
    Agreement Awarded
    No
    _id
    15006
    CMU ID
    TN2-23
    Auction
    Capacity Auction
    Auction Name
    2027-28 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Torness Power Station CMU 2
    Opt-Out Reason
    (iii) will remain operational during the Delivery Year to which the Capacity Auction relates
    Name of Applicant
    EDF ENERGY NUCLEAR GENERATION LIMITED
    Transmission / Distribution
    Transmission
    Secondary Trading Contact - Email
    [email protected]
    Secondary Trading Contact - Telephone
    '+442081861004
    Auction Participation History
    2027-28T-42027-28 (T-4) Four Year Ahead Capacity Auction
    Unknown
    Component ID:Not available
    View Details: Location Page
    Status: Unknown
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NT 745 752
    • Location and Post Code: EDF Energy, Torness power station, Torness, Dunbar, East Lothian, EH42 1QU
    • Primary Fuel of Component: Nuclear
    • Generating Technology Class: Nuclear
    • Description of CMU Components: Torness Power Station CMU 2: [TN2-23] T_TORN-2 + (50% x T_TORN-D)
    CMU TN1-22
    EDF ENERGY NUCLEAR …
    Opt-Out
  • Unknown
  • 2026-27
    Capacity Information
    Anticipated Capacity
    514.885
    Unit Information
    CMU Type
    CMRS
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Organization
    Name of Applicant
    EDF ENERGY NUCLEAR GENERATION LIMITED
    Company Name
    N/A
    Parent Company
    EDF Energy Holdings Limited
    Opt Out Status
    Opt-Out
    Agreement Details
    Agreement Awarded
    No
    _id
    14155
    CMU ID
    TN1-22
    Auction
    Capacity Auction
    Auction Name
    2026-27 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Torness Power Station CMU 1
    Opt-Out Reason
    (iii) will remain operational during the Delivery Year to which the Capacity Auction relates
    Name of Applicant
    EDF ENERGY NUCLEAR GENERATION LIMITED
    Transmission / Distribution
    Transmission
    Secondary Trading Contact - Email
    [email protected]
    Secondary Trading Contact - Telephone
    '+442081861004
    Auction Participation History
    2026-27T-42026-27 (T-4) Four Year Ahead Capacity Auction
    Unknown
    Component ID:Not available
    View Details: Location Page
    Status: Unknown
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NT 745 752
    • Location and Post Code: EDF Energy, Torness power station, Torness, Dunbar, East Lothian, EH42 1QU
    • Generating Technology Class: Nuclear
    • Description of CMU Components: Torness Power Station CMU 1: [TN1-22] T_TORN-1 + (50% x T_TORN-D)
    CMU TN2-22
    EDF ENERGY NUCLEAR …
    Opt-Out
  • Unknown
  • 2026-27
    Capacity Information
    Anticipated Capacity
    521.145
    Unit Information
    CMU Type
    CMRS
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Organization
    Name of Applicant
    EDF ENERGY NUCLEAR GENERATION LIMITED
    Company Name
    N/A
    Parent Company
    EDF Energy Holdings Limited
    Opt Out Status
    Opt-Out
    Agreement Details
    Agreement Awarded
    No
    _id
    14156
    CMU ID
    TN2-22
    Auction
    Capacity Auction
    Auction Name
    2026-27 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Torness Power Station CMU 2
    Opt-Out Reason
    (iii) will remain operational during the Delivery Year to which the Capacity Auction relates
    Name of Applicant
    EDF ENERGY NUCLEAR GENERATION LIMITED
    Transmission / Distribution
    Transmission
    Secondary Trading Contact - Email
    [email protected]
    Secondary Trading Contact - Telephone
    '+442081861004
    Auction Participation History
    2026-27T-42026-27 (T-4) Four Year Ahead Capacity Auction
    Unknown
    Component ID:Not available
    View Details: Location Page
    Status: Unknown
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NT 745 752
    • Location and Post Code: EDF Energy, Torness power station, Torness, Dunbar, East Lothian, EH42 1QU
    • Generating Technology Class: Nuclear
    • Description of CMU Components: Torness Power Station CMU 2: [TN2-22] T_TORN-2 + (50% x T_TORN-D)
    CMU TN2-21
    EDF ENERGY NUCLEAR …
    Opt-Out
  • Unknown
  • 2025-26
    Capacity Information
    Anticipated Capacity
    535.73
    Unit Information
    CMU Type
    CMRS
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Organization
    Name of Applicant
    EDF ENERGY NUCLEAR GENERATION LIMITED
    Company Name
    N/A
    Parent Company
    EDF Energy Holdings Limited
    Opt Out Status
    Opt-Out
    Agreement Details
    Agreement Awarded
    No
    _id
    13296
    CMU ID
    TN2-21
    Auction
    Capacity Auction
    Auction Name
    2025-26 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Torness Power Station CMU 2
    Opt-Out Reason
    (iii) will remain operational during the Delivery Year to which the Capacity Auction relates
    Name of Applicant
    EDF ENERGY NUCLEAR GENERATION LIMITED
    Transmission / Distribution
    Transmission
    Secondary Trading Contact - Email
    [email protected]
    Secondary Trading Contact - Telephone
    '+442081861004
    Auction Participation History
    2025-26T-42025-26 (T-4) Four Year Ahead Capacity Auction
    Unknown
    Component ID:Not available
    View Details: Location Page
    Status: Unknown
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NT 745 752
    • Location and Post Code: EDF Energy, Torness power station, Torness, Dunbar, East Lothian, EH42 1QU
    • Generating Technology Class: Nuclear
    • Description of CMU Components: Torness Power Station CMU 2: [TN2-21] T_TORN-2 + (50% x T_TORN-D)
    CMU TN1-21
    EDF ENERGY NUCLEAR …
    Opt-Out
  • Unknown
  • 2025-26
    Capacity Information
    Anticipated Capacity
    529.295
    Unit Information
    CMU Type
    CMRS
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Organization
    Name of Applicant
    EDF ENERGY NUCLEAR GENERATION LIMITED
    Company Name
    N/A
    Parent Company
    EDF Energy Holdings Limited
    Opt Out Status
    Opt-Out
    Agreement Details
    Agreement Awarded
    No
    _id
    13295
    CMU ID
    TN1-21
    Auction
    Capacity Auction
    Auction Name
    2025-26 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Torness Power Station CMU 1
    Opt-Out Reason
    (iii) will remain operational during the Delivery Year to which the Capacity Auction relates
    Name of Applicant
    EDF ENERGY NUCLEAR GENERATION LIMITED
    Transmission / Distribution
    Transmission
    Secondary Trading Contact - Email
    [email protected]
    Secondary Trading Contact - Telephone
    '+442081861004
    Auction Participation History
    2025-26T-42025-26 (T-4) Four Year Ahead Capacity Auction
    Unknown
    Component ID:Not available
    View Details: Location Page
    Status: Unknown
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NT 745 752
    • Location and Post Code: EDF Energy, Torness power station, Torness, Dunbar, East Lothian, EH42 1QU
    • Generating Technology Class: Nuclear
    • Description of CMU Components: Torness Power Station CMU 1: [TN1-21] T_TORN-1 + (50% x T_TORN-D)
    CMU TN2-20
    517.915 EDF ENERGY NUCLEAR …
    Prequalified
  • ✓ Prequalified
  • 2024-25
    Capacity Information
    De-Rated Capacity
    517.915
    Connection/DSR Capacity
    636.025
    Anticipated Capacity
    517.915
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Nuclear
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Name of Applicant
    EDF ENERGY NUCLEAR GENERATION LIMITED
    Company Name
    N/A
    Parent Company
    EDF Energy Holdings Limited
    Registered Holder
    EDF ENERGY NUCLEAR GENERATION LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2024-TN2-20-001
    Agreement Term
    1
    _id
    11793
    CMU ID
    TN2-20
    Auction
    Capacity Auction
    Auction Name
    2024-25 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Torness Power Station CMU 2
    Name of Applicant
    EDF ENERGY NUCLEAR GENERATION LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2021-04-19
    Auction Acquired Capacity Obligation
    517.915
    Secondary Trading Contact - Telephone
    '+442081861004
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2024/2025
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2024-25T-42024-25 (T-4) Four Year Ahead Capacity Auction(2 components)
    42.46 MW Prequalified
    Component ID: 15452
    View Details: Component Page Location Page
    Capacity: 42.46 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NT 745 752
    • Location and Post Code: EDF Energy, Torness power station, Torness, Dunbar, East Lothian, EH42 1QU
    • Generating Technology Class: Nuclear
    • Description of CMU Components: Torness Power Station CMU 2: [TN2-20] T_TORN-2 + (50% x T_TORN-D)
    CMU TN1-20
    510.223 EDF ENERGY NUCLEAR …
    Prequalified
  • ✓ Prequalified
  • 2024-25
    Capacity Information
    De-Rated Capacity
    510.223
    Connection/DSR Capacity
    626.579
    Anticipated Capacity
    510.223
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Nuclear
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Organization
    Name of Applicant
    EDF ENERGY NUCLEAR GENERATION LIMITED
    Company Name
    N/A
    Parent Company
    EDF Energy Holdings Limited
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    No
    _id
    11792
    CMU ID
    TN1-20
    Auction
    Capacity Auction
    Auction Name
    2024-25 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Torness Power Station CMU 1
    Name of Applicant
    EDF ENERGY NUCLEAR GENERATION LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Secondary Trading Contact - Telephone
    '+442081861004
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2024-25T-42024-25 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID:Not available
    View Details: Location Page
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NT 745 752
    • Location and Post Code: EDF Energy, Torness power station, Torness, Dunbar, East Lothian, EH42 1QU
    • Generating Technology Class: Nuclear
    • Description of CMU Components: Torness Power Station CMU 1: [TN1-20] T_TORN-1 + (50% x T_TORN-D)
    CMU TN1-19
    508.907 EDF ENERGY NUCLEAR …
    Prequalified (2)
  • ✓ Prequalified
  • ✓ Prequalified
  • 2023-24 2022-2023
    Capacity Information
    De-Rated Capacity
    508.907
    Connection/DSR Capacity
    626.579
    Anticipated Capacity
    508.907
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Nuclear
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Name of Applicant
    EDF ENERGY NUCLEAR GENERATION LIMITED
    Company Name
    N/A
    Parent Company
    EDF Energy Holdings Limited
    Registered Holder
    EDF ENERGY NUCLEAR GENERATION LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2023-TN1-19-001
    Agreement Term
    1
    _id
    10325
    CMU ID
    TN1-19
    Auction
    Capacity Auction
    Auction Name
    2023-24 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Torness Power Station CMU 1
    Name of Applicant
    EDF ENERGY NUCLEAR GENERATION LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2020-04-17
    Auction Acquired Capacity Obligation
    508.907
    Secondary Trading Contact - Telephone
    '+442081861004
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2023/2024
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2023-24T-42023-24 (T-4) Four Year Ahead Capacity Auction(2 components)
    29.55 MW Prequalified
    Component ID: 11981
    View Details: Component Page Location Page
    Capacity: 29.55 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NT 745 752
    • Location and Post Code: EDF Energy, Torness power station, Torness, Dunbar, East Lothian, EH42 1QU
    • Generating Technology Class: Nuclear
    • Description of CMU Components: Torness Power Station CMU 1: [TN1-19] T_TORN-1 + (50% x T_TORN-D)
    2022-23T-?2022-23 (T-3) Three Year Ahead Capacity Auction
    Prequalified
    Component ID:Not available
    View Details: Location Page
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NT 745 752
    • Location and Post Code: EDF Energy, Torness power station, Torness, Dunbar, East Lothian, EH42 1QU
    • Generating Technology Class: Nuclear
    • Description of CMU Components: Torness Power Station CMU 1: [TN1-19] T_TORN-1 + (50% x T_TORN-D)
    CMU TN2-19
    522.167 EDF ENERGY NUCLEAR …
    Prequalified (2)
  • ✓ Prequalified
  • ✓ Prequalified
  • 2023-24 2022-2023
    Capacity Information
    De-Rated Capacity
    522.167
    Connection/DSR Capacity
    642.905
    Anticipated Capacity
    522.167
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Nuclear
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Termination Fee Rate 1
    £5000.00 /MW
    Termination Fee Rate 2
    £25000.00 /MW
    Termination Fee Rate 3
    £10000.00 /MW
    Termination Fee Rate 4
    £15000.00 /MW
    Termination Fee Rate 5
    £35000.00 /MW
    Annual Penalty Cap
    1
    Monthly Penalty Cap
    2
    Organization
    Name of Applicant
    EDF ENERGY NUCLEAR GENERATION LIMITED
    Company Name
    N/A
    Parent Company
    EDF Energy Holdings Limited
    Registered Holder
    EDF ENERGY NUCLEAR GENERATION LIMITED
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    Yes
    Agreement ID
    CAN-2023-TN2-19-001
    Agreement Term
    1
    _id
    10326
    CMU ID
    TN2-19
    Auction
    Capacity Auction
    Auction Name
    2023-24 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Torness Power Station CMU 2
    Name of Applicant
    EDF ENERGY NUCLEAR GENERATION LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Date of Issue of Capacity Agreement
    2020-04-17
    Auction Acquired Capacity Obligation
    522.167
    Secondary Trading Contact - Telephone
    '+442081861004
    Duration of Capacity Agreement Awarded
    1
    Delivery Years for which Agreement Valid
    2023/2024
    Duration of Capacity Agreement in First Bidding Round
    1
    Auction Participation History
    2023-24T-42023-24 (T-4) Four Year Ahead Capacity Auction
    Prequalified
    Component ID:Not available
    View Details: Location Page
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NT 745 752
    • Location and Post Code: EDF Energy, Torness power station, Torness, Dunbar, East Lothian, EH42 1QU
    • Generating Technology Class: Nuclear
    • Description of CMU Components: Torness Power Station CMU 2: [TN2-19] T_TORN-2 + (50% x T_TORN-D)
    2022-23T-?2022-23 (T-3) Three Year Ahead Capacity Auction
    Prequalified
    Component ID:Not available
    View Details: Location Page
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NT 745 752
    • Location and Post Code: EDF Energy, Torness power station, Torness, Dunbar, East Lothian, EH42 1QU
    • Generating Technology Class: Nuclear
    • Description of CMU Components: Torness Power Station CMU 2: [TN2-19] T_TORN-2 + (50% x T_TORN-D)
    CMU TN2-18
    531.541 EDF ENERGY NUCLEAR …
    Prequalified
  • ✓ Prequalified
  • 2022-23
    Capacity Information
    De-Rated Capacity
    531.541
    Connection/DSR Capacity
    631.284
    Anticipated Capacity
    531.541
    Max Obligation Period
    1
    Unit Information
    CMU Type
    CMRS
    Primary Fuel
    Nuclear
    Category
    Existing Generating CMU
    Storage Facility
    No
    Commercial Information
    Organization
    Name of Applicant
    EDF ENERGY NUCLEAR GENERATION LIMITED
    Company Name
    N/A
    Parent Company
    EDF Energy Holdings Limited
    Opt Out Status
    Opt-In
    Agreement Details
    Agreement Awarded
    No
    _id
    8815
    CMU ID
    TN2-18
    Auction
    Capacity Auction
    Auction Name
    2022-23 (T-4) Four Year Ahead Capacity Auction
    CM Unit Name
    Torness Power Station CMU 2
    Name of Applicant
    EDF ENERGY NUCLEAR GENERATION LIMITED
    Pre-Qualification Decision
    Prequalified
    Transmission / Distribution
    Transmission
    CMU confirmed entry into Auction
    Yes
    Secondary Trading Contact - Email
    [email protected]
    Secondary Trading Contact - Telephone
    '+442081861004
    Auction Participation History
    2022-23T-42022-23 (T-4) Four Year Ahead Capacity Auction(2 components)
    42.46 MW Prequalified
    Component ID: 11993
    View Details: Component Page Location Page
    Capacity: 42.46 MW
    Status: Prequalified
    Auction-specific values (differ from CMU baseline):
    • OS Grid Reference: NT 745 752
    • Location and Post Code: EDF Energy, Torness power station, Torness, Dunbar, East Lothian, EH42 1QU
    • Generating Technology Class: Nuclear
    • Description of CMU Components: Torness Power Station CMU 2: [TN2-18] T_TORN-2 + (50% x T_TORN-D)
    Welcome to Capacity Market Search
    🗺️ 1 week free trial to explore all features!

    You can explore the basic features, but will need to register for continued access to premium features like the interactive map.

    Choose your contribution amount
    Unlimited access to all premium features

    Secure payment • No subscription • Lifetime access